Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18079A673 + (Impingement Monitoring Program Rept 27,June,1979)
- ML18079B040 + (Impingement Monitoring Program Rept 29 for Aug 1979)
- ML19261E538 + (Impingement Monitoring Program Rept Number 28,Jul 1979)
- ML20126G894 + (Impingement Monitoring Rept for Feb 1981)
- ML19207B470 + (Impingement Monitoring Rept for Jul 1979)
- ML20039E923 + (Impingement Monitoring Rept for Nov 1981)
- ML20066B157 + (Impingement Monitoring Results at Intake for Sept 1982)
- ML20031B435 + (Impingement Monitoring Results for Aug 1981)
- ML20030B871 + (Impingement Monitoring at Intake for Jul 1981)
- ML073240730 + (Impingement and Entrainment at the River Water Intakes of the Savannah River Plant)
- ML20058E486 + (Impingement of Organisms at Pilgrim Nuclear Power Station, Jan-June 1990)
- ST-HL-AE-1719, Impingement/Entrainment Monitoring Program Progress Rept for First Quarter 1986,per Fes.No Data Collected Since Pumping Occurred on 860106 + (Impingement/Entrainment Monitoring Program Progress Rept for First Quarter 1986,per Fes.No Data Collected Since Pumping Occurred on 860106)
- ENS 42977 + (Implantation Seed Found in Medical Waste Bag)
- TSTF-052 + (Implement 10 CFR 50, Appendix J, Option B)
- TSTF-52 + (Implement 10 CFR 50, Appendix J, Option B)
- RIS 2007-06, Implementation + (Implementation)
- ML20054C556 + (Implementation & Application of Radiological Control Program Sys at Bnl)
- L-2009-200, Implementation Date Change for License Amendments 234 and 229 + (Implementation Date Change for License Amendments 234 and 229)
- ML031560625 + (Implementation Date for Amendment 145)
- Information Notice 1992-38, Implementation Date for the Revision to the EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents + (Implementation Date for the Revision to the EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents)
- ML17354A052 + (Implementation Extension for the Crystal River Unit 3 Amendment No. 253 Which Approved the Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, and ISFSI-Only Emergency Action Level Bases Manual)
- ML20244C266 + (Implementation Guidance for New & Corrective Equipment Environ Qualification, Technical Evaluation Rept)
- ML16223A231 + (Implementation Guidance for the Maintenance Rule)
- IR 05000410/1985028 + (Implementation Insp Rept 50-410/85-28 at S&W Ofc in Cherry Hill,Nj on 850812-16.Major Areas Inspected:Review of Engineering Assurance Technical Audit 50 on 850802,including Resolution of Action Items & Corrective Actions)
- ML20132F708 + (Implementation Insp Rept 50-498/85-09 at S&W,Boston,Ma on 850423-26.Major Areas Inspected:Engineering Assurance Program.Program Capable of Evaluating Adequacy of Design & Effectiveness of Design Process for Sys Being Reviewed)
- ML23024A162 + (Implementation Memo to Revise RI-SRI Site Staffing Metric)
- ML062260443 + (Implementation Period for Proposed Technical Specification Change for Recirculation Spray System)
- ML13317A174 + (Implementation Plan for Accelerating Structural Upgrade to Withstand 0.67 G Ground Motion)
- ML040680720 + (Implementation Plan for Compensatory Measures at the Aerotest Radiography and Research Reactor Facility)
- ML040640603 + (Implementation Plan for Compensatory Measures at NIST Research Reactor)
- ML20198L564 + (Implementation Plan for Environ Assessment in Lakeview, Oregon)
- ML20033E030 + (Implementation Plan for Interim Low Level Waste Mgt Appalachian States Compact)
- ML20011D431 + (Implementation Plan for Interim Low Level Waste Mgt Appalachian States Compact)
- ML20033E028 + (Implementation Plan for Interim Low Level Waste Mgt)
- ML031350099 + (Implementation Plan for the Final Policy Statement on Decommissioning Criteria for the West Valley Demonstration Project at the West Valley Site)
- ML24225A146 + (Implementation Plan for the Future of National Materials Program Working Group and Working Group to Assess the Ability to Monitor National Material Program Performance)
- ML17334A919 + (Implementation Plan of Reg Guide 1.97,Rev 3 for Donald C Cook Nuclear Plant Units 1 & 2, Status Rept)
- ML17321A467 + (Implementation Plan of Reg Guide 1.97,Rev 3 for DC Cook Nuclear Plant Units 1 & 2, Status Rept)
- ML19072A214 + (Implementation Plan to Identify Depleted Uranium on Military Ranges and Determine Its Licensing Status - Redacted)
- ML20183A242 + (Implementation Plans for Independent Spent Fuel Storage Installation and Smarter Fuel Cycle Inspection Program Enhancements)
- LR-N16-0016, Implementation Schedule Change for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems + (Implementation Schedule Change for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems)
- LR-N16-0014, Implementation Schedule Change for License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) + (Implementation Schedule Change for License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling))
- BSEP 02-0104, Implementation Schedule for Alternative Radiological Source Term License Amendment + (Implementation Schedule for Alternative Radiological Source Term License Amendment)
- BSEP 05-0015, Implementation Schedule for Hydrogen and Oxygen Analyzer Requirements Amendment + (Implementation Schedule for Hydrogen and Oxygen Analyzer Requirements Amendment)
- L-2003-273, Implementation Status - April 29, 2003 Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (EA-03-038) + (Implementation Status - April 29, 2003 Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (EA-03-038))
- ML032110435 + (Implementation Status for the Compensatory Measures Related to the Access Authorization Order Dated January 7, 2003)
- ML032110428 + (Implementation Status for the Compensatory Measures Related to the Access Authorization Order Dated January 7, 2003)
- B18936, Implementation Status for the Compensatory Measures Related to the Access Authorization Order Dated January 7, 2003 + (Implementation Status for the Compensatory Measures Related to the Access Authorization Order Dated January 7, 2003)
- NL-04-1833, Implementation Status of ISFSI Interim Compensatory Measures + (Implementation Status of ISFSI Interim Compensatory Measures)
- ML042820058 + (Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures)
- ML042590246 + (Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures)