ENS 50935
ENS Event | |
---|---|
04:00 Jan 30, 2015 | |
Title | Part-21 Notification - Sense and Transfer Module Resistive Short |
Event Description | The following excerpted report was received via e-mail:
Sense & Transfer Module (part number 41-09-339904) was provided to PSEG under purchase order 4500726553. The customer identified an abnormal curve trace (resistive short) on the integrated circuit installed at location IC825 pin 6 on this printed circuit board. The customer performed an evaluation which included dissection of the subject IC [integrated circuit] however, this dissection provided inconclusive results as to the cause of the IC anomaly. At this time, UCI requires additional time to evaluate the results provided by PSEG and to work with the manufacturer in identifying the root cause. UCI currently considers this issue to be an isolated event as no previous instances of this failure have been observed by UCI to date. PSEG has returned the item to UCI for evaluation and rework [received by UCI on 3/25/2015]. If you have any questions or wish to discuss this matter or this report, please contact: Wesley Hickle Procurement Engineer whickle@unitedcontrols.com 770-496-1406 x 165 Potentially affected plants are Salem and Hope Creek.
The following excerpted report was received via e-mail: Follow up to previously reported by United Controls International (UCI) as requiring additional evaluation time and to correct purchase order information previously reported to the NRC with a report in general conformity of the requirements of 10 CFR Part 21.21. Notified R1DO (McKinley) and Part 21 group via email. |
Where | |
---|---|
United Controls International Norcross, Georgia (NRC Region 1) | |
Organization: | United Controls International |
Reporting | |
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
Time - Person (Reporting Time:+1358.55 h56.606 days <br />8.087 weeks <br />1.861 months <br />) | |
Opened: | Luis Sanchez 17:33 Mar 27, 2015 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Mar 22, 2016 |
50935 - NRC Website | |
United Controls International with 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component | |
WEEKMONTHYEARENS 562932022-09-07T17:00:0007 September 2022 17:00:00
[Table view]10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Power Supply Failures ENS 563882022-09-07T05:00:0007 September 2022 05:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Deviation to Qualified Design ENS 562092022-09-07T04:00:0007 September 2022 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Primary/Secondary Power Supply Failures ENS 512432015-06-03T04:00:0003 June 2015 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Potential Part 21 - Allen Bradley Failure to Document Design Change ENS 509352015-01-30T04:00:00030 January 2015 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part-21 Notification - Sense and Transfer Module Resistive Short ENS 503312014-06-04T04:00:0004 June 2014 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 Interim Report - Temperature Switch Set Points Out of Calibration ENS 500132014-03-25T04:00:00025 March 2014 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Potential Defect in General Electric Sb1 Switches and Hea Relays ENS 499402014-03-21T04:00:00021 March 2014 04:00:00 10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component Part 21 - Sbm Selector Switches Contact Assembly Unplanned Manufacturing Change 2022-09-07T05:00:00 | |