Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323J345 + (Forwards Seismic Evaluation of Vallecitos Site)
- PY-CEI-NRR-1471, Forwards Seismic Event Evaluation Rept for 920315 Mc=3.5 Earthquake + (Forwards Seismic Event Evaluation Rept for 920315 Mc=3.5 Earthquake)
- B11080, Forwards Seismic Fragilities of Structures & Components at Millstone 3 Nuclear Power Station, Per 840306 Meeting Commitment + (Forwards Seismic Fragilities of Structures & Components at Millstone 3 Nuclear Power Station, Per 840306 Meeting Commitment)
- B10954, Forwards Seismic Hazard & Design Spectra at Millstone Nuclear Power Plant Unit 3 & Proprietary Vols 1 & 2 to Seismological & Geological Studies:Miramichi Area,New Brunswick.... Proprietary Repts Withheld (Ref 10CFR2.790) + (Forwards Seismic Hazard & Design Spectra at Millstone Nuclear Power Plant Unit 3 & Proprietary Vols 1 & 2 to Seismological & Geological Studies:Miramichi Area,New Brunswick.... Proprietary Repts Withheld (Ref 10CFR2.790))
- ML20147D384 + (Forwards Seismic Hazards Assessment, Final Rept Per NRC 830503 Request for Addl Info Re Question 230.6)
- ML20147D389 + (Forwards Seismic Hazards Assessment, Final Rept Per NRC 830503 Request for Addl Info Re Question 230.6)
- ML19322E479 + (Forwards Seismic Input Parameters for Geotechnical Review & Geotechnical Considerations Guidance)
- B11610, Forwards Seismic Interaction Program Summary in Response to Concerns Identified in 850521 Const Appraisal Team Insp Rept 50-423/85-04 & 850621 Technical Audit Preparation Insp Rept 50-423/85-29 + (Forwards Seismic Interaction Program Summary in Response to Concerns Identified in 850521 Const Appraisal Team Insp Rept 50-423/85-04 & 850621 Technical Audit Preparation Insp Rept 50-423/85-29)
- B11756, Forwards Seismic Interaction Review Program... & Application of Data to Seismic Interaction..., in Response to NRC .List of non-Seismic Category I Equipment Installed in Seismic Category I Areas Also Encl + (Forwards Seismic Interaction Review Program... & Application of Data to Seismic Interaction..., in Response to NRC .List of non-Seismic Category I Equipment Installed in Seismic Category I Areas Also Encl)
- ML20133F781 + (Forwards Seismic Interaction Review Program... & Application of Data to Seismic Interaction..., in Response to NRC 850917 Ltr.List of non-Seismic Category I Equipment Installed in Seismic Category I Areas Also Encl)
- ML20044H352 + (Forwards Seismic Margin Earthquake for Trojan Site, Final Rept.Rept Completes Study Established to Define Appropriate Earthquake Ground Motions Used in Evaluating Seismic Margins for Facility)
- ML20049A855 + (Forwards Seismic Margin Review Criteria, Modified Per 810630 Meeting & 810717 Telcon Guidance.Criteria Will Be Incorporated Into Program Supporting OL Review)
- ML20071A270 + (Forwards Seismic Margin Review Repts Vol I Re Methodology & Criteria & Vol VII Re Electrical Control Instrumentation & Mechanical Equipment Margins.Encl Incorporates NRC Feedback from 810630 Meeting & Util .W/O Encl)
- ML20071L420 + (Forwards Seismic Margin Review, Vols I,V & Vi.W/O Encl)
- ML20073C581 + (Forwards Seismic Margin Review,Midland Energy Ctr Project, Vol Ii:Reactor Containment Bldg. Evaluation Shows Considerable Amount of Design Margin)
- ML20085D801 + (Forwards Seismic Margin Review,Vol Iii,Auxiliary Bldg, Describing Method of Analysis & Resulting Seismic Margins. Considerable Amount of Margin Exists in Design)
- ML20076L513 + (Forwards Seismic Margin Review,Vol Iv,Svc Water Pump Structure Margin Evaluation)
- ML19261D543 + (Forwards Seismic Monitoring Network, Quarterly Rept 15 for Dec 1978 - Feb 1979)
- ML18018B906 + (Forwards Seismic Monitoring Program Quarterly Data Rept, Jan-Mar 1985. Reservoirs Filled in Mar 1983,therefore, 760213 Commitment to Submit Quarterly Repts Satisfied)
- ML18018B907 + (Forwards Seismic Monitoring Program Quarterly Data Rept, Jan-Mar 1985. Reservoirs Filled in Mar 1983,therefore, 760213 Commitment to Submit Quarterly Repts Satisfied)
- ML18017A607 + (Forwards Seismic Monitoring Program Rept for Apr-June 1979. Responses to NRC 790713 Questions Re Program Encl)
- ML20137D601 + (Forwards Seismic Monitoring Program at North Anna Site in Central Virginia - 740121-770801, as Required by Sser 2. Ga Bollinger Ltr Re Significance of Microseismicity at Site Also Encl.W/O Rept)
- ML18003A579 + (Forwards Seismic Monitoring Program,First Data Rept, 770930-790331)
- ML18003A580 + (Forwards Seismic Monitoring Program,First Data Rept, 770930-790331)
- ML18017B311 + (Forwards Seismic Monitoring Rept,Oct-Dec 1980)
- ML18017B312 + (Forwards Seismic Monitoring Rept,Oct-Dec 1980.)
