Category:CORRESPONDENCE-LETTERS
MONTHYEARML20207B5311999-03-0202 March 1999 Forwards Insp Rept 50-297/99-201 on 990209-12.No Violations Noted.Insp Included Review of Activities Authorized for Facility.Emergency Procedures Were Also Examined ML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20199C8901999-01-0808 January 1999 Ack Receipt of Ltr Dtd 980823,which Transmitted Changes to North Carolina State Univ Pulstar Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Plan Meets Requirements of App E to 10CFR50.NRC Approval Not Required ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20153H2781998-09-28028 September 1998 Forwards RAI Re 980507 Request for License R-120 for North Carolina State Univ Pulstar Research Reactor.Response Requested within 60 Days of Date of Ltr ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 IR 05000297/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/98-201.NRC Will Examine Implementation of Corrective Action During Future Insp ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20217C0351998-03-18018 March 1998 Forwards Insp Rept 50-297/98-201 on 980120-23 & Notice of Violation ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20198R8051997-10-30030 October 1997 Forwards Amend 12 to License R-120 & Safety Evaluation.Amend Updates Figure 5.2-1 of Ts,Pulstar Reactor Site Map & Removes Ref to Region II in TS 3.7, Reporting Requirements ML20217B2001997-09-0909 September 1997 Forwards Insp Rept 50-297/97-201 on 970609-12.No Violations Noted ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20198F7921997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20137V3881997-03-25025 March 1997 Informs of Relocation of Region II Ofc to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New NRC Ofc Encl ML20134K8121997-02-11011 February 1997 Discusses Pulstar Nuclear Reactor Emergency Plan. Implementation of Changes Will Be Subj to Insp to Confirm That Changes Did Not Decrease Overall Effectiveness of Emergency Plan ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20129B9181996-10-10010 October 1996 Notifies of Annual Training Managers Conference in Atlanta, Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20100R3661996-02-19019 February 1996 Forwards Radionuclide Annual Emissions Rept for 1995, Including Output from Computer Code Comply Version 1.5d ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20058P5971993-11-24024 November 1993 Documents Understanding of Activities Associated W/Leakage of Water from Pulstar Reactor Coolant Sys,Based on Discussions W/Ej Mcalpine of NRC on 931123 ML20059M9021993-11-16016 November 1993 Forwards Administration of Requalification Exams,Nrc Rules & Guidance for Exams & Security Agreements for Written Exams to Be Administered at Facility on 940221 ML20058P3221993-10-18018 October 1993 Forwards Partially Withheld Insp Rept 50-297/93-02 on 930928-29.No Violations or Deviations Noted ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes 1999-03-02
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20059D1391990-08-31031 August 1990 Forwards Pulstar Annual Rept to NRC for Jul 1989 - June 1990, & Environ Radiation Surveillance Rept for Jul 1989 - Jul 1990 ML20055H9161990-07-24024 July 1990 Forwards Statement of Financial Qualifications,Per 10CFR50.33(f)(3) for Pulstar Reactor Facility ML20055G6441990-07-20020 July 1990 Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)) ML20055H0831990-07-18018 July 1990 Advises That Amend 9 to SAR Will Be Revised,Per Encl Calculations & Results in Response to Request for Addl Info ML20042E2951990-04-17017 April 1990 Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)) ML19332C4051989-11-17017 November 1989 Forwards Kv Mani Current Resume,Transcripts for Degrees, Outlines for Ne 404 & Ne 508 Courses & Radiation