A Progress Energy Company MAY 10 20OZO SERIAL: BSEP 02-0104 TSC-2001-04 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 IMPLEMENTATION SCHEDULE FOR ALTERNATIVE RADIOLOGICAL SOURCE TERM LICENSE AMENDMENT (NRC TAC NOS. MB2570 AND MB2571)
Ladies and Gentlemen:
On August 1, 2001 (i.e., Serial: BSEP 01-0063), Carolina Power & Light (CP&L)
Company requested revisions to the Technical Specifications for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2, to adopt an Alternative Source Term (AST). The AST analyses were performed based on a maximum licensed power level of 2923 megawatts thermal, in order to support CP&L's Extended Power Uprate (EPU) license amendment application dated August 9, 2001 (i.e., Serial: BSEP 01-0086). The EPU license amendment application requested an implementation period of 120 days following the license amendments becoming effective. Therefore, to support coordinated implementation of the AST license amendments with the EPU license amendments, CP&L is requesting, for both BSEP units, an implementation period of 120 days following the AST license amendments becoming effective. The Unit 1 AST license amendment should become effective immediately upon issuance. The Unit 2 AST amendment effective date should be upon completion of Unit 2 Refueling Outage 15 (i.e., B216R1), currently scheduled for March 2003.
Please refer any questions regarding this submittal to Mr. Leonard R. Beller, Supervisor Licensing/Regulatory Programs, at (910) 457-2073.
Sincerely, Edward T. O'Neil Manager - Regulatory Affairs Brunswick Steam Electric Plant Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461
Document Control Desk BSEP 02-0104 / Page 2 WRM/wrm cc:
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Theodore A. Easlick, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission RO. Box 29510 Raleigh, NC 27626-0510 Mr. Mel Fry Director - Division of Radiation Protection North Carolina Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7221