Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236V409 + (Informs That Listed Responses Being Made by New York City Bureau of Radiological Health to Impep Draft Team Rept,)
- ML20141A345 + (Informs That Listed Rules Have Been Compatable W/Nrc Requirements.Rule 1200-2-5-.75, Quality Mgt Program for Human Use, Did Not Get Reviewed)
- ML20246M476 + (Informs That Listed Schedular Commitments Fulfill Requirements in Responding to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Based on Review of Util)
- ML20107H064 + (Informs That Listed Sf Shipments Have Left Plant Site as of 750914)
- ML20206C295 + (Informs That Listed Shipments of Troxler Nuclear Gauges Made Into Licensing Area During Oct 1988)
- ML20199A102 + (Informs That Listed Sources Have Been Received for Disposal by Valmet Automation,Inc & Are Now in Possession Under State of Ga Radioactive Matl License Ga 458-2,amend 14,dtd 890103)
- ML20198P806 + (Informs That Listed Sources Have Been Received by Valmet Automation (USA) Inc,Norcross,Ga & Currently in Possession Under Georgia Dept of Natural Resources Radioactive Matl License Ga 458-2.Copy of Ltr Should Be Forwarded to NMSS)
- ML17258B115 + (Informs That Listed Structural Detail Drawings Re SEP Topic III-7.B Re Load Combinations Have Been Forwarded to Lll,Per NRC Request)
- ML20213H030 + (Informs That Listed Submittals,Including Response to NRC 860930 Request for Addl Info Re TMI Action Item II.D.1 on Relief & Safety Valve Testing,Not Received.Revised Schedule for Submittals Requested within 30 Days of Ltr Receipt)
- ML20099B980 + (Informs That Listed Text Pages Should Not Have Been Listed on Page Replacement Instructions for 920630 Submittal of Rev 2 of Updated FSAR for Limerick Generating Station Units 1 & 2)
- ML20216G287 + (Informs That Listed Text Was Voted to Be Integrated During Course of Drafting SRM Re SECY-97-300, Proposed Strategy for Development of Regulations Governing Disposal of High- Level Radwastes in Proposed Repository at Yucca Mountain)
- ML20206P447 + (Informs That Listed Three Individuals No Longer Require Operator License,Per 10CFR50.74(a),at Braidwood Generating Station)
- ML17325A552 + (Informs That Listed Training Programs Accredited by Inpo. Util Now Member of Natl Academy of Nuclear Training, Fulfilling NUREG-0737,Item I.A.2.1,I.A.2.2,I.A.2.3 & I.A.2.7 Requirements.Requests Open Items Be Closed)
- ML20127L226 + (Informs That Listed Valves Found to Leak in Excess of Acceptance Criteria for Local Leak Tests Specified in TS)
- ML20151E589 + (Informs That Listed Vendor Only Vendor to Provide Fasteners to American Nuclear Facility Through Ebasco New York Purchase Order within Last 10 Yrs.List of Suppliers of Fasteners on Waterford 3 Project Through Field Orders Encl)
- ML20125B307 + (Informs That Listed man-days Have Been Expended in Monticello Hearing & Hearings Scheduled for Operating Licenses by End of Year)
- ML20205M104 + (Informs That Listed post-accident Monitoring (Reg Guide 1.97) Instruments Declared Inoperable at Time of Cycle 2 Startup Following First Refueling Outage)
- ML20198Q222 + (Informs That Listed,Generally licensed,Am-241 Sealed Sources Have Been Recently Removed from Facility & Are Now in Possession of Equipment Mfg,Industrial Dynamics,Co,Ltd,In Torrance,Ca.Form 3068 for Each Source,Attached)
- ML20135G052 + (Informs That Listing of All Issued Nsrs Repts & Copies of Unresolved Repts Will Be Forwarded by 850906,per 850821 Request.Summarization of How Each Rept Addressed Will Be Submitted by 850930)
- A07182, Informs That Listing of All nonsafety-related Suppliers & Matl Specs Required in Response to NRC Bulletin 87-002,Suppl 1, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Would Consume Many Man Hours & Not Feasible + (Informs That Listing of All nonsafety-related Suppliers & Matl Specs Required in Response to NRC Bulletin 87-002,Suppl 1, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Would Consume Many Man Hours & Not Feasible)
- ML20138C398 + (Informs That Literature Search List - Tasks 1 & 2 Reviewed.No Objections to Review of Documents Published in mid-1970s.List of Addl Refs Which Should Be Considered Encl)
- ML20237C015 + (Informs That Lm Bobek Has Assumed Responsibilities of Reactor Supervisor for Univ of Ma,Lowell Research Reactor. Info Provided to Facilitate Communications & Delineate Line of Responsibility for Reactor,Listed)
- ML20055G089 + (Informs That Lm Bobek Has Joined Staff as Director of Nuclear Reactor Facility,Effective on 900709)
- ML20205H541 + (Informs That Lm Muntzing Has Reviewed Enclosed Draft Ltr & Would Appreciate Associating It with SECY-R-75-112 for Discussion at 741030 Policy Session)
- ML18101A322 + (Informs That Ln Olshan Holds Project Manager Position for Plant)
- ML18101A315 + (Informs That Ln Olshan Is Project Manager for Plant)