Safety Short Courses Taught,In Response to 891106 Request for Qualifications of Reactor Health Physist.Encls Withheld ML19324C3911989-11-0606 November 1989 Requests That Pj Turinsky Be Removed from Publication Mailing List ML19324B5721989-10-20020 October 1989 Requests Addl Time to Respond to Questions on Pulstar SAR Until 891220 ML19327B1981989-10-13013 October 1989 Advises That Kv Mani Meets Tech Spec 6.1.4,despite Failure of American Board of Health Physics Exam.Mani Meets Acceptable Equivalent Statement Per Listed Qualifications. Facility Adequately Staffed ML19325D8271989-10-13013 October 1989 Requests Correction to Mailing List to Reflect Changes in Administration Identified in Amend 8 to License R-120, Figure 6.1-1 of Pulstar Nuclear Reactor Tech Specs ML20247A1821989-08-30030 August 1989 Responds to NRC Re Violations Noted in Insp. Corrective Actions:Personnel Trained by New Health Physics Procedure 30-2 & Permanent Electrical Svc Installed for Sampler by Univ Physical Plant Organization ML20206L7331988-11-21021 November 1988 Responds to NRC Re Violation Noted in Insp Rept 50-297/88-04.Corrective Actions:Radiation Protection Ofc in Process of Updating All Procedures,Including Procedures Associated W/Radiation Surveillance & Effluent Monitoring ML20206M3841988-11-17017 November 1988 Forwards Attachment A,Section 6.7.5.i, Environ Radiation Surveillance Rept for Period 870728-880308, to 1987-88 Tech Specs Annual Rept Dtd 880830.Attachment a Delayed in Printing & Unavailable W/Main Body of Rept ML20150F3391988-07-12012 July 1988 Responds to NRC Re Violations Noted in Insp Rept 50-297/88-03.Corrective Actions:Reactor Safeguards Advisory Group Meetings Will Be Scheduled by Manager of Nuclear Operations ML20236N5671987-11-0606 November 1987 Responds to NRC Re Violation Noted in Insp Rept 50-297/87-03.Corrective Actions:Procedure HP-40-1 Reviewed & Modified to Include Case of Unloading Samples When Reactor Shutdown ML20210A1611987-04-21021 April 1987 Responds to Re Violations Noted in Insp Rept 50-297/87-01 on 870316-18.Corrective Actions:Personnel Advised Not to Irradiate Matl for Transfer Outside Facility Until Procedure Issued & Shipping Form Revised ML20214L4831986-08-29029 August 1986 Forwards Annual Rept for Jul 1985 - June 1986 & Environ Radiation Surveillance Rept for Aug 1985 - Jul 1986 ML20138C5601985-10-0808 October 1985 Responds to 850927 Order to Show Cause Re Possession of Highly Enriched U Onsite.Facility Not Licensed to Possess Highly Enriched U as of 850909 Amend to License R-120. Amend 9 Encl ML20134L7411985-08-29029 August 1985 Forwards Pulstar Annual Rept to NRC for Period Jul 1984 - June 1985 & Environ Radiation Surveillance Rept for Period Aug 1984 - Jul 1985 ML20112F0231985-03-20020 March 1985 Forwards Revised Pages 19,20,25,26 & 27 of Rev 1 to Pulstar Emergency Plan,Per NRC 850305 Questions ML20108A4761984-10-15015 October 1984 Forwards Corrected 840726 Request for Tech Spec Changes W/ Minor Editorial Corrections ML20092C5241984-06-15015 June 1984 Requests Delay of Implementation of Pulstar Emergency Plan to Allow Completion of Revised Version of Emergency Plan.Submittal of Revised Plan Expected within 60 Days ML20080H9351984-02-0606 February 1984 Informs That J Thomas Resigned as Chancellor of North Carolina State Univ to Accept Presidency of Univ of Alabama on 810630.New Chancellor Is Br Poulton ML20083J4511984-01-0404 January 1984 Notifies That Tl Brackin Has Been Appointed Acting Reactor Health Physicist for Pulstar Facility.Change in Mailing Address Noted ML20080C0801983-08-16016 August 1983 Notifies That Go Miller Permanently Appointed Nuclear Operations Administrator for Pulstar Facility ML20077H1511983-07-0101 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-297/83-01.Corrective Actions:Reactor