Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0890-03, Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3 + (Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3)
- ML20042F283 + (Forwards Rev 11 to Inservice Testing Program)
- ML20063H194 + (Forwards Rev 11 to Issue 2, Beaver Valley Unit 1 IST Program for Pumps & Valves)
- ML20069P536 + (Forwards Rev 11 to Issue 4 of Physical Security Plan,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR2.790(d) & 10CFR73.21))
- ML20138A643 + (Forwards Rev 11 to LACBWR QA Program Description)
- ML20045F462 + (Forwards Rev 11 to Limerick Generating Station,Units 1 & 2 1993 QA Program Description Changes)
- ML20137N746 + (Forwards Rev 11 to Maine Yankee Operational Quality Assurance Program Which Reflects an Organizational Realignment of Key Nuclear Safety Functions at Plant)
- ML20137N751 + (Forwards Rev 11 to Maine Yankee Operational Quality Assurance Program Which Reflects an Organizational Realignment of Key Nuclear Safety Functions at Plant)
- ML20073P508 + (Forwards Rev 11 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20073B980 + (Forwards Rev 11 to Natl Board Tasks Rept. Rept Tracks Progress on Concerns Raised by Natl Board Interim Repts 1 & 2,Suppls 2,3,5 & 7.W/o Stated Executive Summary)
- ML20140J440 + (Forwards Rev 11 to ODCM for Vogtle Electric Generating Plant. Effected Pages Only for Revs 10 & 11,both Made in 1996,previously Submitted as Attachment 1 to 1996 Annual Rept - Part 2,dtd 970428)
- ML20140J444 + (Forwards Rev 11 to ODCM for Vogtle Electric Generating Plant. Effected Pages Only for Revs 10 & 11,both Made in 1996,previously Submitted as Attachment 1 to 1996 Annual Rept - Part 2,dtd 970428)
- ML20097E954 + (Forwards Rev 11 to Operational QA Manual)
- ST-HL-AE-4948, Forwards Rev 11 to Operations QA Plan + (Forwards Rev 11 to Operations QA Plan)
- ML20212B557 + (Forwards Rev 11 to Oyster Creek Emergency Dose Calculation Manual, IAW 10CFR50,App E,Section V)
- ML20211D202 + (Forwards Rev 11 to PGE-8010, Portland General Electric Co Nuclear QA Program, Per 10CFR50.54(a)(3))
- ML20209G252 + (Forwards Rev 11 to Part I of GE Nuclear Fuel Mfg Dept Application Referenced in Condition 9 of License SNM-1097. Updated Index Pages for Part I & Part I Page W/Corrected Typos Also Encl)
- HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 + (Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21)
- AECM-85-0057, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5))
- ST-HL-AE-2553, Forwards Rev 11 to Physical Security Plan,Rev 11 to Training & Qualification Plan & Rev 7 to Contingency Plan.Plans Withheld + (Forwards Rev 11 to Physical Security Plan,Rev 11 to Training & Qualification Plan & Rev 7 to Contingency Plan.Plans Withheld)
- ML20214X035 + (Forwards Rev 11 to Physical Security Plan,Per Fr Notice of Rule Changes.Rev Withheld)
- ML19332D837 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 73.21))
- ML20195H835 + (Forwards Rev 11 to Physical Security Plan,Safeguards Contingency Plan & Security Training & Qualification Plan. Rev Withheld (Ref 10CFR73.21))
- FVY-85-123, Forwards Rev 11 to Physical Security Plan.Changes Made in Response to Stating That Portions of Change 10 Unacceptable Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Physical Security Plan.Changes Made in Response to Stating That Portions of Change 10 Unacceptable Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- ML20236D884 + (Forwards Rev 11 to Physical Security Plan,Per Requirements of 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- B13393, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20055H583 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20136J109 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20212P137 + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- DCL-84-043, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- W3P90-1512, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20214F235 + (Forwards Rev 11 to Plant Nuclear Security Personnel Training & Qualification Program,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21))
- ML20147C246 + (Forwards Rev 11 to Plant Radiological Emergency Response Plan,Merging Interim Emergency Operations Facility (EOF) & Corporate Emergency Organizations Into EOF Emergency Organization & Changing Emergency Action Levels)
- ML20217C182 + (Forwards Rev 11 to Plant Safeguards Contingency Plan.Rev Withheld (Ref 10CFR50.54(p)))
- ML20102B879 + (Forwards Rev 11 to QA Manual,Page II-18-1 Re Audits,Per Telcon Concerning Closeout of Open Item)
- ML20133F800 + (Forwards Rev 11 to QA Policy & Procedures Manual, in Response to Telcon & .Fee Paid)
- ML20134M242 + (Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals)
- ML20134M245 + (Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals)
- ML17254A712 + (Forwards Rev 11 to QA Program for Station Operation. Organization Changes & Responsibilities in Engineering Organization Discussed)
- ML17254A713 + (Forwards Rev 11 to QA Program for Station Operation. Organization Changes & Responsibilities in Engineering Organization Discussed)
- ML18095B029 + (Forwards Rev 11 to QA Program,Chapter 17.2 for Duane Arnold Energy Ctr)
- NG-90-2640, Forwards Rev 11 to QA Program,Chapter 17.2 for Duane Arnold Energy Ctr + (Forwards Rev 11 to QA Program,Chapter 17.2 for Duane Arnold Energy Ctr)
- ML20138B178 + (Forwards Rev 11 to QA Program.Rev Includes Statement That Nuclear Safety & Regulation Dept Reviews Safety Evaluations as Nuclear Operations Board Staff Function)
- ML20199E092 + (Forwards Rev 11 to QA-AD-001, Chem-Nuclear Sys QAP, for NRC Review & Approval)
- ML20150D209 + (Forwards Rev 11 to Radiological Emergency Response Plan Section M, Recovery & Reentry Planning & Post-Accident Operations)
- ML18026A954 + (Forwards Rev 11 to Radiological Emergency Plan & Revised Emergency Plan Implementing Procedures,Including Procedure IP-19 Re Emergency Data Info Sys)
- ML17309A563 + (Forwards Rev 11 to Re Ginna Nuclear Power Plant UFSAR, Reflecting Changes to Facility & Info & Analyses Submitted to NRC or Prepared Per NRC Requirements Since Last Annual Update Submitted 931216)
- ML20101H638 + (Forwards Rev 11 to Revised Inservice Testing Program for Cps)
- GO2-91-203, Forwards Rev 11 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 11 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21))
- L-96-159, Forwards Rev 11 to Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790(a)(3)) + (Forwards Rev 11 to Safeguards Contingency Plan.Encl Withheld (Ref 10CFR2.790(a)(3)))
- ML20012A153 + (Forwards Rev 11 to Safeguards Contingency Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21))