Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-96-4623, Forwards Revised Pages 1-3 & 1-4 to Rev 1 of AP600 SPES-2 Test Analysis Rept + (Forwards Revised Pages 1-3 & 1-4 to Rev 1 of AP600 SPES-2 Test Analysis Rept)
- ML20054C842 + (Forwards Revised Pages 1-3,2-1,2-3,2-A5 & 6-1 to 820224 Consolidated Application for RA-series Shipping Container, Submitted on 820301)
- ML17312A609 + (Forwards Revised Pages 1-5,2-5,2-6 & UFSAR Page 15.6-73 Associated W/Util 950502 Submittal Requesting NRC Review & Approval of Change to Large Break LOCA Dose Consequences for Plant)
- ML17252A716 + (Forwards Revised Pages 1-7,1-33,1-37 & 1-40 to CE-1-A,QA Program,Revision 17.W/o Pages 1-7,1-37 & 1-40)
- ML20214X372 + (Forwards Revised Pages 1.1-1,2.1-1,2.2-1,8.2-9 of Part I & 2.1-2 of Part Ii,Addressing Comments in WT Crow to Wf Kirk,For Incorporation in License SNM-368.Page 8.2-9 Revised to Specify 12-inch Edge to Edge Fuel Separation)
- ML20210U277 + (Forwards Revised Pages 1/3 & 2/3 to SER Open Item 15 Re Arbitrary Intermediate Pipe Breaks.Info to Be Used as Interim Design Criteria Until NRC Criteria Issued.Util Will Inform NRC of Necessary Design Criteria Revs)
- ML20066K064 + (Forwards Revised Pages 10,11 & 11a to Response to NRC Question 2.3-4-b Re Control of Heavy Loads,Including Results of Reactor Pressure Vessel Head Drop Analysis.Info Should Be Included in 9-month Response)
- ML20154M302 + (Forwards Revised Pages 10-1 & 10-2 of Licensee NRC Approved Radiological Contingency Plan.Pages Were Revised to Require Radiation Safety Training for Triga Reactor Personnel Annually,Per NRC)
- ML20154M319 + (Forwards Revised Pages 10-1 & 10-2 to Licensee NRC Approved Radiological Contingency Plan.Pages Were Revised to Require Radiation Safety Training for Triga Reactor Personnel Annually,Per NRC)
- ML20198D807 + (Forwards Revised Pages 10.1.1 & 10.1a of Rev 0 to Part II of License SNM-368 Re Process Description & Revised Diagram of Licensee Bldgs)
- ML18058A999 + (Forwards Revised Pages 11 & 12 to SALP Rept 50-255/92-01 Dtd 920701.Revs Reflect Retraction of NOV 50-255/92-04-01)
- ML20217N461 + (Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee)
- ML20127D302 + (Forwards Revised Pages 11-13 to Rev 3,to Security Force Training & Qualification Plan,Indian Point Units 1 & 2)
- ML18044A270 + (Forwards Revised Pages 11-4 & 11-6 to FSAR)
- ML20202G577 + (Forwards Revised Pages 12 & 13 of 860311 Response to Draft SER Open Item 4 Re Verification of FSAR Commitments on Compactions of Category 1 Backfill.Update Includes Data for 841201-851231,per Confirmatory Item 6)
- 3F1183-08, Forwards Revised Pages 12,28 & 42 to Detailed Control Room Design Review Program Plan,Per 831031 Submittal Re NUREG-0737,Item I.D.1, Control Room Design Reviews + (Forwards Revised Pages 12,28 & 42 to Detailed Control Room Design Review Program Plan,Per 831031 Submittal Re NUREG-0737,Item I.D.1, Control Room Design Reviews)
- ML19352A280 + (Forwards Revised Pages 13 & 14 for Physical Security Plan. Encls Withheld (Ref 10CFR2.790))
- ML20054D738 + (Forwards Revised Pages 13-2 & 14-5 of Amend 10 to Physical Security Plan.Revised Pages Withheld (Ref 10CFR73.21))
- ML20086H767 + (Forwards Revised Pages 14 & 15 to Annual Rept for FY90-91 for Univ of Wisconsin Nuclear Reactor Lab, Consisting of Tables Re Liquid Waste to Sanitary Sewer & Effluent from Stack)
- ML20214X009 + (Forwards Revised Pages 14 & 15 to ESG-80-17, Physical Security Plan for Protection of Moderate Strategic Quantities of SNM at Hot Labs.... Revs Withheld (Ref 10CFR2.790(d)))
- ML18047A507 + (Forwards Revised Pages 14 & 15 to Inservice Testing of Plant Valves,Table I, Revision 10,submitted on 820806)
- ML18047A508 + (Forwards Revised Pages 14 & 15 to Inservice Testing of Plant Valves,Table I, Revision 10,submitted on 820806)
- ML20004D048 + (Forwards Revised Pages 14 & 15 to SECY-81-310 Re Final Rule Amending 10CFR2)
- ML20094Q826 + (Forwards Revised Pages 147,157 and 158 of TS Providing Early Implementation of Improved TS Section 3.4.3, Safety Relief Valves & Safety Valves)
