Implementation Extension for the Crystal River Unit 3 Amendment No. 253 Which Approved the Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, and ISFSI-Only Emergency Action Level Bases Manual
ML17354A052
Person / Time
Site: Crystal River 
(DPR-072)
Issue date: 01/02/2018
From: Bruce Watson
Reactor Decommissioning Branch
To: Hobbs T
Duke Energy Florida
JBHickman NMSS/DUWP/RDB 415-3017 T5E05
References
Download: ML17354A052 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 2, 2018 Mr. Terry D. Hobbs General Manager, Decommissioning Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT -AMENDMENT NO. 253 WHICH APPROVED THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)-ONLY EMERGENCY PLAN, AND ISFSI-ONLY EMERGENCY ACTION LEVEL BASES MANUAL

Dear Mr. Hobbs:

On March 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No.

253 to Facility License No. DPR-72 for the Duke Energy Florida, Inc. (DEF), Crystal River Unit 3 Nuclear Generating Plant (CR-3). That amendment revised the CR-3 license to approve the Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, and ISFSI-Only Emergency Action Level Bases Manual, after all the spent fuel has been moved from the spent fuel pool to the ISFSI.

By letter dated December 14, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17348A309), DEF requested that the implementation period for that amendment be revised from 60 days after written notification that all spent nuclear fuel has been transferred from the spent fuel pool to the ISFSI, to 120 days after written notification that all spent nuclear fuel has been transferred from the spent fuel pool to the ISFSI. The change was requested to coordinate the implementation of this amendment with the implementation of the amendment approving the revised security plan after all spent nuclear fuel has been transferred from the spent fuel pool to the ISFSI.

We have reviewed your request and concur that coordinated implementation of the emergency plan and security plan, which are being revised to reflect the change in plant status after the spent fuel has been transfer to the ISFSI, is important to safe implementation. Therefore, we hereby revise the required implementation of Amendment No. 253, for Crystal River Unit 3 to 120 days after written notification that all spent nuclear fuel has been transferred from the spent fuel pool to the ISFSI.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions, please contact John Hickman at 301-415-3017 or via e-mail at John.Hickman@nrc.gov.

Sincerely,

/RA/

Bruce A. Watson, Branch Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-302 cc: Service List

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT -AMENDMENT NO. 253 WHICH APPROVED THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)-ONLY EMERGENCY PLAN, AND ISFSI-ONLY EMERGENCY ACTION LEVEL BASES MANUAL, DATED JANUARY 2, 2018 DISTRIBUTION:

DCD r/f OGC ACRS/ACNW RPowell, RI ADAMS No.: ML17354A052 OFFICE NMSS NMSS NMSS NAME JHickman CHolston BWatson DATE 12/20/2017 12/21/2017 01/02/2018 OFFICIAL RECORD COPY