Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211B600 + (Part II to Environ Radiological Studies Downstream from Rancho Seco Nuclear Power Generating Station - 1985.Apps)
- ML20154M254 + (Part II to Environ Radiological Studies Downstream from Rancho Seco Nuclear Power Generating Station for 1985,Apps, Final Rept)
- RA22-015, Part II, Offsite Dose Calculation Manual + (Part II, Offsite Dose Calculation Manual)
- RS-20-131, Part II: Planning Standards and Criteria + (Part II: Planning Standards and Criteria)
- ML011340116 + (Part III - Regulatory Guide 1.70, Revision 3, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, LWR Edition)
- ML022680450 + (Part III of Rev. 10 to Big Rock Point Plant Updated Final Hazards Summary Report (Ufhsr))
- ML20151U141 + (Part III of Technical Assistance in Support of NRC Reactor Licensing Activities, Technical Proposal)
- ML24266A003 + (Part Three SG Tube Safety Analysis Defense in Depth)
- ML24266A002 + (Part Two SG Tube Safety Analysis FSAR)
- ML13172A361 + (Part Two of the Shine Medical Technologies, Inc. Application for Construction Permit)
- NRC-2024-0130, Part Two: Supplemental Filing to Further Strengthen the Argument That Holtecs Proposed Use of 50.59 Is Flawed and Requires NRC Oversight, Based on NEI 96-07 Guidelines for 10 CFR 50.59 Implementation + (Part Two: Supplemental Filing to Further Strengthen the Argument That Holtecs Proposed Use of 50.59 Is Flawed and Requires NRC Oversight, Based on NEI 96-07 Guidelines for 10 CFR 50.59 Implementation)
- ML20128M197 + (Part W - Radiation Safety Requirements for Wireline Svc Operations & Subsurface Tracer Studies)
- ML021130604 + (Part a - Browns Ferry Nuclear Plant (BFN) - Units 1, 2, & 3 - Annual Radioactive Effluent Release (Arer) Report - January Through December 2001)
- ML021420291 + (Part a - Donald C. Cook Nuclear Plant, Units 1 & 2 - Annual Environmental Operating Report)
- ML021280321 + (Part a - Indian Point 3 Nuclear Plant Annual Radioactive Effluent Release Report for Period of January 1, 2001 Through December 31, 2001)
- ML021430022 + (Part a - Monticello Nuclear Generating Plant 2001 Radioactive Effluent Release Report)
- ML021430249 + (Part a - Oconee Nuclear Station, Supplement to License Amendment Request for Full Scope Implementation of Alternate Source Term Technical Specification Change (TSC) Number 2001-07)
- ML021200067 + (Part a - Perry Nuclear Power Plant Annual Environmental & Effluent Release Report for Period of 01/01/2001 Through 12/31/2001)
- NLS2002012, Part a - Resubmittal of Year 2000 Radioactive Effluent Release Report for Cooper Nuclear Station + (Part a - Resubmittal of Year 2000 Radioactive Effluent Release Report for Cooper Nuclear Station)
- ML021050303 + (Part a - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases)
- ML021420027 + (Part a - Seabrook Station Application for Order & Conforming License Amendments to Transfer Facility Operating License NPF-86)
- ML021190009 + (Part a - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40)
- ML021290310 + (Part a - Susquehanna Steam Electric Station Radioactive Effluent Release Report for 2001 & Offsite Dose Calculation Manual)
- ML021420059 + (Part a - Susquehanna Steam Electric Station, Supplement to Proposed Amendment No. 239 to License NPF-14 & Proposed Amendment No. 204 to License NPF-22, HPCI Automatic Transfer to Suppression Pool Logic Elimination)
- ML021420362 + (Part a - Vogtle Electric Generating Plant - 2001 Annual Report)
- ML043560219 + (Part a Information Request)
- ML19260E302 + (Part a, Surveillance Requirements for Pcrv Overpressure Protection Sys, for Inservice Insp Requirements)
- ENS 53084 + (Part-21 - Auxiliary Feedwater Pump Power Supply Failure)
- ENS 52384 + (Part-21 - Incorrect Capacitor Used on Circuit Boards)
- ENS 53780 + (Part-21 - Rhr Shaft Seal O-Ring Sheared Due to Manufacturer Defect)
- ENS 43666 + (Part-21 Dry Cask Canister Documentation Lost)
- ENS 49083 + (Part-21 Interim Report - Incorrect Pressurizer Support Loads for Ap1000)
- ENS 49303 + (Part-21 Notification - Ap-1000 Time Response for the Safety Analysis Cannot Be Directly Measured)
- ENS 50272 + (Part-21 Notification - Assembly Errors During Breaker Refurbishment)
- ENS 52394 + (Part-21 Notification - Design Basis Errors Using Flo-2D Software)
- ML12153A025 + (Part-21 Notification - Firezone 3HR 600V Cable May Not Function as Tested and Qualified)
- ENS 53193 + (Part-21 Notification - Improper Lugs in a Breaker Cubicle)
- ENS 51309 + (Part-21 Notification - Micro Switch Intermittent Variation in Resistance)
- ENS 49302 + (Part-21 Notification - Motors May Have a Point for Foreign Material Entry)
- ML12153A030 + (Part-21 Notification - Protective Relays May Not Be Qualified for Harsh Environments)
- ENS 50935 + (Part-21 Notification - Sense and Transfer Module Resistive Short)
- ML15089A435 + (Part-21 Notification - Sense and Transfer Module Resistive Short)
- ENS 54001 + (Part-21 Notification - Snubber Hydraulic Fluid Batch Contains Particulates)
- ENS 49301 + (Part-21 Notification - Unqualified Material Used in Electrical Penetration Assemblies)
- ENS 52383 + (Part-21 Notification - Willful Misconduct and Falsification of Records)
- ML17090A397 + (Part-21 Notification - Willful Misconduct and Falsification of Records)
- ML14197A380 + (Part-21 Notification-Assembly Errors During Breaker Refurbishment)
- ENS 51494 + (Part-21 Report - Closed Switch Not Actuating When Valve Is Fully Closed)
- ML16258A456 + (Part-21 Report - Closed Switch Not Actuating When Valve Is Fully Closed)
- ENS 48353 + (Part-21 Report - Faulty Master Trip Units, Slave Units, and Resistance Temperature Detectors)
- ML12319A011 + (Part-21 Report - Faulty Master Trip Units, Slave Units, and Resistance Temperature Detectors)