Implementation Period for Proposed Technical Specification Change for Recirculation Spray System
ML062260443
Person / Time
Site: Millstone 
Issue date: 08/14/2006
From: Gerald Bichof
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
06-670
Download: ML062260443 (2)


Text

Dominion Nuclear Connecticut, Inc.

i000 Dommion Boulevard, Glen Allen, Virgin13 23060 Wch Address: ww.dom.com August 14, 2006 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Serial No.06-670 NSS&UDF RO Docket No.

50-423 License No.

NPF-49 DOMINION NUCLEAR CONNECTICUT. INC.

MILLSTONE POWER STATION UNIT 3 IMPLEMENTATION PERIOD FOR PROPOSED TECHNICAL SPECIFICATION CHANGE FOR RECIRCULATION SPRAY SYSTEM In a letter dated September 13, 2005, as supplemented by letter dated June 13, 2006, Dominion Nuclear Connecticut, Inc. (DNC) requested an amendment to Operating License NPF-49 for Millstone Power Station Unit 3 (MPS3). The proposed amendment revises surveillance requirements for the recirculation spray system (RSS) to verify proper initiation of the RSS through actuation of the refueling water storage tank low-low level signal instead of actuation by a timer. The design change to install the necessary circuitry to support the license amendment request is currently planned for implementation during the upcoming spring 2007 refueling outage (3R11). For this reason, the implementation of the proposed license amendment is tied to startup from 3R11. Therefore DNC respectfully requests the license amendment for the RSS be made effective as of the date of issuance with completion of implementation no later than startup from 3R11.

If you should have any questions regarding this submittal, please contact Mr. Paul R. Willoug hby at (804) 273-3572.

Very truly yours, G. T. Bischof w

Vice President - Nuclear Engineering

Serial No.06-670 Docket No. 50-423 Implementation Period for Recirculation Spray System Page 2 Commitments made in this letter: None CC:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1 41 5 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 1 1 555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 061 06-51 27