Health Physicist Assigned Responsibility for Orientation Process ML20085A8031983-05-16016 May 1983 Forwards Rev 3 to Pulstar Reactor Security Plan,Eliminating Control Room Access Keys.Rev Withheld ML20072L6401983-03-29029 March 1983 Forwards Final Survey Re Radiation & Removable Contamination of R-3 Reactor Bay After Biological Shield Demolished.Final Survey Shows Compliance W/Criteria Established by RW Reid to Jl Thomas.Removable Contamination Survey Encl ML20072L6431983-03-16016 March 1983 Forwards Final Survey of R-3 Reactor Bay After Removing R-3 Reactor Biological Shield.Area Above Crane Track Shows No Greater Deviation of Radiological Cleanliness than Area Below Crane.No Swipes on Area Above Crane Necessary ML20064K9881983-01-26026 January 1983 Responds to NRC Re Violations Noted in IE Insp Repts 50-111/82-02 & 50-297/82-01.Justification That Present Procedure Re Stack Monitor Sys Provides Capability of Early Detection of Fuel Clad Failure Submitted ML20064L0061983-01-13013 January 1983 Responds to NRC Re Violation Noted in IE Insp Repts 50-111/82-02 & 50-297/82-02.Justification for Continued Use of Present Stack Gas Monitor Sys Procedures Provided ML20069N8451982-12-0303 December 1982 Advises That Decommissioning Will Take Longer than Anticipated Due to Technical Difficulty of Breaking Up Heavily Reinforced Concrete.Number of Demolition Workers Increased.Work Will Be Complete by 830120 ML20028A8041982-11-0303 November 1982 Forwards Public Version of Emergency Plan ML20069D7521982-09-17017 September 1982 Forwards Section 6.7.5(h),covering Environ Radiation Surveillance Portion of Annual Rept Submitted 820826 ML20063J4451982-08-26026 August 1982 Forwards Pulster Annual Rept to Nrc,Jul 1981-June 1982 ML20054H0841982-05-18018 May 1982 Responds to NRC Re Violations Noted in IE Insp Repts 50-111/82-02 & 50-297/82-01.Corrective actions:820312 Incident Reported & Reactor Safeguards Advisory Group Met 820331.Disputes Item a Re Safeguards Advisory Group ML20040F2771982-02-0404 February 1982 Forwards Section 6.7.5(b) Missing from Annual Rept for Environ Radiation Surveillance Submitted 810827 ML19347E6161981-04-30030 April 1981 Responds to NRC 810306 Ltr Providing Guidance Criteria for Release of Facility to Unrestricted Use.Addendum to Dismantling Plan Encl ML20003E5751981-03-27027 March 1981 Requests Prompt Attention to Univ Submittals Re Dismantling of Reactor.Plans in Progress to Renovate or Demolish Reactor Bldg.Map of Bldg & Surrounding Area Encl ML19350A9401981-03-12012 March 1981 Advises of Two Organizational Changes in Nuclear Engineering Dept.Pj Turinsky Replaces TS Elleman as Dept Head.Rg Cockrell Replaces Jr Bohannon as Director of Nuclear Reactor Program.Requests Appropriate Changes to Mailing Lists ML19341C6421981-02-19019 February 1981 Requests Dismantling of R-3 Reactor & Termination of License R-3 ML20003B1241981-02-0303 February 1981 Forwards Proposed Change to Tech Specs of License R-120 & Univ 791018 Cover Ltr to Ensure Positive Identification Per 810129 Telcon ML20008D8601980-10-10010 October 1980 Forwards Executed Amend 13 to Indemnity Agreement E-7, Changing Description of Location ML19344E6051980-08-27027 August 1980 Forwards Annual Rept,Jul 1979 to Jul 1980. ML19310A4021980-06-0505 June 1980 Forwards Dismantling Plan for R-3,10 Kw Reactor,In Response to NRC Request ML19316B1391980-06-0404 June 1980 Ack Receipt of NRC 800519 Ltr Re Physical Protection Requirements.Physical Security Plan Submitted & Implemented in 1974,achieves Objectives of 10CFR73.67(a),(b),(c),(f) & (G),Therefore New Plan Is Not Necessary ML19211C4541980-01-0404 January 1980 Submits Supporting Info to 791210 Ltr Re Mod to Request for Extension of License R-63.Info Re Area & Stack Monitors, Transfer of SNM from License R-63 & Plan to Dismantle/ Decommission Reactor Encl ML19211D1211980-01-0404 January 1980 Requests Certain Additions to License R-120.Portions Withheld (Ref 10CFR2.790) ML19210F0361979-12-0707 December 1979 Modifies Request for Extension of License R-63 to Change Expiration Date to 830219 & to Discontinue Area & Stack Monitors,Daily Air Samples & Weekly Smear Survey ML19256G3991979-12-0606 December 1979 Responds to IE Bulletin 79-19, Packaging of Low Level Radwaste for Transport & Burial. Sixteen Shipments Made in Jan 1978-June 1979 1990-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes ML20127P8091992-11-30030 November 1992 Forwards Offsite Dose Calculation for Noble Gases, in Response to 900418 Request for Addl Info in Support of 880419 License Renewal Application.Analysis Addresses Dose to Receptor in Unrestricted Areas Proximate to Facility ML20114B9421992-08-27027 August 1992 Responds to NRC Re Violations Noted in Insp Rept 50-297/92-01.Corrective Actions:Emergency Plan & Procedures Currently Under Review & self-contained Breathing Apparatus Placed on Maint Contract W/Approved Vendor ML20099K2651992-08-21021 August 1992 Forwards Pulstar Annual Rept to NRC for Jul 1991-June 1992, North Carolina State Univ Nuclear Reactor Program & Environ Radiation Surveillance Rept for Jul 1991-June 1992 ML20091Q3191992-01-22022 January 1992 Notifies That Pb Perez Assigned Assoc Director,Nuclear Reactor Program Effective 920201 ML20086C6381991-11-13013 November 1991 Submits Info to Correct Data Base & for Consideration When Reviewing Written Exam Administered on 911112 by P Isaac ML20082H8121991-08-21021 August 1991 Forwards Pulstar Annual Rept to NRC for Jul 1990 to June 1991 & Environ Radiation Surveillance Rept for Jul 1990 to Jul 1991 ML20082E3321991-06-27027 June 1991 Submits Listing of Personnel Changes Identified in Figure 6.1-1 of Amend 8 to Tech Specs.G Miller Resigned Position as Associate Director on 910625.Univ Anticipates Hiring Individual to Fill Position in Fourth Quarter 1991 ML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20070N8901991-03-15015 March 1991 Forwards Decommissioning Funding Statement of Intent,Per 10CFR50.75 for Pulstar Reactor Facility ML20066D7781991-01-0707 January 1991 Submits List of Personnel Changes in Positions Identified by Figure 6.1-1 of Tech Specs (Amend 8).Mailing List Should Be Corrected to Reflect Changes ML20059D1391990-08-31031 August 1990 Forwards Pulstar Annual Rept to NRC for Jul 1989 - June 1990, & Environ Radiation Surveillance Rept for Jul 1989 - Jul 1990 ML20055H9161990-07-24024 July 1990 Forwards Statement of Financial Qualifications,Per 10CFR50.33(f)(3) for Pulstar Reactor Facility ML20055G6441990-07-20020 July 1990 Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)) ML20055H0831990-07-18018 July 1990 Advises That Amend 9 to SAR Will Be Revised,Per Encl Calculations & Results in Response to Request for Addl Info ML20042E2951990-04-17017 April 1990 Forwards Rev 4 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)) 1999-02-02
[Table view] |
Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
1-
- North Carolina StateUniversity i
.i Schoolof Engineering Department of Nuclear Engineering suelear neactor Program March 20, 1985 Ikn 799 Zip 2, hum-79x3 (919) 737-232 Director of the Office of Nuclear Reactor Regulation Attention: Cecil 0. Thomas U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-297 Facility License No. R-120
Dear Sir:
In response to your correspondence of March 5, 1985, concerning " Ques-tions on Revision 1 to Radiological Emergency Plan", we have revised the perti-nent portions of our Revision 1 to the PULSTAR Emergency Plan to comply with your request. Specifically, the attached page No.'s 19, 20, 25, 26 and 27 have been revised to address the issues in the referenced correspondence.
