Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19246B831 + (No Objection to Intervenor Township of Lower Alloways Creek 790611 Motion for Extension to Respond to NRC Objection to ASLB Question.Certificate of Svc Encl)
- ML20027A294 + (No Objection to Intervenors Request of 781016 to Subpoena Dr Grahm for the Upcoming Evidentiary Hearing)
- ML19210E829 + (No Objection to Joint Intervenors,Oystershell Alliance,Inc & Save Our Wetlands,Inc 791123 Request for Delayed Filing of Interrogatories.Certificate of Svc Encl)
- ML17207A674 + (No Objection to Licensee Proposed Changes to NPDES Permit. Requests Comments on Changes to ETS Necessary to Accommodate Revision in NPDES Permit)
- ML19250B853 + (No Objection to Movement for Free Philippines 791003 Motion to Amend Intervenor Ctr for Development Policy 790419 Petition to Intervene & Request for Hearing.Certificate of Svc Encl)
- ML19246B771 + (No Objection to Oystershell Alliance,Inc & Save Our Wetlands,Inc 790601 Request for Exemption from Requirement of Filing 20 Copies of Each Document,Per 10CFR2.708(d). Certificate of Svc Encl)
- ML19224C795 + (No Objection to Potomac Alliance 790509 Motion to Amend Petition to Intervene.Petition Adds Contention Re Svc Water Cooling Sys.Certificate of Svc Encl)
- ML19323B383 + (No Objection to Proposal That Licensees Submit Amends to Increase Size of Fire Brigades to Five Persons.Technical Basis for Orders Must Withstand Adjudicatory Process Challenges.Historical Background Info Encl)
- ML19246B789 + (No Objection to Skagit County 790605 Petition to Intervene. ASLB Must Require Intervenors to Indicate,Prior to Hearings, Subj Matters on Which They Will Participate.Certificate of Svc Encl)
- ML19254B229 + (No Objection to Util 790629 Motion for Continuance Pending Final Resolution of Site Availability Issue.Aslb Should Require Util to Make Quarterly Status Repts.Certificate of Svc Encl)
- ML19225A296 + (No Opposition by Util to Citizens Energy Forum & Potomac Alliance Motion for Consolidation.Util Reserves Right to Oppose Future Motion Necessitated by Consolidation,If Motions Appear to Delay Proceedings.Certificate of Svc Encl)
- ML091700411 + (No Port Southport Nc, Inc., Letter Regarding Residents Concern of Safety and Security Equilibrium on Large Marine Container Terminal to Place at Brunswick Nuclear Plant)
- 05000237/LER-1983-022-03, No Position Indication Found for Core Spray Injection Valve Mo 1402-25B.Caused by Equipment Failure & Inadequate Procedure.Breaker Replaced & Corrected Data Sheet Added to Procedure + (No Position Indication Found for Core Spray Injection Valve Mo 1402-25B.Caused by Equipment Failure & Inadequate Procedure.Breaker Replaced & Corrected Data Sheet Added to Procedure)
- 05000482/FIN-2011003-01 + (No Procedure for Debris in Transformed and Tank Yards Prior to Severe Weather)
- 05000305/FIN-2007006-04 + (No Procedure for Determining Availability of Offsite Power Supply When Contingency Analyzer is OOS)
- 05000327/FIN-2007006-02 + (No Procedure for Inspection/Replacement of DG Local Electrical Panel Filters)
- ML25227A132 + (No Record Response to 28 Howell Requests)
- ML102300709 + (No Significant Hazards Consideration Determination for the Exelon Cyber Security License Amendment Request Supplement Dated July 23, 2010)
- 05000498/FIN-2009301-01 + (No Title Listed)
- 05000483/FIN-2012007-02 + (No written procedures provided)
- ML070330510 + (No. 06-466; Letter from the Honorable William K. Suter Granting the Extension of Time)
- ML070330440 + (No. 06-466; Letter to the Honorable William K. Suter Petition for a Writ of Certiorari)