- ML19308A355 + (Forwards Seismic Network Annual Rept, Nov 1977-Oct 1978)
- ML19308A356 + (Forwards Seismic Network Annual Rept, Nov 1977-Oct 1978)
- ML20044G165 + (Forwards Seismic Occurrence of 930330, Engineering Evaluation.Rept Includes Analysis of Strong Motion Accelerograph Outputs)
- ML13324A566 + (Forwards Seismic Program for Long-Term Svc & Responses to Action Items Resulting from 850212 & 27 Meetings W/Nrc. Repts Discuss long-term Seismic Reevaluation Criteria & Methodology)
- RBG-21-300, Forwards Seismic Qualification Program Status Repts as Suppl to Util ,Attachment 2 & in Response to Equipment Qualification Branch Comments + (Forwards Seismic Qualification Program Status Repts as Suppl to Util ,Attachment 2 & in Response to Equipment Qualification Branch Comments)
- ML20063E221 + (Forwards Seismic Qualification Rept 3394-1..., Anticipatory Reactor Trip Sys Seismic Qualification Test Plan, Seismic Simulation Test Program... & Environ Qualification Rept..., in Response to NRC 820514 Request)
- ML17255A387 + (Forwards Seismic Qualification Rept for Refueling Water Storage Tank at Re Ginna Plant, Seismic Qualification Rept for Vertical Holdup Tanks at Re Ginna Plant & Seismic Qualification Rept for Waste Holdup Tank..)
- ML17255A388 + (Forwards Seismic Qualification Rept for Refueling Water Storage Tank at Re Ginna Plant, Seismic Qualification Rept for Vertical Holdup Tanks at Re Ginna Plant & Seismic Qualification Rept for Waste Holdup Tank....)
- ML20077G839 + (Forwards Seismic Qualification Repts on Containment Purge & Vent Valves,Per Util .Repts of Static Deflection Tests of Valves W/Actuators & Dynamic Qualification of Valve Actuators Will Be Submitted by 830901)
- PLA-1139, Forwards Seismic Qualification Review Team Forms for NSSS Equipment.Remaining Review Team Forms or Justification of Interim Operations Will Be Supplied During 820628 Meeting + (Forwards Seismic Qualification Review Team Forms for NSSS Equipment.Remaining Review Team Forms or Justification of Interim Operations Will Be Supplied During 820628 Meeting)
- ML20140B375 + (Forwards Seismic Qualification Review Team Audit Response to Open Items.Ground Response Spectra Provided 5% & 7% Structural Damping for 5% & 7% Equipment Damping for north-south & east-west Directions)
- ML20003D997 + (Forwards Seismic Qualification Review Team Request for Addl Info Re Equipment Qualification for Seismic & Hydrodynamic Loads.Licensee Response Is Required Prior to 810504-08 Site Visit)
- ML20040A357 + (Forwards Seismic Qualification Review Team Rept on 810602-05 Site Conference W/Util,Eg&G,Sargent & Lundy,Bechtel & Nutech.Attendee & Equipment Audit Lists Encl)
- W3P84-0131, Forwards Seismic Qualification Review Team Comments from Audit Rept Followed by Util Response Re Seismic & Environ Qualification.Specific Example of How Qualification Will Be Maintained Encl + (Forwards Seismic Qualification Review Team Comments from Audit Rept Followed by Util Response Re Seismic & Environ Qualification.Specific Example of How Qualification Will Be Maintained Encl)
- ML17276B705 + (Forwards Seismic Qualification Review Team Audit Forms for Equipment.Copies Sent to Eg&G,Id)
- ML20010E103 + (Forwards Seismic Qualification Review Team Info Consisting of Filter Plenums,Radiation Monitor Panel & Seismic Repts for Radiation Monitor Panel,Per 810807 Commitment)
- ML20010E662 + (Forwards Seismic Qualification Review Team Response to Open Items 6,7,8,19,29, & 39 Per 810813 Ltr)
- AECM-81-244, Forwards Seismic Qualification Review Team Summary Forms,In Response to NRC 810707 Telecopy Request to Bechtel + (Forwards Seismic Qualification Review Team Summary Forms,In Response to NRC 810707 Telecopy Request to Bechtel)
- ML20063G726 + (Forwards Seismic Qualification Review Team Info Re Pressurizer Safety Valve Position Indication Sys Per TMI Item II.D.3.Response Fulfills License Condition 2.C(23)c Permitting Unit to Exceed 5% Full Power)
- ML20003E098 + (Forwards Seismic Qualification Review Team Request for Addl Info Re Equipment Qualification for Seismic & Hydrodynamic Loads.Info Needed Prior to 810504-08 Site Visit)
- ML20010E661 + (Forwards Seismic Qualification Review Team Response to Open Items 6,7,8,19,29, & 39 Per)
- ML20082G650 + (Forwards Seismic Qualification Review Team Summaries Re Differences W/Respect to Seismic & Hydrodynamic Effects. Summaries Indicate Listed Equipment Seismically Qualified for Svc)
- ML20031D978 + (Forwards Seismic Qualification Review Team Sheets for SER Confirmatory Issue 1.7.21 Re Core Subcooling Monitor & Acoustic Leak Detection Equipment Cabinet.Completion Status of Remaining Items Listed)
- ML20053B576 + (Forwards Seismic Qualification Review Team Equipment List & Revision 3 to Amplified Response Spectra Seismic Category I Structures,Vols 1-3)
- L-83-130, Forwards Seismic Qualification Test Repts N-46474P038368 Rev 1, Core Protection Calculators 1 & 2, STR6764 Rev a, Ex-Core Safety Channel Neutron Flux Signal Processing Electronics, & TS6575.2,Rev a, Bistable/Auxiliary Trip. + (Forwards Seismic Qualification Test Repts N-46474P038368 Rev 1, Core Protection Calculators 1 & 2, STR6764 Rev a, Ex-Core Safety Channel Neutron Flux Signal Processing Electronics, & TS6575.2,Rev a, Bistable/Auxiliary Trip.)