MONTHYEARML19331A3612019-11-26026 November 2019 Supplemental Response to NRC Request for Additional Information Regarding License Amendment and Exemption Requests Related to the Implementation of Framatome CE16HTP Fuel ML19060A2982019-03-0101 March 2019 Transmittal of Audit Presentation Slides Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome CE16HTP Fuel ML18296A4662018-10-18018 October 2018 Supplemental Information Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML17076A3702017-03-16016 March 2017 Submittal of Proprietary Westinghouse Information Presented at the Regulatory Audit Held on March 8, 2017, at Excel Facility in Rockville, Maryland, Regarding Next Generation Fuel License Amendment Request and Exemption ML15037A0482015-01-29029 January 2015 Transmittal of Affidavit from Areva for RAI Response to Relief Request 52 ML14149A0972014-05-16016 May 2014 Affidavits for Attachments 1 and 2 ML0619404812006-04-15015 April 2006 PVNGS Request for Followup Inspection - NRC Supplemental Inspection Report 05000528-05-012; 05000529-05-012; and 05000530-05-012 ML0605404402006-02-14014 February 2006 Request for Amendment to Technical Specification 3.6.3, Containment Isolation Valves ML0605204832006-02-0909 February 2006 30-Day Option 1 Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications. ML0517901982005-06-17017 June 2005 Supplement to Request for a License Amendment to Support Replacement of Steam Generators and Uprated Power Operations Concerning Reactor Drain Tank Room Hydrogen Concentration ML0517301092005-06-0707 June 2005 Reply to a Notice of Violation, EA-05-051, and Statement as to Payment of Civil Penalty ML0515204132005-05-26026 May 2005 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity and Steam Generator Tube Inspection Length Through the Tubesheet ML0504503422005-01-20020 January 2005 Response to Information Request in NRC Special Inspection Report 05000528-04-014; 05000529-04-014; 05000530-04-014 ML0500402352004-12-27027 December 2004 Submittal of Recirculation Sump Void Testing and Probabilistic Risk Assessment Preliminary Results ML15350A2151985-09-0505 September 1985 Overview Description of Core Operating Limit Supervisory System (Colss)(Rev 00-NP to CEN-312-NP) 2019-03-01
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
A subsidiary of Pinnacle West Capital Corporation James M. Levine Mail Station 7602 Palo Verde Nuclear Executive Vice President Tel (623) 393-5300 PO Box 52034 Generating Station Generation Fax (623) 393-6077 Phoenix, Arizona 85072-2034 102-05462-JML/SAB/RJR April 15, 2006 Dr. B. S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units: 1, 2, and 3 Dockets: 50-528, 50-529 and 50-530 NRC Supplemental Inspection Report 05000528/2005012; 05000529/2005012; and 05000530/2005012- Request for Follow-up Inspection On January 27, 2006, Arizona Public Service Company (APS) received NRC Supplemental Inspection Report 2005012 documenting the results of a supplemental inspection at PVNGS using Inspection Procedure 95002, "Inspection For One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area." The NRC concluded that an adequate root cause evaluation of the design control violation had been performed but that certain corrective actions were incomplete at the time of the inspection. Specifically, the NRC identified that for each of the root and contributing causes not all corrective actions had been sufficiently developed to provide the necessary assurance that the identified performance deficiencies would be adequately addressed. Some of the corrective actions that had been taken were identified as being narrowly focused or, in themselves, had not been fully effective. In addition, the NRC concluded that measures of effectiveness that had been established were not sufficient to ensure that corrective actions would be verified to have been effective in improving performance in the affected areas. Consequently, the NRC did not have the necessary assurance to close the design control violation and requested that APS inform them in writing once steps were completed to address these issues.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Dr. Bruce Mallett Request for Follow-up Inspection Page 2 On March 30, 2006, APS senior management met with the NRC to present the comprehensive integrated improvement plan that is being implemented at PVNGS. In that meeting APS presented the elements of the integrated plan and discussed the progress that has been made to date. As part of that plan, APS has been making significant progress on the corrective actions that were incomplete at the time of the inspection. As discussed in the management meeting, a performance improvement model is being used which not only implements identified corrective actions but also monitors those corrective actions for effectiveness and makes necessary improvements if the intended results are not being achieved. These same program attributes are being applied to the actions resulting from the design control violation. APS believes sufficient progress has been and is being made such that a re-inspection of the design control performance deficiencies is requested in early June 2006.
Should you have any questions, please contact Craig Seaman at (623) 393-5421.
There are no commitments being made in this letter.
Sincerely, JML/SAB/RJR cc: B.S. Mallett NRC Region IV Regional Administrator M. B. Fields NRC NRR Project Manager G. G. Warnick NRC Senior Resident Inspector for PVNGS Nuclear Regulatory Commission, Document Control Desk, Washington, DC 20555-0001
Dr. Bruce Mallett Request for Follow-up Inspection Page 3 INTERNAL USE ONLY bcc:
Name Station J. M. Levine
- M. K. Banks 7615 L. A. Nunez (OSRC)
- Adobe portable document format (.pdf)
Dr. Bruce Mallett Request for Follow-up Inspection Page 4 SOURCE DOCUMENTS:
- 1) NRC Supplemental Inspection Report 2005012 VERIFICATION OF ACCURACY RA Preparer: I have prepared the attached document and validated selected statements of fact to the identified source and Licensing Basis documents (QV&V).
_'_-_% _-"'_ Rich Rogalsk, _"/' V/O (
,S_gnatur_'-" Printed Date RA Peer Reviewer: I have reviewed the attached document for completeness, QV&V adequacy and submittal quality.
!_,_ _ Glenn Michael _//_'/0_
Signature Printed Date Other Licensing Document Changes: Check NO or List LDCR numbers Type No Yes LDCR or Tracking no.
UFSAR X TS Bases X TRM X Other X COMMITMENTS:
There are no NRC commitments in this letter.
EXTERNAL CORRESPONDENCE PVNGS Document Authorization Routing Slip _/ _:
REGULATORY AFFAIRS /0_" 0_-- _-"
DATE: 02/11106 Speciallnstructions File Name: H:/
NRNSCOTTB/95002Reinspectionrequest4142 006.doc BRIEFDESCRIPTION:
Request for follow-up inspection DUE TO NRC ON: April 18, 2006 HARDDUE DATE: No TO FINAL APPROVER Target Date: March 31, 2005 Actual Date: / / Signature Date: / /
(To Final Reviewer 3 Days Prior to Due Date) (Date Final Reviewer Received) (Date Approved/Letter Date)
ROUTE TO SIGNATURE REVIEW INITIALS AND DATE INDIVIDUAL STA. REQUIRED REQUIRED REVIEWED/APPROVED COMMENTS S. A. Bauer 7636 X _ U/] _f/,O_
C. K. Seaman 7636 X (_ _k_///_6 J. M. Levine 9046 XX _ _(/t_/[o,¢ RETURN TO: Gall "_;_t_l_2_-j FOR QUESTIONS, CONTACT: Rich Rogalski MAIL STATION: 7636 EXT.: x 5806