Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- FVY-85-101, Informs That Util Emergency Operations Facility Fully Functional by 850916 & 840612 Confirmatory Order Item 5.C Requirement Met in Advance of Required Date + (Informs That Util Emergency Operations Facility Fully Functional by 850916 & 840612 Confirmatory Order Item 5.C Requirement Met in Advance of Required Date)
- ML20248C798 + (Informs That Util Endorses Response by NUMARC Forwarded Under Cover Ltr & Signed by Jf Colvin Re Advance Notice of Proposed Rulemaking, Acceptance for Products Purchased for Use in Nuclear Power Plant Structures..)
- ML17262A195 + (Informs That Util Endorses Westinghouse Owners Group Repts Re Generic Ltr 83-28 on Reactor Trip Reliability)
- ML20083A792 + (Informs That Util Enlisted Betz Industrial to Perform Chemical Cleaning of Main Condenser in Circulation Water Sys.Info Required in Accordance W/Oh EPA Procedures Encl)
- ML20151R987 + (Informs That Util Erroneously Notified NRC of 851215 Apparent Violation of Tech Spec Requirements Which Resulted in Inoperability of Both ECCS Subsys During Mode 4 Operation.Justification for Nonreportability Provided)
- ML19331A987 + (Informs That Util Establishing Sys to Facilitate Coordination & Use of Common Data within Different Areas. Data & Assumptions Adopted for Std Ref.Continuing Review Not Expected to Produce Addl Differences)
- ML20247E258 + (Informs That Util Evaluated Containment Liner Weld Test Channels W/Test Channel Plugs Installed as Leaktight Structural Boundary)
- ML20126J412 + (Informs That Util Expects to Complete Const on Unit 1 by Oct 1984 & Unit 2 by Oct 1986.NRC Considers Dates Optimistic. Caseload Forecast Panel May Wish to Investigate)
- ML13330B399 + (Informs That Util Expects to Have Requested Info Submitted by 881021.More Immediate Priorities to Return Unit to Svc from Midcycle Outage & to Support Upcoming Refueling Outage Prevented ATWS Info Completion Per Schedule of)
- ML20054L767 + (Informs That Util Expects to Meet Shift Manning Requirements Re NUREG-0737,Item I.A.1.3.2 by 821015,not 820701 as Previously Noted)
- BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 + (Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02)
- LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates + (Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates)
- ML20151Z865 + (Informs That Util Extending Interval Completion Date for Refueling Outage to 881224.Second Inservice Insp Interval Dates Will Now Be 881224-981224)
- ML20199B268 + (Informs That Util Extending Use of Chemical Additive WCT Ferroquest LP7200 to Support Cleaning of Equipment in Secondary Cooling Water Sys at Units 1 & 2)
- ML20086Q846 + (Informs That Util Extending Valve Wall Thickness Verification Program to Include Forged Valves,In Response to)
- ML20028F994 + (Informs That Util Failed to Provide Clarification Re self-cleaning Filter Deficiencies Identified in QA Program Insp Rept 99900752/81-01.ERCW Sys Modified to Compensate for Excessive Pressure Drop Across Filters.Items Closed)
- ML20127M703 + (Informs That Util Filed Application for Authorization to Construct & Operate BWR)
- ML18153A962 + (Informs That Util Filed Two Hundred Pages of Amend 2 to Applicant Environ Rept,Const Permit Stage for Units 2 & 3)
- ML18150A458 + (Informs That Util Filed Two Hundred Pages of Amend 2 to Applicant Environ Rept,Const Permit Stage for Units 2 & 3)
- ML20095L692 + (Informs That Util Finds Info in SALP Rept for 910203-920201 Accurate & That Util Agrees W/Overall Conclusions & Recommendations.Actions in Response to Recommendations to Improve Areas of Weaknesses Identified Being Initiated)
- NUREG-1275, Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys + (Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys)
- ML19345F918 + (Informs That Util Full Response to 810128 Question 2 Will Not Be Provided Until 810217.Certificate of Svc Encl)
- ML20235Y270 + (Informs That Util Fully Endorses Responses Filed by B&W Owners Group to Ucs 870306 Petition for NRC to Suspend OLs of All Plants Utilizing B&W NSSS)
- ML20246D161 + (Informs That Util Fully Meets Requirements of NUREG-0737, Suppl 1 Re Spds.Info on Areas Where Current SPDS Design & NUREG-1342 Requirements Differ Will Be Provided by 890915)
- ML20092N707 + (Informs That Util Furnishing,Under Separate Cover,Coffey County Contingency Plan for Incidents Involving Commercial Nuclear Power & State Plan.Svc List Encl.Related Correspondence)
- L-89-010, Informs That Util GL 89-10 Program Completed + (Informs That Util GL 89-10 Program Completed)
- ML20093B073 + (Informs That Util Had Not Completed Evaluation of Cause of Occurrence Involving Inoperable Fire Dampers)
- GO2-93-014, Informs That Util Has Added Two Addl Substances to Fitness for Duty for-cause Testing Panel.Substances,Including Established cut-off Levels Listed.Change Implemented on 921203 + (Informs That Util Has Added Two Addl Substances to Fitness for Duty for-cause Testing Panel.Substances,Including Established cut-off Levels Listed.Change Implemented on 921203)