- ML19305A789 + (Forwards Revised Pages 158 & 159 for Auxiliary Feedwater Sys Tech Specs,Reflecting Editorial Corrections & Reformatted Surveillance & Testing Requirements Per 791231 Amend Request)
- ML20024G047 + (Forwards Revised Pages 16 & 67 to Amend 14 to License DPR-22)
- ML20203E790 + (Forwards Revised Pages 170 & 171 of Tech Specs from 851202 Application for Amends to Licenses DPR-44 & DPR-58.Monthly Testing Provision Deleted)
- ML20214Q903 + (Forwards Revised Pages 177,186 & 234M to Second Interval Inservice Testing Program.Changes Result of Failure of Ultrasonic Flow Instrumentation Installed on Facility Svc Water Sys)
- ML20112F023 + (Forwards Revised Pages 19,20,25,26 & 27 of Rev 1 to Pulstar Emergency Plan,Per NRC 850305 Questions)
- ML20154F047 + (Forwards Revised Pages 1:1,1:1A & Revised App 1 to Security Plan,Per RR Bellmay 880816 Request.Revs Withheld (Ref 10CFR73.21))
- ML20113D719 + (Forwards Revised Pages 2 & 3 to 841012 Response to Generic Ltr 84-15 Re Reduction in Number of Cold Fast Starts, Correcting Typos Under Date Heading)
- ML20028A892 + (Forwards Revised Pages 2 & 40 to Security Force Training & Qualification Plan)
- ML20072U653 + (Forwards Revised Pages 2 & 6 to Encl a of 910325 Submittal of 10CFR50.59 Annual Rept for 1990)
- ML20010A377 + (Forwards Revised Pages 2,14,15,21 & Renumbered Pages 37,38 & 40-42 of Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790))
- ML19257A596 + (Forwards Revised Pages 2,5 & 6 Per Revision of License Condition 3.6 & Addition of Condition 6.8.Condition 3.6 Amended Re Applicability to Uranyl Nitrate Solution. Condition 6.8 Exempts Same Day Requirement Re DOE/NRC-741)
- ST-HL-AE-1834, Forwards Revised Pages 2,7 & 10 to ,Correcting Response to Sqrt/Pvort Preaudit Questions.Related Correspondence + (Forwards Revised Pages 2,7 & 10 to ,Correcting Response to Sqrt/Pvort Preaudit Questions.Related Correspondence)
- ML20217N783 + (Forwards Revised Pages 2-1,3/4 4-1 & B2-1 to Replace Previously Submitted Pages Contained in Attachment a to 971215 Proposed Change to TS for License NPF-49)
- ML18038A729 + (Forwards Revised Pages 204,204a,207,225a & 230,contained in 921204 Application for Amend to License DPR-63,per 930128 Discussions W/Nrc.Pages Revised to Add Word One to AOTs to Clarify Operator Actions If Two Channels Lost)
- ML17056C258 + (Forwards Revised Pages 204,204a,207,225a & 230,contained in 921204 Application for Amend to License DPR-63,per 930128 Discussions W/Nrc.Pages Revised to Add Word One to AOTs to Clarify Operator Actions If Two Channels Lost)
- ML19344F578 + (Forwards Revised Pages 21,22 & 24 of Memorandum of Law on Need to Prepare EIS Re CP Extension,Attached to . Section 9.103 of NRC Regulations Was Overlooked.Memorandum Submitted w/)
- ML20054G740 + (Forwards Revised Pages 21-23 to Revision 1 of Site-Specific Response Spectra for Clinton Power Station Unit 1)
- ML20237F121 + (Forwards Revised Pages 28 & 41 to Reg Guide 1.97,Rev 5, Position.Rev Incorporates Potential Flow Path to Environ from Auxiliary Feedwater Turbine Exhaust)
- ML20010A753 + (Forwards Revised Pages 2a & 3 to Modified Amended Security Plan.Encls Withheld (Ref 10CFR2.790))
- ML20030E189 + (Forwards Revised Pages 3 & 10 to 810515 Eia on Expansion of Spent Fuel Storage Capacity)
- ML19345A870 + (Forwards Revised Pages 3 & 4 of Physical Security Plan. Pages Withheld (Ref 10CFR2.790))
- ML19262A209 + (Forwards Revised Pages 3 & 4 to Nonroutine 10-Day Rept 75-02)
- ML20065S744 + (Forwards Revised Pages 3 & 4 to Util Re Response to Request for Addl Info on Tech Spec Change Request 77. Revised Pages Clarify Automatic Actuation Signals to Applicable Valves)
- ML19309F208 + (Forwards Revised Pages 3 & 5 & Omitted Page 4 to IE Insp Repts 50-010/80-05,50-237/80-05,50-249/80-05,50-254/80-05 & 50-265/80-08)
- ML20063P199 + (Forwards Revised Pages 3,11,12 & 14 to 820223 Clinton Power Station Preservice Insp Program)
- ML20044E258 + (Forwards Revised Pages 3-1 to 3-9 of Rev 5,dtd 930422,for Matls Control Plan,Superseding Pages 3-1 to 3-9 of Rev 4,)
- NLS8400231, Forwards Revised Pages 3-2 & 3-3 of QA Program,Per 840808 Request + (Forwards Revised Pages 3-2 & 3-3 of QA Program,Per 840808 Request)