- IR 05000443/2016001 + (No. 1 - Integrated Inspection Report 05000443/2016001)
- ML19029A502 + (No. 1 - Intervenors First Set of Interrogatories to the Licensee)
- 05000272/LER-2078-028-03, No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door + (No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door)
- BSEP 02-0113, No. 1 - Notification of Emergency Response Data System Modification + (No. 1 - Notification of Emergency Response Data System Modification)
- ML18088A954 + (No. 1 - Requests Re-submission of Draft Proposed Technical Specifications)
- ML13114A960 + (No. 1 - Review of Steam Generator Tube Inspection Report for Spring 2012 Refueling Outage)
- ML13254A138 + (No. 1, and Perry Nuclear Power Plant, Unit No. 1 - Replacement of Parent Company Guarantee)
- 05000272/LER-2078-033-03, No. 11 Steam Generator Steam Flow Channel II + (No. 11 Steam Generator Steam Flow Channel II)
- ML19031B574 + (No. 11 and No. 12 Boric Acid Storage Tanks Inoperable)
- ML19031A912 + (No. 12 Containment Fan Coil Unit Inoperable)
- ML19031B178 + (No. 12 Containment Fan Coil Unit Inoperable)
- ML19031A915 + (No. 12 Steam Generator Steam Flow Channel II Inoperable)
- ML19031B063 + (No. 13 Steam Generator Steam Flow Channel I Inoperable)
- 05000272/LER-2077-018-01, No. 14 Reactor Coolant Loop T/Tavg Protection Channel IV Inoperable + (No. 14 Reactor Coolant Loop T/Tavg Protection Channel IV Inoperable)
- ML042920300 + (No. 2 - License Amendment Request Nos. 302 and 173)
- ML021190542 + (No. 2 - Technical Specifications - Changes to Technical Specifications Bases)
- ML033650438 + (No. 2 License Renewal Review and National Historic Preservation Act, Darlington, Chesterfield Counties (Ltr. to P.T. Kuo, Dated: 11/26/03))
- L-04-065, No. 2, Change to Requested Implementation Period for License Amendment Request Nos. 316 and 189 + (No. 2, Change to Requested Implementation Period for License Amendment Request Nos. 316 and 189)
- L-04-100, No. 2, Inservice Testing Programs, Proposed Revisions 1K and 2I, Addenda 1 + (No. 2, Inservice Testing Programs, Proposed Revisions 1K and 2I, Addenda 1)
- ML052840030 + (No. 2, RAI, Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examination)
- L-04-119, No. 2, Response to Request for Additional Information in Support of License Amendment Request Nos. 323 and 194 on Ultimate Heat Sink Design Basis Bounding Limitations + (No. 2, Response to Request for Additional Information in Support of License Amendment Request Nos. 323 and 194 on Ultimate Heat Sink Design Basis Bounding Limitations)
- L-04-132, No. 2, Supplement to License Amendment Request Nos. 321 and 193 + (No. 2, Supplement to License Amendment Request Nos. 321 and 193)
- L-06-024, No. 2; Fitness-For-Duty Program Six Month Report for Second Half of 2005 + (No. 2; Fitness-For-Duty Program Six Month Report for Second Half of 2005)
- ML090400895 + (No. 3 Nuclear Power Plant - Electrical Distribution & Transmission System Diagram)
- ML033320089 + (No. 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station - Request for Additional Information Concerning Relief Request to Use ASME Code Case N-6)
- ML093100166 + (No. 50-225/OL-10-01, Initial Examination Results Letter)
- 05000266/FIN-2005011-03 + (No. 50.59 Safety Evaluation for a 2002 Modification to AFW)
- Information Notice 2018-01, Noble Fission Gas Releases During Spent Fuel Cask Loading Operations + (Noble Fission Gas Releases During Spent Fuel Cask Loading Operations)
- ML19322C748 + (Noble Gas Recovery Study Maritime Nuclear Ship Savannah, Final Rept.Prepared for Aec.Eight Oversized Drawings Encl)