ML20205M104

From kanterella
Jump to navigation Jump to search
Informs That Listed post-accident Monitoring (Reg Guide 1.97) Instruments Declared Inoperable at Time of Cycle 2 Startup Following First Refueling Outage
ML20205M104
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/07/1986
From: Schnell D
UNION ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.097, RTR-REGGD-1.097 ULNRC-1289, NUDOCS 8604150078
Download: ML20205M104 (4)


Text

,

JEI

- r UNION ELECTRIC COMPANY 1901 Gratiot Street St. Louis April 7, 1986 Donald F.Schnell Vice President Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

ULNRC-1289 DOCKET NUMBER 50-483 l CALLAWAY PLANT LICENSE CONDITION C(7) (c) i License Condition C(7) (c) of Callaway Facility Operating License, NPF-30 requires certain Regulatory Guide 1.97, Post Accident Monitoring (PAM), instruments to be operable prior to restart following the first refueling outage. The purpose of  :

thic letter is to inform you that the following instruments are ready to be declared operable at the time of startup for Callaway l l

Cycle 2: -

1. Source range instrumentation qualified to post-accident conditions, SE-NE-60 SE-NE-61
2. Reactor vessel water level instrumentation, BB-LT-1311 BB-LT-1312 BB LT-1321 l BB-LT-1322 l I
3. Subcooling monitors, RP081A '

RP081B l

4. Radiation monitors for releases from steam generator atmospheric relief valves, AB-RE-111 AB-RE-112 AB-RE-113 AB-RE-114
5. Auxiliary feedwater pump turbine exhaust monitorf FC-RE-385 860415o078 DR 860407 ADoCK 05o 3 08 3 Moiling Address RO Box 149, St. Louis MO 63166 O

~

L .

These PAM instruments have been. incorporated into the appropriate procedures and the operating staff has been trained as to their proper use.

The activities associated with close-out of this license condition are available.for on-site review. If there are any questions, please contact us.

Very truly yours, d

Donald F. Schnell DS/bjk

i

  • i l

STATE OF MISSOURI )

) SS CITY OF ST. LOUIS )

Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Vice President - Nuclear for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on the behalf of said company with full power and authority to-do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

n By Donald F. Schnell Vice President - Nuclear SUBSCRIBED and sworn to before me this 7 day of a ,/ , 1986

[ UAM W 3 [Jg sr a ,( vs.u. .-

o,- 4* '-t =

3 m w

cc: Gerald Charnoff, Esq.

Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W.

Washington, D.C. 20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 C. W. Hehl l Division of Projects and '

Resident Programs, Chief, Section lA I U.S. Nuclear negulatory Commission Region III 1 799 Roosevelt Road I Glen Ellyn, Illinois 40137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission l RR#1 '

Steedman, Missouri 65077 Paul O'Connor Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 i Jefferson City, MO 65102 l

l 1

l 1

e