ML20063P199

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages 3,11,12 & 14 to 820223 Clinton Power Station Preservice Insp Program
ML20063P199
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/06/1982
From: Wuller G
ILLINOIS POWER CO.
To: Thomas C
Office of Nuclear Reactor Regulation
Shared Package
ML20063P200 List:
References
U-0564, U-564, NUDOCS 8210130181
Download: ML20063P199 (1)


Text

......

~..

s

.g I

U-0564

/LLINDIS POWER COMPANY L30.g2(10 05y.5 500 SOUTH 27TH STREET. DECATUR, ILLINOIS 62525 October 6, 1982 Mr. Cecil O. Thomas, Chief Standardization & Special Projects Branch Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Reference:

IP letter 2/23/82 (U-0422), G. E. Wuller, IP to J.

R. Miller, NRC - transmitted Preservice Inspection Program

Dear Mr. Thomas:

Clinton Power Station Unit 1 Docket No. 50-461 Preservice Inspection Program 1

Transmitted herewith are some changes to our Preservice Inspection (PSI) Program which was furnished via the referenced letter.

The PSI program changes consist of revised material which is provided as replacement pages for the referenced sub-mittal.

Replacement pages #3, 11, 12, 13 and 14 (Revised 10/6/82) are provided to replace the corresponding original pages of the PSI program.

Please let us hear soon if you have any ques-tions on this material.

Sincerely, S

[G.CA [. <9 I

E. Wuller Supervisor - Licensing l

Nuclear Station Engineering f

GEW/sd f

cc:

Mr. J. H. Williams, NRC Clinton Project Manager (w/o Enc.)

Mr. H. H. Livermore, NRC Resident Inspector Mr. M. R. Hum, NRC MTEB Illinois Dept. of Nuclear Safety (w/o Enc.)

() /

+

B210130181 821006 PDR ADOCK 05000461 O

PDR

_