ML20044G165
| ML20044G165 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/21/1993 |
| From: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20044G166 | List: |
| References | |
| NSD930667, NUDOCS 9306020108 | |
| Download: ML20044G165 (1) | |
Text
a
_S..h J
P.O. BOX 499. COLUMBUS, NEBRASKA 6B602-0499 GENERAL OFFICE
- ~ 4it;/
- fg 3'-J %{3 Nebraska Publ.ic Power D tr. t TELEPHONE (402) %4-8%1 is ic rAx <4023 ms.sssi so, n_ __
NSD930667 May 21, 1993 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 Gentlemen:
Subje Report on Seismic Event Cooper Nuclear Station NP,C Docket No. 50-298, DPR-46 A report has been prepared by the Nebraska Public Power District concerning the seismic occurrence of March 30, 1993, that was experienced at the Cooper Nuclear Station (CNS). This report was prepared per Subsection 5.2.5 of Section II of the CNS Updated safety Analysis Report and includes an analysis of the strong motion accelerograph outputs. This report is being submitted per the request of our NRC Proj ect Manager, Please call if you have questions concerning the attached report.
Sin frel,
e ! c-
.(R. Horn Nac1 ar Power Croup Manager
/ dis Attachment cc:
NRC Regional Office Region IV Arlington, TX NRC Resident Inspector f
Cooper Nuclear Station A)\\t
.Onnon o
930602010B 930521 I
PDR ADOCK 05000298 s
PDR NfMYNN b 7
Nk -
[
k 3
e=
m
=
=
=
mm m==