Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003E177 + (PV-2019-10 Final Op Test Do Not Release Until March 2022)
- ML20042C044 + (PV-2019-10 Final Outlines Delayed Release Until March 2022)
- ML20003E235 + (PV-2019-10 Final Written Exam Do Not Release Until March 2022)
- ML20003E276 + (PV-2019-10 Post Exam Comments and Analysis)
- ML20042C119 + (PV-2019-10 Public Forms)
- ML22144A028 + (PV-2022-05-DRAFT Written Exam)
- ML22144A027 + (PV-2022-05-DRAFT Written Exam Comments)
- ML22144A026 + (PV-2022-05-Draft Outlines)
- ML22143A987 + (PV-2022-05-FINAL Op Test)
- ML22143A988 + (PV-2022-05-FINAL Written Exam)
- ML22144A029 + (PV-2022-05-Final Outlines)
- ML23193A850 + (PV-2022-05-Form 2.3-1 Examination Outline Quality Checklist)
- ML22143A989 + (PV-2022-05-Post Exam Comments)
- ML22178A177 + (PV-2022-05-Public Forms)
- ML24253A193 + (PV-2024-04 Exam Security Agreement (Final))
- ML020980604 + (PV-7-2001-Draft Operating Outlines)
- ML20055E109 + (PV2019006 Annual Assessment Letter)
- ML060820402 + (PVNGS 1-2-3, Transmittal of Final ASP Analysis of ECCS Piping Void Issue)
- ML17305B273 + (PVNGS 1991 Business Plan)
- ML20044H099 + (PVNGS 1993 Emergency Preparedness Exercise)
- ML17306A721 + (PVNGS Annual Environ Operating Rept for 1991)
- ML17312B398 + (PVNGS Annual Environ Operating Rept for 1996)
- ML24354A201 + (PVNGS EP Exercise Inspection March 2025 RFI)
- ML19346H635 + (PVNGS Emergency Plan, Revision 65)
- ML110610762 + (PVNGS Insertion Instructions for Technical Specifications Bases Changed Pages, Revision 54)
- ML20086C000 + (PVNGS Ipeee)
- ML21023A021 + (PVNGS PI&R Request for Information RA)
- ML042590501 + (PVNGS Quality Assurance (QA) Program Reduction in Commitment)
- ML061940481 + (PVNGS Request for Followup Inspection - NRC Supplemental Inspection Report 05000528-05-012; 05000529-05-012; and 05000530-05-012)
- ML17310B160 + (PVNGS Rev 1 to Unit 2,Cycle 5 Core Operating Limits Rept)
- ML19347D106 + (PVNGS Security Inspection Information Request 2020412)
- ML12214A264 + (PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14)
- ML20213C700 + (PVNGS Security Team Inspection Docs Request 2020411)
- ML14255A066 + (PVNGS Technical Requirements Manual (Trm), Revision 61, Replacement Pages and Insertion Instructions)
- ML110610757 + (PVNGS Technical Requirements Manual, Revision 54. List of Effective Pages)
- ML14255A064 + (PVNGS Technical Specification Bases (TS Bases), Revision 60, Replacement Pages and Insertion Instructions)
- ML110610763 + (PVNGS Technical Specification Bases, Revision 54)
- ML17310B077 + (PVNGS Unit 1 Cycle 5 Startup Rept)
- ML20116K199 + (PVNGS Unit 1 SG Eddy Current Exam,Third Refueling Outage, Mar 1992)
- ML090580197 + (PVNGS Unit 1, Nine Month Supplemental (Post-Outage) Response to NRC Generic Letter 2008-01)
- ML20113E163 + (PVNGS Unit 3 SG Eddy Current Exam Fifth Refueling Outage Nov 1995)
- ML22252A035 + (PVNGS Units 1, 2, and 3 - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000528/2022401; 05000529/2022401; 05000530/2022401)
- ML17082A446 + (PVNGS Units 1, 2, and 3 Transition to CE 16x16 Ngf - Draft RAIs Rev 3)
- IR 05000529/2016009 + (PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) and)
- ML042960549 + (PVNGS Updated FSAR, Ldcr 02-F023, Revision 12)
- ML101100631 + (PVNGS, Units 1, 2 and 3, Docket Nos. Stn 50-528, 50-529, and 50-530, Reply from Us Dept.Of the Interior, Us Fish and Wildlife Service, Arizona Ecological Services Field Office Ref Request for Info on Threatened and Endangered Species)
- ML16154A583 + (PVNGS, Units 1, 2, and 3 - Technical Requirements Manual, Revision 63, Replacement Pages and Insertion Instructions)
- ML16154A581 + (PVNGS, Units 1, 2, and 3 - Technical Requirements Manual, Revision 63)
- ML16154A580 + (PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 - Replacement Pages and Insertion Instructions)
- ML16154A548 + (PVNGS, Units 1, 2, and 3 - Technical Specification (TS) Bases Revision 63 and Technical Requirements Manual (TRM) Revision 63)
- ML16154A614 + (PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63)