ML031560625
| ML031560625 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 05/29/2003 |
| From: | Salamon G Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LRN-03-0231 | |
| Download: ML031560625 (2) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 2 9 2003 LRN-03-0231 0 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 IMPLEMENTATION DATE FOR AMENDMENT 145 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FACILITY OPERATING LICENSE NO. NPF-57 Reference 1: Amendment 145 to Hope Creek Facility Operating License NPF-57 (TAC No. MB5852)
Reference 2: Amendment Nos. 256 and 237 to Salem Units 1 and 2 Facility Operating Licenses DPR-70 and DPR-75, respectively (TAC Nos.
MB5825 and MB5826)
The NRC issued Amendment No. 145 to the Hope Creek Operating License on March 31, 2003 (Reference 1) and similar amendments for Salem Units 1 and 2 on April 16, 2003 (Reference 2). These amendments revise Technical Specification (TS) 4.0.3 for missed surveillances in accordance with the Consolidated Line Item Improvement Program, modify TS 4.0.1 to be consistent with Standard TS, and incorporate a TS Bases Control Program in Section 6. The referenced letters provide a 60 day window for implementation of the amendments.
PSEG requests a common implementation date of June 16, 2003 for both Hope Creek and Salem Amendments, based on the later approval at Salem.
Administrative procedures necessary to implement the missed surveillance TS are largely shared among the stations.
Should you have any questions, please contact Carl Berger at (856) 339-1432.
Sincerely, G. Salamon Manager Nuclear Safety and Licensing CLB 95-2168 REV. 7/99
f N/
Document Control Desk MAY 2 9 2003 LR-N03-0231 C
Mr. H. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Robert Fretz, Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 08B2 Washington, DC 20555-0001 Mr. George Wunder, Project Manager - Hope Creek U. S. Nuclear Regulatory Commission Mail Stop 08B2 Washington, DC 20555-0001 USNRC Resident Inspector Office (X24)
Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P. O. Box 415 Trenton, NJ 08625