ENS 48353
ENS Event | |
---|---|
16:12 Sep 27, 2012 | |
Title | Part-21 Report - Faulty Master Trip Units, Slave Units, and Resistance Temperature Detectors |
Event Description | On September 27, 2012, the Site Vice President was notified that a 10CFR21 evaluation of thirteen (13) reworked Master Trip Units, Resistance Temperature Detector Units, and Slave Units supplied by Rosemount Nuclear Instruments, Inc. (Rosemount) determined that a non-compliant condition involving a basic component existed.
Rosemount informed James A. FitzPatrick Nuclear Power Plant (JAF) that 13 reworked Master Trip Units, Resistance Temperature Detector (RTD) Units and Slave Units were received at JAF which did not comply with their rebuild repair specification. Specifically, epoxy was not applied under certain resistors as required. In accordance with JA FitzPatrick plant procedures, this condition was determined as a 10CFRPart 21 condition involving a defect in a basic component. As noted by an engineering review, some of the applications for the trip units require them to energize to perform the associated safety functions. Therefore, a failure occurrence by an installed non-conforming unit could potentially have an adverse affect on the associated systems' safety/accident mitigation functions. JAF verified that none of the 13 deficient units were installed in any plant systems. Therefore, this condition had no actual safety consequences as the deficiency was identified by Rosemount prior to installation. The 13 units that were received at JAF without the epoxy have been returned to Rosemount for the addition of the epoxy and have subsequently been reworked and returned to JAF. This notification is made pursuant to 10CFR21.21(d)(3)(i).
Subsequent to the original notification dated 9/27/2012, a study was performed by Rosemount (DS-RNII-2012-049). The study analyzed the reported condition of the Master Trip Units for a Static Coefficient Load Analysis and a calculation of the rigidity of the 2-Watt wire-wound resistor when installed without being secured by epoxy. The conclusion was that there is sufficient design margin to ensure that the resistor will remain rigid during qualified seismic conditions. Based on this assessment, there is not a significant safety concern related to the absence of epoxy and the previous 10 CFR 21.21(d)(3)(i) notification may be retracted. The NRC Resident Inspector has been notified. Notified R1DO (Caruso) and Part 21 group. |
Where | |
---|---|
Fitzpatrick New York (NRC Region 1) | |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+6.08 h0.253 days <br />0.0362 weeks <br />0.00833 months <br />) | |
Opened: | Jorge O'Farrill 22:17 Sep 27, 2012 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Oct 26, 2012 |
48353 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48353\u003C/a\u003E - \u003Ca href=\"/FitzPatrick\" title=\"FitzPatrick\"\u003EFitzPatrick\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPart-21 Report - Faulty Master Trip Units, Slave Units, and Resistance Temperature Detectors\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48353 - FitzPatrick\n","link":"","lat":43.52241111111111,"lon":-76.39899444444444,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (92 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 571172024-02-22T04:00:00022 February 2024 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator Cylinder Liner Leak ENS 570722024-02-22T04:00:00022 February 2024 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Leaking Cylinder Liner in Emergency Diesel Generator ENS 483532012-09-27T16:12:00027 September 2012 16:12:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 Report - Faulty Master Trip Units, Slave Units, and Resistance Temperature Detectors 2024-02-22T04:00:00 | |