- ML20003G507 + (Informs That Util Has Advised That Determination of Reportability Per 10CFR21 Contained in 810306 & 0403 Ltrs Is Closed)
- ML20003G508 + (Informs That Util Has Advised That Determination of Reportability Per 10CFR21 Contained in 810306 & 0403 Ltrs Is Closed)
- ML20210H103 + (Informs That Util Has Agreed to Be Lead Plant for NRC in Response to Recent Industry Initiative.Consequence Evaluation of Util Class 1 Piping in Support of ASME Code Case N-569,encl.Util Commits to Submitting Revised Program)
- U-600950, Informs That Util Has Agreed to Revise Procedure CPS 3319.01, Standby Gas Treatment, Per Sser 8,Section 6.2.5 Re Discussion of Reg Guide 1.7 Compliance + (Informs That Util Has Agreed to Revise Procedure CPS 3319.01, Standby Gas Treatment, Per Sser 8,Section 6.2.5 Re Discussion of Reg Guide 1.7 Compliance)
- ML20035D399 + (Informs That Util Has Been Informed by Dept of Justice (DOJ) That DOJ Has Closed Criminal Investigation of Licensee Re Misrepresentations Concerning Plant DGs & Recommends That Matter Be Pursued by Nrc.W/Certificate of Svc)
- ML20044B909 + (Informs That Util Has Been Registered as User of Certificate of Compliance 9096 in Accordance w/10CFR71.12,per 930222 Request)
- ML20155B722 + (Informs That Util Has Been Unsuccessful in Determining Status &/Or Estimated Completion Date of NRC Evaluation of Licensee Backfit Claim.Assistance in Resolving Matter, Requested)
- ML20097D876 + (Informs That Util Has Begun Development of ISI Program Update & Requests Approval of 1989 Edition of ASME Section XI for Third 10-yr Interval Update,Per 920520 Telcon)
- ML19264B773 + (Informs That Util Has Cancelled Unit 2 & Extended Target Date for Commercial Operation of Unit 1 from Late 1983 to Early 1984.New Fuel Load Date Is June 1983)
- ML20209D418 + (Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr)
- ML20149G293 + (Informs That Util Has Changed Listed TS Bases Pp for Use IAW PINGPs Bases Control Program Re Amend of Spent Fuel Pool Personnel Access Doors)
- ML20196G794 + (Informs That Util Has Changed Listed TS Bases Pp for Use IAW PINGPs Bases Control Program Re Amend of Spent Fuel Pool Personnel Access Doors)
- JPN-98-054, Informs That Util Has Chosen to Propose Configuration Risk Mgt Program Consistent with Guidance of Reg Guide 1.177. Revised TS Amend Page 258f,encl.PORC Has Reviewed Ltr & Concurs with Conclusion + (Informs That Util Has Chosen to Propose Configuration Risk Mgt Program Consistent with Guidance of Reg Guide 1.177. Revised TS Amend Page 258f,encl.PORC Has Reviewed Ltr & Concurs with Conclusion)
- ML20055H209 + (Informs That Util Has Commenced Cash Tender Offer to Purchase Outstanding Shares of Each Class of Common & Preferred Stock of Kansas Gas & Electric Co.Util Convinced That Proposed Merger Will Have No Effect on Plant Operation)
- ML20202H449 + (Informs That Util Has Commitment for Measurement of RCS Level During Shutdown,In Response to GL 88-17)
- ML20107D279 + (Informs That Util Has Committed to Corporate Attendance at All RO Insp Exit Interviews)
- NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request + (Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request)
- U-602786, Informs That Util Has Completed All Actions Associated W/Cal Re Condition of Protective Coatings in Primary Containment & Drywell + (Informs That Util Has Completed All Actions Associated W/Cal Re Condition of Protective Coatings in Primary Containment & Drywell)
- JPN-93-015, Informs That Util Has Completed All Actions Necessary for Response to & Implementation of GL 89-13 Re Svc Water Sys Problems Affecting Safety Related Equipment.Updated Response Encl + (Informs That Util Has Completed All Actions Necessary for Response to & Implementation of GL 89-13 Re Svc Water Sys Problems Affecting Safety Related Equipment.Updated Response Encl)
- JPN-88-059, Informs That Util Has Completed Hydraulic Calculations of Existing Miniflow Configuration for RHR Pumps,Per NRC Bulletin 88-004.Parallel Pump Interaction Not Applicable to RHR Sys & Calculated Miniflow Values Verified W/Pump Mfg + (Informs That Util Has Completed Hydraulic Calculations of Existing Miniflow Configuration for RHR Pumps,Per NRC Bulletin 88-004.Parallel Pump Interaction Not Applicable to RHR Sys & Calculated Miniflow Values Verified W/Pump Mfg)
- ML17265A498 + (Informs That Util Has Completed Implementation of Severe Accident Mgt Program IAW NEI 91-04,Rev 1, Severe Accident Issue Closure Guidelines, Section 5.Implementation of Program Satisfies Commitment Discussed in Util)
- ML20077J764 + (Informs That Util Has Completed Implementation of All Actions Required for Calvert Cliffs Units 1 & 2 to Comply W/Reg Guide 1.97)
- ST-HL-AE-0044, Informs That Util Has Completed Investigation of Speakout Concern 12431,NRC Allegation RIV-93-A-0027.No Safety Issues Noted & Results Available for NRC Review + (Informs That Util Has Completed Investigation of Speakout Concern 12431,NRC Allegation RIV-93-A-0027.No Safety Issues Noted & Results Available for NRC Review)