ML20049A855

From kanterella
Jump to navigation Jump to search
Forwards Seismic Margin Review Criteria, Modified Per 810630 Meeting & 810717 Telcon Guidance.Criteria Will Be Incorporated Into Program Supporting OL Review
ML20049A855
Person / Time
Site: Midland
Issue date: 09/25/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20049A857 List:
References
13781, NUDOCS 8110020345
Download: ML20049A855 (2)


Text

___________

O Consumers Power James W Cook Vice President - Projects, hgineenng and Construction General off 6ces: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788-0453 September 25, 1981 4

Harold R Denton, Director 00T1 1981 g

Office of Nuclear Reactor Regulation Division of Licensing mang US Nuclear Regulatory Commission N

Washington, DC 20555

'tr MIDLAND PROJECT y

SEISMIC MARGIN REVIEW CRITERIA FILE 0485.16, 0505.18 SERIAL 13781 On June 30, 1981 we met with the NRC staff to discuss Consumers Power's program for conducting a seismic margin review to evaluate the capability of structures, equipment and components to withstand the additional loads from the newly derived site specific response spectra. During this meeting, there were a number of specific and general comments raised by a variety of staff members. At the conclusion of the meeting it was agreed that these questions would best be addressed later by a telephone conversation between myself and l

Mr J P Knight.

In the subsequent telephone conference on July 17, 1981 with Mr Knight, we discussed several modifications to the criteria for the seismic margin review program. We also decided that it would not be fruitful for the staff to formally review and approve our criteria until a generic staff position is issued.

In order for Consumers Power to be able to provide the staff with enough data from the seismic margin analysis activities to support the staff's OL review, we are proceeding to initiate the seismic margin analysis program. This program will utilize the attached " Seismic Margin Review Criteria" document which is transmitted for your idorniation. The enclosed document has been modified based on the feedback from our June 30, 1981 meeting and from the July 17, 1981 telephone conversation. The major modifications which reflect staff guidance are:

o For evaluation in the seismic margin analysis we will select structural members and equipment, not only by the systematic screening process originally described but also based on enginc ' ring judgment as to what is "a critical section," etc.

o As part eT the analysis, two separate margins will be computed: A margin against code ultimate capacity; and in cases where that margin may be exceeded, a margin against failure. All margins calculated will be reported.

T oc0981-04326100 gd!

f(J 8110020345 810925 PDR ADOCK 05000329

/

(

A PDR 6

-a, 3

2 1

1 i

f Although we are not requesting formal staff review of this document for the

. reasons stated above, we would appreciate the staff in:.sreing us if there is j

any major concern identified regarding the program that we have outlined.