TEXAS UTILITIES GENERATING COMI%NY 2rK)1 IIILYAN TOh Eit 1).sf.!AN.TI:X As 7520 December 15, 1978 TXX-2926 n;om
"."n ':..? '"'. ?l:'
fir. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. fluclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket flos. 50-445 Arlington, Texas 76011 50-446 C0f!AflCHE PEAK STEAf! ELECTRIC STATI0fl 1981-83 2300 ISl INSTALLATION WELDING ACTIVITIES FOR UNIT NO. 1 REACTOR COOLANT SYSTEM, MAlti LOOP PIPING FILE NO. 10110
Dear Mr. Seidle:
On October 23, 1978, we verbally informed your Mr. R. G. Taylor of a procedural violation in the welding activities for the Unit flo.1, Reactor Coolar.t System, l'ain loop Piping.
We submitted an interim response logged TXX-2913 that advised you that we were continuing our investigaticn and evaluation.
We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e).
Records supporting these determinations are available for your Inspector's review at the CPSES site.
Very truly yours, M
R.Id. Gary RJG:dla cc:
ilRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement-(15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. fluclear Regulatory Commission Washington, D.C.
20555 7 81~9 280109