Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20190041, Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructumodernization Plan (MP) 1D, Revision of BTP 7-19 and MP 4B, Strategic Assessment + (Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructumodernization Plan (MP) 1D, Revision of BTP 7-19 and MP 4B, Strategic Assessment)
- ML19025A312 + (Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure - Revision 3)
- ML18016B023 + (Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure, Revision 2)
- ML19085A510 + (Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructumodernization Plan (MP) #1D, Revision of BTP 7-19 and MP #4B, Strategic Assessment)
- ML17277B643 + (Integrated Action Plan to Modernize the Digital Instrumentation and Control Regulatory Infrastructure - Draft Revision 2)
- ML16284A004 + (Integrated Approach on Regulatory Matters)
- IR 05000244/1988015 + (Integrated Assessment Insp Team Insp Rept 50-244/88-15 on 880908-22.Major Areas Inspected:Plant Operations,Maint, Engineering Support Activities,Chemistry & Effluents & Flow of Technical Info)
- ML20154C279 + (Integrated Assessment Team Insp Rept 50-293/88-21 on 880808- -24.No Violations Noted.Major Areas Inspected:Degree of Readiness of Licensee Mgt Controls,Programs & Personnel to Support Safe Restart & Plant Operation)
- IR 05000277/1989081 + (Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81 on 890203-17.Major Areas Inspected: Effectiveness of Restart Plan Corrective Actions & Degree of Readiness of Licensee Mgt Controls)
- ML20129H742 + (Integrated Assessment of Auxiliary Feedwater Sys)
- ML20205L003 + (Integrated Assessment of Training Needs for Reactor Projects Staff)
- ML19224B464 + (Integrated Control Sys Log for 781103-06)
- ML19253A309 + (Integrated Control Sys Reliability Analysis)
- ML20076J859 + (Integrated Control Sys Reliablilty Analysis)
- ML20024C638 + (Integrated Control Sys Response Characteristics Training Manual Book 50)
- ML18018B904 + (Integrated Design Insp Rept 50-400/84-48 on 841203-850213. Weaknesses Noted:Voltage Drop Considerations Improperly Accounted for)
- ML20261C236 + (Integrated Emergency Core Cooling Loss-Of-Power Preoperational Testing. Sheet 1 of 1)
- ML20069B879 + (Integrated FUEL-COOLANT Interaction (Ifci 6.0) Code.Users Manual)
- L-2018-237, Integrated Final Safety Analysis Report Tier 1, Rev. 0 + (Integrated Final Safety Analysis Report Tier 1, Rev. 0)
- ML19344F196 + (Integrated Geophysical & Geological Study of Tectonic Framework of 38th Parallel Lineament in Vicinity of Intersection W/Extension of New Madrid Fault Zone, Annual Progress Rept FY80)
- ML19209A183 + (Integrated Geophysical & Geological Study of Tectonic Framework of 38th Parallel Lineament in Vicinity of Intersection W/Extension of New Madrid Fault Zone, Annual Progress rept,FY79)
- ML20153B394 + (Integrated Geophysical & Geological Study of Tectonic Framework of 38th Parallel Lineament in Vicinity of Its Intersection W/Extension of New Madrid Fault Zone)
- ML22070A145 + (Integrated Human Event Analysis System (IDHEAS) Presentations and Papers)
- PMNS20210292, Integrated Human Event Analysis System (IDHEAS) Public Feedback Session + (Integrated Human Event Analysis System (IDHEAS) Public Feedback Session)
- IR 05000338/2009003 + (Integrated IR 05000338-09-003 & 05000339-09-003 on 04/01/09 - 06/30/09 for North Anna, Units 1 & 2)
- IR 05000424/2009003 + (Integrated IR 05000424-09-003, 05000425-09-003 and Emergency Preparedness IR 05000424-09-501, 05000425-09-501 on 04/01/09 - 06/03/09 for Vogtle, Units 1 & 2)
- ML20148Q263 + (Integrated Implementation Schedule Program Plan)
- ML20148L815 + (Integrated Implementation Schedule Program Plan)
- ML12240A106 + (Integrated Improvement Plan Summary)
- ML14181A872 + (Integrated Insp Rept 50-261/96-14 on 961117-1228.Violations Noted.Major Areas Inspected:Licensee Operations,Maint, Engineering & Plant Support)
- ML20140D272 + (Integrated Insp Rept 50-302/97-05 on 970330-0503.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint, Plant Support & Review of restart-related Open Items)
- ML18102B431 + (Integrated Insp Repts 50-272/97-12 & 50-311/97-12 on 970427-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support)
- ML20140D205 + (Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support)
- IR 05000324/1997007 + (Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support)
- ML20141E945 + (Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support)
- ML17158C146 + (Integrated Insp Repts 50-387/97-02 & 50-388/97-02 on 970225- 0407.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support)
- IR 05000413/1997005 + (Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support)
- ML20137X381 + (Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support)
- IR 05000324/2021002 + (Integrated Inspected Report 05000324/2021002 and 05000325/2021002)
- IR 05000280/2020004 + (Integrated Inspection 05000280/2020004 and 05000281/2020004; and 07200055/2020003)
- ML13134A239 + (Integrated Inspection Included Aspects of Engineering and Construction Activities Performed by TVA Associated with the Watts Bar Nuclear (WBN) Plant Unit 2 Construction Project)
- ML14353A203 + (Integrated Inspection Plan - Calendar Year 2015)
- ML15355A226 + (Integrated Inspection Plan - Calendar Year 2016)
- ML16347A643 + (Integrated Inspection Plan - Calendar Year 2017)
- ML11290A098 + (Integrated Inspection Plant for Fy 2012 - Big Rock Point)
- IR 05000263/2019004 + (Integrated Inspection Re 05000263/2019004)
- IR 05000440/2023001 + (Integrated Inspection Report (05000440/2023001))
- IR 05000250/2024003 + (Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation)
- IR 05000324/2019003 + (Integrated Inspection Report - 05000324/2019003 and 05000325/2019003)
- IR 05000483/2021004 + (Integrated Inspection Report - 05000483/2021004)
- IR 05000395/2023002 + (Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation)
- ML16244A781 + (Integrated Inspection Report 050000247/2016002 and 05000286/2016002 for Second Quarter 2016)