Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-99-031, on 990701,Susquehanna Unit 1 Automatically Shut Down from 100% Power,Due to High Neutron Flux Signal Caused by C Outboard MSIV Closing.Region I Public Affairs Is Prepared to Respond to Media Inquiries + (PNO-I-99-031:on 990701,Susquehanna Unit 1 Automatically Shut Down from 100% Power,Due to High Neutron Flux Signal Caused by C Outboard MSIV Closing.Region I Public Affairs Is Prepared to Respond to Media Inquiries)
- PNO-I-99-032, on 990713,licensee Contacted NRC Headquarters Operations Officer to Rept Loss of Package Containing 2 Mci of Liquid I-125.Licensee Contacting Federal Express to Determine If Package Was Actually Delivered + (PNO-I-99-032:on 990713,licensee Contacted NRC Headquarters Operations Officer to Rept Loss of Package Containing 2 Mci of Liquid I-125.Licensee Contacting Federal Express to Determine If Package Was Actually Delivered)
- PNO-I-99-033, on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault + (PNO-I-99-033:on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault)
- PNO-I-99-035, on 990724,Calvert Cliffs,Unit 1 Automatically Shutdown from 100% Power.All Control Rods Fully Inserted & All Safety Equipment Operated as Designed During & Following Shutdown.Licensee Plans to Replace a Phase Bushing + (PNO-I-99-035:on 990724,Calvert Cliffs,Unit 1 Automatically Shutdown from 100% Power.All Control Rods Fully Inserted & All Safety Equipment Operated as Designed During & Following Shutdown.Licensee Plans to Replace a Phase Bushing)
- PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action + (PNO-I-99-036:on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action)
- PNO-I-99-037, on 990505,for Docket 4009043,determined That Four of Slugs Were Missing.Licensee Performed Visual Search of Facility & Radiation Survey But Was Unable to Locate Missing Slugs.Region I Will Perform Reactive Insp + (PNO-I-99-037:on 990505,for Docket 4009043,determined That Four of Slugs Were Missing.Licensee Performed Visual Search of Facility & Radiation Survey But Was Unable to Locate Missing Slugs.Region I Will Perform Reactive Insp)
- PNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting + (PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting)
- PNO-I-99-041, on 990908,Region I Was Notified by Licensee That Shipped Package Containing Generally Licensed Devices Had Failed to Arrive at Destination.Licensee Is Working with Fedex to Locate Package.States of Nj & Oh Notified + (PNO-I-99-041:on 990908,Region I Was Notified by Licensee That Shipped Package Containing Generally Licensed Devices Had Failed to Arrive at Destination.Licensee Is Working with Fedex to Locate Package.States of Nj & Oh Notified)
- PNO-I-99-041A, on 990908,Metorex,Inc Notified Region I That Package Containing Two Heps Probes Housing Sealed Sources Shipped by Fedex Failed to Arrive at Destination.On 990913, Package Located in Good Condition & Delivered to Customer + (PNO-I-99-041A:on 990908,Metorex,Inc Notified Region I That Package Containing Two Heps Probes Housing Sealed Sources Shipped by Fedex Failed to Arrive at Destination.On 990913, Package Located in Good Condition & Delivered to Customer)
- PNO-I-99-042, on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified + (PNO-I-99-042:on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified)
- PNO-I-99-042A, on 990927,DC Fabricators Notified Region I That Package Had Been Located on Premises of Tn Technologies.Region I Public Affairs Ofc Is Available to Respond to Public.States of Nj & Tx Have Been Notified + (PNO-I-99-042A:on 990927,DC Fabricators Notified Region I That Package Had Been Located on Premises of Tn Technologies.Region I Public Affairs Ofc Is Available to Respond to Public.States of Nj & Tx Have Been Notified)
- PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power + (PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power)
- PNO-I-99-045, on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill + (PNO-I-99-045:on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill)
- PNO-I-99-046, on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded + (PNO-I-99-046:on 991008,NMP,Unit 1 Declared Unusual Event,Due to Carbon Dioxide Discharge in Records Storage Room of Administration Bldg,Which Was Migrating Beyond Confines of Storage Room.Nrc Resident Inspector Staff Responded)
- PNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H + (PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H)
- ML20213G734 + (PNO-I-DRILL86-1:during Fuel Handling in Spent Fuel Pool to Inspect Fuel Suspected to Contain Failed Fuel,Handling Machine Became Stuck in Upright Position W/Fuel in Machine. Fuel Remained Submerged in Pool)
- ML19290E863 + (PNO-I80-032:on 800220,while Moving New Fuel Into Containment,W/Fuel Assembly in up-ender,control Element Assembly Inadvertently Withdrawn from Assembly by Fuel Handling Machine)
