Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15264A458 + (Forwards Request for Addl Info Re Items 2.1 & 2.2 of Generic Ltr 83-28,per 831104,840117 & 850830 Submittals.Response Requested within 45 Days of Ltr Date)
- ML16341B542 + (Forwards Request for Addl Info Re Items 260.11 Through 260.16 Delineated in 810122 QA Program.Review of Table 3.2-4, Classification of Structure,Sys & Components for Diablo Canyon, Identified Deficiencies in Item 260.17)
- ML17216A293 + (Forwards Request for Addl Info Re Items 2.2.1,2.2.2 & 4.5.3 of Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Info Re Classification of Equipment Important to Safety Needed)
- ML18051B122 + (Forwards Request for Addl Info Re Items 4.2.1 & 4.2.2 of Generic Ltr 83-28, Preventative Maint & Trending Programs for Reactor Trip Breakers, in Order to Complete Review. Response Required within 60 Days)
- ML13331A787 + (Forwards Request for Addl Info Re Items 2.2.2 & 4.5.3, Following Preliminary Review of Licensee Response to Generic Ltr 83-28.Brief Descriptions of Deficiencies Given as Guidelines for Corrective Action Encl)
- ML18092A682 + (Forwards Request for Addl Info Re Items 2.1.1,2.2.1,3.13, 3.23 & 4.5.3,based on Preliminary Review of Responses to Generic Ltr 83-28,Items 2.1,2.2,3.1.3,3.2.3,4.4 & 4.5. Response Requested within 60 Days & 90 Days for Item 4.5.3)
- ML20207S216 + (Forwards Request for Addl Info Re Items 2.1 & 2.2.1 of Generic Ltr 83-28 & Description of Vendor Interface Program. Response to Addl Info Due within 60 Days of Ltr)
- ML20196H836 + (Forwards Request for Addl Info Re Items 2.1 & 2.2 of Generic Ltr 83-28 Concerning Equipment Classification & Vendor Interface on Reactor Trip Sys Components.Open Item Re Scheduling Implementations Should Be Addressed in Response)
- ML20207T009 + (Forwards Request for Addl Info Re Items 2.1 & 2.2 of Generic Ltr 83-28 Concerning Salem ATWS Responses,In Response to 831108 & 850805 Submittals.Coordination W/Assigned Project Manager Requested)
- ML20128K774 + (Forwards Request for Addl Info Re Jan 1985 Draft 2 to Rev 0 to Emergency Plan.Response Requested within 30 Days of Ltr Date)
- ML16340B537 + (Forwards Request for Addl Info Re Jan 1981 Wave Damage to Breakwaters Protecting Plant Intake Structure.Response Needed for Completion of Review)
- ML20199B218 + (Forwards Request for Addl Info Re Jet Pump Riser Cracking for Peach Bottom Atomic Power Station,Unit 3)
- ML20029D030 + (Forwards Request for Addl Info Re June 1992 Application for Design Certification of AP600.Requests Response to Request within 90 Days of Dtd Ltr)
- ML20029D043 + (Forwards Request for Addl Info Re June 1992 Application for Design Certification of AP600.Requests Response to Request by 940630 to Support Staff Review of AP600 Design)
- ML20029D029 + (Forwards Request for Addl Info Re June 1992 Application for Design Certification of AP600.Requests Response to Request by 940630 to Support Staff Review of AP600 Design)
- ML20199F318 + (Forwards Request for Addl Info Re June 1992 Application for Design Certification of AP600 in Area of PRA Analysis for Shutdown Conditions)
- ML20040A443 + (Forwards Request for Addl Info Re Justification for Parameters Used to Calculate Gaseous & Liquid Radwaste Source Terms,To Continue Review of Amend 1 to B-SAR-205. Info to Be Submitted by 760624)
- IR 05000348/1996009 + (Forwards Request for Addl Info Re Kaowool Fire Barriers Installed at Farley Nuclear Plant,Identified in Insp Repts 50-348/96-09 & 50-364/96-09 & Subsequent Insp Repts 50-348/97-12 & 50-364/97-12)
- ML20195K282 + (Forwards Request for Addl Info Re Kinetic Expansion Region Inspection Acceptance Criteria)
- ML19208D033 + (Forwards Request for Addl Info Re Ks Electric Power Cooperative Inc 17% Interest in Facility.Requests to Be Informed of Time of Response Submittal)
- ML19270G279 + (Forwards Request for Addl Info Re LACBWR Cycle 6,in Order to Continue Review of 790226 Request for Tech Spec Changes)
- IR 05000267/1986017 + (Forwards Request for Addl Info Re LER 50-267/86-017 Concerning Sys Interactions That Resulted from Unusually Severe Snowstorm.Response Requested within 10 Days of Ltr Date)