To incorporate these revised pages, simply substitute the affected pages one-for-one in Revision 1 PULSTAR Emergency Plan you are presently revew-ing.
Questions concerning the revision should be directed to Mr. Garry D.
Miller at (919) 737-2321.
Sincerely, 4/#lt, .
Bruce R. Poulton GDM:BRP:1pe Chancellor
Enclosures:
Pages 19, 20, 25, 26 and 27 of the PULSTAR Emergency Plan, Revision 1 cc: (all with attachment) Dr. K. V. Mani Dr. P. J. Turinsky Mr. D. W. Morgan, Jr.
Dr. B. W. Wehring Dr. J. A. Mulholland Mr. G. D. Miller Dr. J. J. Wortman Subscribed and sworn to before me this RA. day of V)a u l , 1985,
, D 0 297 Ab /x2P ll g F PDR Notary Public My commission expires (kL f / qf 6 North Carolina State University is North Carolina's original land-grant instiktion 0 and is a constituent institution of The University of North Carolina.
Revision 1 7.5.4 Reactor Buildina Penetration Point: The Reactor. Building-Penetration point shall- be determined by the Emergency Director. on the basis of 'available information. . The ^ early penetration of the control room, ~1f only. for radiation and ' reactor system information, may be de-
-sirable. - Relocation _ to: the - Control Room of n emergency control may be
- accomplished as soon as definitive _ information that the exposure dose rate in the control room' will permit (not'more than 75 mR/hr).
~
k .
- 7.5.5 Return ~of Personnel _. Occupants of the BEL who'have been
- evacuated may be permitted to return to the normal work areas only after the emergency situation has stabilized and the determination that a nuclear hazard no longer exists. -
. Return of ' recovery personnel into- the Reactor Building should be
-dependent upon . radiation levels- that are stable or decreasing and the
. observation that radioactive releases have ceased or are under control.
7.5.6 Aid to Affected Personnel: During an emergency condition, 4 IRP ' personnel may. be required to enter contaminated or hazardous areas to ' rescue -injured or_ trapped personnel. The Emergency Director with the advice of the Health Physicist or Emergency Coordinator will assess the potential radiation hazards and authorize rescue operations accordingly.
Emergency Medical Technicians are available- on call through the
! North Carolina State University.- The Health Physicist _ and his ' staff will be responsible for the decontamination of all individuals involved -
- in an emergency condition other than those transported for medical treatment..
Injured personnel shall be transported by the Wake County Emergency Services ambulance services. Each ambulance is staffed by an Emergency Medical Technician (employed by Wake County Emergency Services) and is capable of
. transporting -contaminated victims. A member of the emergency organization trained in radiological safety will accompany any contaminated person to the hospital. As depicted in Figure 5, the Wake County Emergency Services funtions
- as an off-campus support agency that may be activated as required.during an emergency..
Rex Hospital shall provide facilities to accept and treat contaminated injured victims. The hospital has emergency procedures for this situation.
-7.5.7 Exposure Guidelines Personnel involved in any operation under this plan'.should endeavor to keep their radiation exposure to a minimum.
The_ maximum- dose permitted shall satisfy the requirements of ~ 10CFR20.
The following guideline dose limits apply:
- 1. Personnel Search Team within the Reactor Building -
100 mR/ person.
t- -2. .To investigate cause of evacuation - 250 mR/ person.
