Title | Part-21 - Auxiliary Feedwater Pump Power Supply Failure |
Event Description | The following report is an excerpt from a fax from Engine Systems, Inc.:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on October 17, 2017 upon notification of a potential issue with power supply P/N 2938604 supplied to Vogtle Nuclear Plant. The power supply is installed in a safety-related control panel for the Terry Turbine driven auxiliary feedwater pump. Analysis determined the power supply failure was due to an internal rectifier diode failure which resulted in a short circuit on the power supply output. The evaluation was concluded on November 20, 2017 and it was determined that this issue is a reportable defect as defined by 10CFR Part 21. The power supply failure will adversely affect speed control of the turbine driven auxiliary feedwater pump and therefore may prevent safe shutdown of the nuclear reactor. This issue applies to all customers that have power supply P/N 2938604 within the date code range 0648 through 0723. ESI has supplied power supplies within the suspect date code range to [Vogtle and Farley]. Point of Contact: Tom Horner, Quality Manager, 252-977-2720 |
Where | |
---|---|
Engine Systems, Inc. Rockymount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+36.12 h1.505 days <br />0.215 weeks <br />0.0495 months <br />) | |
Opened: | Tom Horner 17:07 Nov 21, 2017 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Nov 21, 2017 |
53084 - NRC Website | |
Engine Systems, Inc. with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 569132023-11-27T05:00:00027 November 2023 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - EMD Cylinder Liner with Bore Deficiency ENS 566032023-05-17T04:00:00017 May 2023 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator - Incorrect Bus BAR Installation ENS 558072022-01-27T04:00:00027 January 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification ENS 545882020-03-19T04:00:00019 March 2020 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Test Stand Deficiency ENS 530842017-11-20T05:00:00020 November 2017 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 - Auxiliary Feedwater Pump Power Supply Failure ENS 530372017-10-25T04:00:00025 October 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start ENS 526422017-03-27T04:00:00027 March 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ENS 514952015-08-26T04:00:00026 August 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Speed Switch Capacitor Failure ENS 498302014-02-10T05:00:00010 February 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing ENS 495342013-10-25T05:00:00025 October 2013 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part21 - Diode Cr7 Wiring Reversed on Automatic Voltage Regulator Panels 2023-05-17T04:00:00 | |