- ML20024D917 + (Informs That Load Flow Analysis 85% Complete & Results of Adequacy of Electrical Distribution Sys Voltages Expected to Be Ready for Submittal in 30 Days.Submittal of Min Grid & Bus Voltages at Battery Charges Delayed Until 830915)
- L-85-115, Informs That Load Handling Procedures & Program for Sling Use & Maint Implemented at Unit 2,per Control of Heavy Load Phase I + (Informs That Load Handling Procedures & Program for Sling Use & Maint Implemented at Unit 2,per Control of Heavy Load Phase I)
- ML20248D254 + (Informs That Load Test of Batteries D105 & D106 Required During Fall 1989,per Tech Spec 15.4.6.B.4 as Suppl to 890821 Response to NRC Re Violations Noted in Insp Repts 50-266/89-21 & 50-301/89-20)
- ML20204H377 + (Informs That Local 387,Utility Workers Union of America,AFL- Cio Voted to Approve New Contract with Entergy Nuclear Generation Co & Voted to Accept Boston Edison Divestiture Agreement)
- ML18141A547 + (Informs That Local Emergency Operations Facilities at North Anna & Surry Power Stations Will Be Functional,Except for Data Communications & Display,By 850731,per NUREG-0737,Suppl 1)
- ML20217N644 + (Informs That Local Representatives in Usa,M/K Sys Inc,Has Not Received Specific License for Ambertec Beta Formation Tester.Copy of Data Sheet & Leak Test Certificate for Source Encl)
- ML20137Y556 + (Informs That Location for Panel Has Changed to Executive Conference Room.Partially Deleted)
- 0CAN088109, Informs That Logistical Support Info Re Anticipated Emergency Notification Sys Upgrade Was Transmitted to C Hackney During 810706 Telcon + (Informs That Logistical Support Info Re Anticipated Emergency Notification Sys Upgrade Was Transmitted to C Hackney During 810706 Telcon)
- ML20073H909 + (Informs That Long Term Actions in Response to Generic Ltr 89-07 Which Addressed Safeguards Contingency Planning for Surface Vehicle Bombs Were Completed During First Quarter 1990)
- ML19347F143 + (Informs That Long Term Containment Purge & Vent Requirements Have Been Met.Forwards Safety Evaluation & Technical Evaluation Rept)
- BSEP-97-0143, Informs That Long Term Mod for Thermal Hydraulic Instability Will Be Implemented in Third Quarter of 1998 for BSEP Unit 1 & 2 + (Informs That Long Term Mod for Thermal Hydraulic Instability Will Be Implemented in Third Quarter of 1998 for BSEP Unit 1 & 2)
- ML20199H959 + (Informs That Long-Term Surveillance Plan,Dtd Aug 1997 for Burro Canyon Disposal Cell at Slick Rock,Co,Adequately Covers Area of Erosion Protection.Issues Re Geotechnical Engineering & Groundwater Resources Protection,Encl)
- ML20209G088 + (Informs That Loose Parts Monitoring Sys Removed from Tech Specs & Requirements for Operability & Surveillance Included in Fsar,Per Tech Spec Improvement program.Marked-up FSAR Pages Encl)
- ML20199J545 + (Informs That Lost Model P-2021,serial 55808,leased from Nrd,Inc,Has Been Located & Will Be Sent Back to Nrd,Inc)
- ML20205C284 + (Informs That Lou Will Not Be Able to Attend 950923 Meeting, Due to Attendance in Headquarters with Chairman Steering Committee.He Will Also Be Gone on 950924 to Work on Vogtle Case)
- ML20217D080 + (Informs That Louisiana Energy Svc Has Formally Withdrawn Application for License to Construct & Operate Claiborne Enrichment Ctr)
- ML20133A138 + (Informs That Louisiana Strongly Emphasize Agreement of Position Stated by Illinois Re Concept of Mutual Cooperation & That Both Parties Should Exercise Best Efforts to Be Compatible W/Each Other)
- ML20205C168 + (Informs That Love Concerns Resolved on Basis of Citation & Licensee Response.Items Considered Closed.Related Info Encl, Including Portions of Reinsp Rept)
- ML19343B652 + (Informs That Low Pressure Gross Leak Test of Containment Must Be Performed Prior to Any Startup from Cold Shutdown. Different Gross Leak Test Ensuring Containment Integrity & Minimizing Personnel Exposure Might Be Allowed)
- ML20005B755 + (Informs That Low Pressure Turbine Disc Crack Initiation & Growth Are Related to Disc Temp & Matl Characteristics.Util Should Continue Disc Insp to Minimize Crack Formation. Safety Evaluation Re Westinghouse Insp Criteria Encl)
- ML20198S515 + (Informs That Lr Lundborg,License OP-30267-3,no Longer Requires Use of NRC License.Termination of Subject License, Requested)
- ML20211B162 + (Informs That Lr Mccoy,License SOP-30668-2,no Longer Requires Operator License)
- ML20211F512 + (Informs That Lt Gesinsky Has Become Seriously Ill & Will Not Be Able to Testify,As Witness,On Behalf of Util.Ee Demario Will Replace Lt Gesinsky as Witness.Prof Qualifications Encl)
- ML20148D095 + (Informs That Ltr & Declaration Has Been Filed in Support of Jr Bynum.Nrc Considering Enforcement Action Against Individual)
- ML20198Q469 + (Informs That Ltr & Encls Note Transfer of Cegelec Automation (Delphi),Of Pamona,Ca;Detector Devices Containing 50 Mci of Tritium H3 from Interim Location to Another Generally Licensed Air Products Facility)