U SEP 161975-Memo to File Thru:

D. L. Caphton, Senior Reactor Inspector j

NRC I, Reactor Operations Branch OYSTER CREEK (DN 50-219)

SPENT FUEL SHIPMENTS The'following spent fuel shipments have left the Oyster Creek site as of September 14, 1975.

Shipment Number Fuel Bundle Nusser Time of Departure 33 JC555, JC484 4:45 p.m. 7/30/75 34 JC377,.10492 4:00 p.m. 8/1/75 3 ',

JC231, 1C556 3:45 p.m. 8/2/75 l

36 JC284, JC551 10:00 a.m. 8/5/75 37 JC125, JC489 4:00 p.m. 8/7/75 38 JC462, JC476 4:00 p.m. 8/8/75 39 JC451, JC537 3:15 p.m. 8/9/75 40 1C421, 'JC524 2:00 p.m. 8/11/75 l

41 JC512, JC453 10:30 a.m. 8/13/75 42 JC529, JC435 6:30 p.m. 8/13/75 43 JC371,.iC123 4:45 p.m. 8/15/75 44 JC84, JC201 3:00 p.m. 8/17/73 l

45 JC18, JC491 3:45 p.m. 8/18/75 l

46 JC200, JC533 3:15 p.m. 8/19/75 l

47 JC454,.;C464 4:00 p.m. 8/20/75 4b J.C117 JC240 5:30 p.m. 8/21/75 l

49 JC342, JC539 3:00 p.m. 8/22/75 j

50

-JC244, JC481 2:40 p.m. 8/23/75 51 JC545, JC198 4:00 p.m. 8/24/75 52 JC461. JC553 4:10 p.m. 8/25/75 53 JC547, JC235 3:20 p.m. 8/26/75 54 JC520 JC543 5:00 p.m. 8/27/75 55 JC496, JC487 4:20 p.m. 8/28/75 56 JC558, JC64 4:00 p.m.'8/29/75 57 JC95, JC559 5:15 p.m. 9/2/75 58 JC55,, JC219 5:00 p.m. 9/3/75 59 JC502, JC130 4:30 p'.m. 9/4/75 60 JC470, JC351 4:30 p.m. 9/5/75 61 JC83, JC439 6:00 p.m. 9/7/75 62 JC478, JC256 3:00 p.m. 9/8/75 63 JC536, JC519 4:00 p.m. 9/11/75 N

b 9604240025 960213 PDR FOIA DEKOK95-250 PDR

s 9

l 2

Shipment Number fuel Bundle Number Time of Departure l

64 JC298, JC291 '

2:35 p.m. 9/12/75 l

65 JC551, JC432 111000manue9/14/75 i

66 JC30, JC457 10:45 a.m. 9/14/75 4

Prior shipments (32) bring the total movement to date to 132 bund &as.

The licensee must ship an additional 80 bundles to achieve full core j

off loading capability.

l Projects will continue to maintain a periodic status and daily report update until shipping is concluded.

Edward G. Greenma-1 Reactor Inspector cc: