Southem Calibmla Edison Company P. O. BOX 128 SAN CLEMENTE, CALIFOnNIA 92674 0128
- n. w. nnicoca estre o a ve7.'J".'.I..' ~r'.o.
October 4, 1995
~ * * ' * "
- U.
S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Subject:
Docket Nos. 50-361 and 50-362 Licensee Event Report No.95-011 San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
Letter from Edison (R. W.
srieger) to NRC Document Control Desk dated July 5, 1995;
Subject:
Licensee Event Report 95-011 In accordance with the requirements of 10 CFR 50.73(d), by the referenced letter, Edison provided Licensee Event Report (LER)95-011 for an occurrence involving inoperable fire dampers.
When i
the LER was submitted, Edison had not completed evaluation of the cause(s), and the LER indicated that Edison planned to submit a revision by October 5, 1995 reporting the results of our evaluation.
While conducting the evaluation, Edison determined that additional factors required evaluating and additional time would be necessary to conduct a thorough review.
Edison plans to submit a revision to i
LER 95-011 by November 3, 1995.
If you require any additional information, please so advise.
Sincerely, 1
h
/
i
+
/(9 cc:
L. J.
Callan, Regional Administrator, NRC Region IV T. P. Gwynn, Director, Division of Reactor Safety, Region IV K.
E.
Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 and 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 Institute of Nuclear Power Operations (INPO) hh "f 9510110214 951004
~