- ML20198Q401 + (PNO-IE-83-008:on 830601,telcon from D Rawlins & C Draughon of Westinghouse Notified I Villalva of Potential Defects in Heat Sinks on Nlp Cards & Relays on Ntc Cards,Both of Which Used in W 7300 Process Protection Systems)
- ML20057A258 + (PNO-IE-84-002:updates Earlier Preliminary Notification on Fixed Co-60 Contaminated Plumbing Fittings)
- PNO-II-02-015, Lost Annunciation in Control Room + (PNO-II-02-015 - Lost Annunciation in Control Room)
- PNO-II-02-024, Potential Employee Strike at North Anna & Surry Nuclear Stations + (PNO-II-02-024 -- Potential Employee Strike at North Anna & Surry Nuclear Stations)
- PNO-II-02-024A, Employee Strike at North Anna & Surry Nuclear Plants + (PNO-II-02-024A, Employee Strike at North Anna & Surry Nuclear Plants)
- PNO-II-02-031, Fire and Trip of the 1C Service Water Pump + (PNO-II-02-031: Fire and Trip of the 1C Service Water Pump)
- PNO-II-02-032, Norification of Unusual Event Due to Fire in Turbine Building at McGuire, Unit 2 + (PNO-II-02-032: Norification of Unusual Event Due to Fire in Turbine Building at McGuire, Unit 2)
- PNO-II-02-034, Unusual Event Delared + (PNO-II-02-034: Unusual Event Delared)
- PNO-II-02-036, Unusual Event Declared + (PNO-II-02-036, Unusual Event Declared)
- ML022730554 + (PNO-II-02-36A - Unusual Event Declared)
- PNO-II-03-014, Vogtle Unit 2 Shutdown to Investigate and Repair Mechanical Seal Leak on Reactor Vessel Head + (PNO-II-03-014: Vogtle Unit 2 Shutdown to Investigate and Repair Mechanical Seal Leak on Reactor Vessel Head)
- PNO-II-03-016, Alert Declared at Sequoyah Nuclear Plant + (PNO-II-03-016: Alert Declared at Sequoyah Nuclear Plant)
- PNO-II-03-016A, Update on Alert at Sequoyah Nuclear Plant + (PNO-II-03-016A: Update on Alert at Sequoyah Nuclear Plant)
- PNO-II-03-017, Shutdown to Investigate & Repair Reactor Vessel Head Leak + (PNO-II-03-017 - Shutdown to Investigate & Repair Reactor Vessel Head Leak)
- PNO-II-03-019, Region II Response to Hurricane Isabel + (PNO-II-03-019 - Region II Response to Hurricane Isabel)
- PNO-II-04-003, Surry Unit 2 Reactor Trip and Auxiliary Feedwater System Issues Causing a Unit Shutdown to Cold Shutdown + (PNO-II-04-003: Surry Unit 2 Reactor Trip and Auxiliary Feedwater System Issues Causing a Unit Shutdown to Cold Shutdown)
- PNO-II-04-006, Region II Response to Hurricane Charley + (PNO-II-04-006 - Region II Response to Hurricane Charley)
- PNO-II-04-007, Region II Response to Hurricane Charley + (PNO-II-04-007 Region II Response to Hurricane Charley)
- PNO-II-04-007A, Update - Region II Response to Hurricane Charley + (PNO-II-04-007A Update - Region II Response to Hurricane Charley)
- PNO-II-04-008, Region II Response to Hurricane Frances + (PNO-II-04-008: Region II Response to Hurricane Frances)
- PNO-II-04-008A, Region II Response to Hurricane Frances + (PNO-II-04-008A: Region II Response to Hurricane Frances)
- PNO-II-04-009, Region II Response to Hurricane Jeanne + (PNO-II-04-009, Region II Response to Hurricane Jeanne)
- PNO-II-04-009A, Region II Response to Hurricane Jeanne + (PNO-II-04-009A, Region II Response to Hurricane Jeanne)
- PNO-II-04-009B, Region II Response to Hurricane Jeanne + (PNO-II-04-009B, Region II Response to Hurricane Jeanne)
- PNO-II-04-012, Fire in Turbine Bearing Area Results in Shutdown Greater than Two Days + (PNO-II-04-012, Fire in Turbine Bearing Area Results in Shutdown Greater than Two Days)
- ML042510575 + (PNO-II-04-08C; Florida Power & Light & Progress Energy- Florida Power Corporation, Tropical Storm Frances)
- PNO-II-05-002, Vogtle Unit 2, Shutdown to Repair Condenser Tube(S) Leak + (PNO-II-05-002: Vogtle Unit 2, Shutdown to Repair Condenser Tube(S) Leak)
- PNO-II-05-003, Fire in the Main Transformer + (PNO-II-05-003: Fire in the Main Transformer)
- PNO-II-05-004, Brunswick Steam Electric Plant Units 1 & 2, TS Required Shutdown Due to Inoperability of All Emergency Diesel Generators + (PNO-II-05-004: Brunswick Steam Electric Plant Units 1 & 2, TS Required Shutdown Due to Inoperability of All Emergency Diesel Generators)
- PNO-II-05-005, Oconee, Unit 3, Reactor Trip with Emergency Core Cooling System (ECCS) Initiation + (PNO-II-05-005: Oconee, Unit 3, Reactor Trip with Emergency Core Cooling System (ECCS) Initiation)
- PNO-II-05-006, Brunswick Steam Electric Plant, Units 1 & 2, Region II Response to Hurricane Ophelia + (PNO-II-05-006: Brunswick Steam Electric Plant, Units 1 & 2, Region II Response to Hurricane Ophelia)
- PNO-II-05-008, St. Lucie Nuclear Plant Units 1 & 2, Region II Response to Hurricane Wilma + (PNO-II-05-008: St. Lucie Nuclear Plant Units 1 & 2, Region II Response to Hurricane Wilma)
- PNO-II-05-009, Turkey Point Nuclear Plant Units 3 & 4 - Region III Response to Hurricane Wilma + (PNO-II-05-009: Turkey Point Nuclear Plant Units 3 & 4 - Region III Response to Hurricane Wilma)
- PNO-II-05-010, Edwin I. Hatch Nuclear Plant, Unit 1 - Hatch Unit 1 Main Transformer Fire + (PNO-II-05-010: Edwin I. Hatch Nuclear Plant, Unit 1 - Hatch Unit 1 Main Transformer Fire)