- 3. 'To temporarily correct cause of emergency - 500 r$/ person (more only with the approval of the Emergency Director).
19 1e- W' e we e-+mh-- m- T*Ww e a u* e-w"e ,+e-
-y---=ge he.-4e--*-eu--gyw-=qs-*- e*%wo Mw=f s py g ey -9 w cigm e g+w g + v y e ' t-e M g-"+v-eM'se g g g if --*--+fegpw vet'rp gpre y y699 . -. 9 Mgs > py yrw-f g^"
.- - j Revision 1 7.5.8 Emeroency Dose Limitation: The total absorbed whole-body dose to be permitted at this facility during an. emergency are:
- 1. Rescue of personnel (lifesaving) - 25_ Rem
- 2. Tsking corrective actions - 25 Rem
- 3. Performing assessment' action - 3 Rem
- 4. -Providing first-aid - 0.5 Rem
- 5. Providing ambulance service - 0.1 Rem.
- 6. Providing medical treatment 0.1 Rem.
- The Emergency dose for radiation workers of- 25 Rem onco in a lifetime l
-shall not be used unless there has been full-consultation among the Health l
-Physicist, .the Emergency Director, the Emergency Coordinator, and the i affected personnel, and an agreement reached that the circumstances of the J situation merits this emergency exposure.
u-p err - sp, ---
-e r - ?8'W"N'*'" --"fR**'F9r$ Py9 gwwe @wW* *9-N1y 'm WW *-wvv'-*y-'tWh- eeeTN-Ft
e ,
Revision 1 10.0' : MAINTAINING EERGENCY PREPAREDESS: Emergenc'y preparedness at- the-PULSTAR Reactor.will be maintained by:-
~
- a. Preparing the Emergency Organization _ members for proper-emergency response action through training, and drills.
b.--Periodic review and update of the PULSTAR Radiological Emergency Plan and its implementing procedures.
- c. Periodic inventory and calibration of emergency _ equipment
- and instrumentation.
10.1 Organizational Preparedness . Organizational preparedness' is maintained through an integrated. training program that includes general orientation of all'. Nuclear Engineering Department personnel at the-Burlington facility and detailed training of the pertinent individuals
- required to perform specific functions and/or actions during an emergency condition.
10.1.1 PRP Emergency Organization Personnel The PEP Staff Members that function .in the. Emergency Organization.as identified in Figure 5 are
- trained in the'following areas:
- 1. Emergency Organization
- 2. Emergency Classes and Action Levels
- 3. . Emergency Communication Procedures
- 4. Capabilities and services to be provided by support organization and agencies.
- 5. Emergency radiation exposure control and limits
- 6. Record keeping 10.1.2 Radiation Protection ~0 ffice (RPO) Support Personnel:
Personnel. attached to the RPO that would be mobilized during an emergency will be trained in:
- 1. Emergency Organization
- 2. ' Emergency Classes and Action Levels i
- 3. Capabilities and Services to be provided by support organiza-tions and agencies, j - 4. Emergency radiation exposure controls and limits.
10.1.3 NCSU Public Safety: The NCSU Public Safety Training includes:
- 1. Emergency-Organization
- 2. Facility Familiarization 4
- 3. Principles of radiological safety and the effects of radiation.
, . 4. Emergency Communication Procedures, i
25 i
,x. , .-.. . . . - . , , . .yr,,. .,,.r-..-,%.,,m_._,.. ,.m.,,_---..--,r,._,-,,,,,y~,__,-__,-e---,.,.m--o. .we-e. ..,-.-un -em-
Revision 1 10.1.'4 Off-Site Oroanization/ Agencies: . For those organizations providing emergency. services, i.e. Rex Hospital, Wake County Emergency Services and the Raleigh ' Fire Department, training will be . provided in n the following areas:
n
- 1. Emergency Organization
- 2. Facility Familiarization
- 3. Emergency radiation exposure control and limits
- 4. Principles of contamination and decontamination
- 10.2 Drills: On an annual basis, on-site action drills shall- be
. conducted to maintain emergency preparedness. The action drill shall test the: integrated capability- of the emergency plan, or a component thereof, and may include instruction periods to develop and maintain skills in a particular operation.
(
10.2.1 Development of Written -Scenerlo for Action Drills: Each drill shall have documented a written scenerio that includes the following
- j. information.
- 1. The basic objective of the drill.
4
- 2. The date, time period, place and participating organizations.
- 3. The simulated events.
, 4. A time schedule of real and simulated events.
- 5. A narrative summary describing the conduct of the exercise to include such things as simulated casualties, off-site assistance, rescue of personnel, use of protective clothing, deployment of radiological monitoring teams, and public infor-mation activities, to the extent applicable.
- 6. Arrangements for qualified observers.
?
10.2.2 Critique of Action Drillst Within one week of performance of the action drill, a critique will be held under the direction of the Emer-gency Director (Reference Section 3.2.1). The purpose of this critique is
, , to identify any deficiences observed during execution of the drill and to recommend corrective actions where needed. Both observer comments and drill participant comments shall be considered during this critique.-
10.3 Emergency Plannin2 Coordinator: The Health Physicist .is the I North Carolina State University PULSTAR Emergency Planning Coordinator. He i is responsible for coordinating on-site and off-site radiological emergency
! response planning. He requests the relevant individuals to prepare and
- ' maintain the applicable implementing procedures and assures that these
- procedures are properly implemented. He is also responsible for performing the following planning functions
i 26
,r..
Revision 1 L1.~ Interfacing' with Federal,iState, county, and' local-planners.
2.~ Reviewing and updating the- plan -biennially and in response to snew Federaliregulations, modifications identified during exercises and drills, and changes in hardware'and personnel.
- 3. ' . Identifying corrective actions needed following an exercise, assigning responsibility for implementing these actions,-
specifying a schedule for completion 'of these actions, and
~ evaluating the adequacy of the actions taken.
4.' Maintaining and negotiating agreements for State and county response agencies, Federal assistance agencies,.and medical and fire support agencies.
10.4 _. Review and Update of the Plan and Implementing Procedures: The Plan and its implementing procedures.are. intended to provide for continuous emergency preparedness. In addition to the training and drills, regular reviews ; and audits are ' performed. Plan review and updates are described
- in the following section.
10.4.1 Plan Revision and Update: The Emergency Planning Coordinator is responsible for coordinating the updating of the Plan and its implementing
. procedures. . He schedules a biennial review by the Radiation Protection
-Council. Any proposed changes to the Plan due to regulatory revisions, ex-periences of. drills and exercises, or other requirements, are approved by the Radiation Protection Council. Approved changes-to the Plan and Proce-dures L will be distributed to all pertinent organizations and individuals -
i with responsibilities for implernentation.of the plan within 30 days of the revision. . Revision -pages will be marked to show where changes have been
- nade.-
I '10.4.2 Off-Site Agreements: Emergency response agreements with sup-
-porting organizations are revised and updated by the cognizant organization at least every two years and incorporated into the biennial revision.
! 10.5 -Equipment Readiness:
10.5.1 Inventory: An inventory of all emergency equipment and supplies is held on a quarterly basis and after use in an emergency- or drill. A ' listing of the appropriate emergency locker contents are in-cluded in the implementing procedures.
-10.5.2 Maintenance and Calibration: Preventative maintenance such as battery checks are performed monthly or as needed on pertinent equip-
- ment. Calibrations are. performed quarterly on the pertinent survey instru-ments.
10.5.3 Functional Testinc : Survey instruments are functionally test-ed by way of response to_a radioac;ive source on a monthly basis.
27
. . _ _ - _ _ _ _ . _ _ _ _ . _ _ . _ . _ _. . . - _ . _____