- ML17216A718 + (Forwards Request for Addl Info Re LER-86-007 Concerning Pressurizer Code Safety Valves Inoperability.Response Requested within 30 Days of Ltr Receipt)
- ML17138A763 + (Forwards Request for Addl Info Re LOCA & Safety Relief Valve Pool Dynamic Loads in Area of Containment Systems)
- ML19260D743 + (Forwards Request for Addl Info Re LOCA Analysis for Review of Util Application for partial-loop Operation.Lists time- Dependent Data Needed in Plot Form for Ruptured & Peak Clad Temp Nodes)
- ML19316A081 + (Forwards Request for Addl Info Re LOCA Analysis)
- ML20245F015 + (Forwards Request for Addl Info Re LPCI Pump Flow Surveillance Amend Based on Review of 890531 Tech Spec Amend Request)
- ML19332E515 + (Forwards Request for Addl Info Re LPCI Swing Bus Transfer Scheme on Single Failure Vulnerability.Response Requested within 45 Days)
- ML19309A045 + (Forwards Request for Addl Info Re Lack of Subcompartment Pressure Analysis,Cold Leg Break at Pump Suction Analysis Considering Stored Energy in Steam Generator & Hydrogen Purge Sys.Initial FSAR Filing Deficient in These Areas)
- ML20003C454 + (Forwards Request for Addl Info Re Leakage from RHR Suction Valve Nearest to Suppression Pool During post-LOCA long-term Cooling)
- ML19260B039 + (Forwards Request for Addl Info Re Lessons Learned Items. Response Required by 791128)
- ML19275A548 + (Forwards Request for Addl Info Re Level Measurement Errors Due to Environ Temp Effects on Level Instrument Ref Legs. Info Due by 791012)
- ML19254E430 + (Forwards Request for Addl Info Re Level Measurement Sys,Per IE Bulletin 79-21)
- ML16340A609 + (Forwards Request for Addl Info Re Level Measurement Errors Due to Environ Temp Effects on Level Instruments Ref Legs)
- ML15112A618 + (Forwards Request for Addl Info Re Licensee Electrical Distribution Sys TS)
- ML20210Q769 + (Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628)
- ML17310A502 + (Forwards Request for Addl Info Re Licensee 930416 Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers)
- ML20217H342 + (Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr)
- ML20153D944 + (Forwards Request for Addl Info Re Licensee 980513 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves, for Duane Arnold Energy Center)
- ML19327B322 + (Forwards Request for Addl Info Re Licensee 890501 Application for Amend to License SNM-33.Response Requested in Form of Revised Pages to Application & within 20 Days)
- ML17195A759 + (Forwards Request for Addl Info Re Licensee Response to Generic Ltr 83-28,Items 2.1,2.2.2 & 4.5.3.Info Requested within 90 Days for Items 2.1 & 2.2.2 & within 120 Days for Item 4.5.3)
- ML15112A304 + (Forwards Request for Addl Info Re Licensee 980706 License Renewal Application Pursuant to 10CFR54 for Oconee Nuclear Station,Units 1,2 & 3.Response Due within 30 Days of Receipt of Ltr)
- ML20151V397 + (Forwards Request for Addl Info Re Licensee 971217 Submittal of Reactor Coolant Sys Integrated Plant Assessment Technical Rept as Part of License Renewal Application)
- ML16259A280 + (Forwards Request for Addl Info Re Licensee Concerning Changes to Plant Topical Rept, QA Program)
- ML20203F491 + (Forwards Request for Addl Info Re Licensee 981125 Amend Application Re TS Change Request 277 for OTSG Inservice Insp During 13R for Three Mile Island,Unit 1)
- ML20135E115 + (Forwards Request for Addl Info Re License Amend Request Change to RCS Flow Requirements to Allow Increased Steam Generator Tube Plugging)
- ML20236N703 + (Forwards Request for Addl Info Re Licensee Amend Request, Dtd 980227.Response Requested within 30 Days of Date of Ltr)
- ML20248K114 + (Forwards Request for Addl Info Re Licensee Request for Amend to Wolf Creek TS to Support Modification to Increase Spent Fuel Pool Capacity at Wolf Creek Nuclear Generating Station)
- ML19341B896 + (Forwards Request for Addl Info Re Licensee 790129 QA Program.Outstanding Info Includes Identification of safety- Related Sys,Structures & Components,Qualifications for QA Manager & Design Review Responsibility.Licensee Reply Encl)
- ML20153G429 + (Forwards Request for Addl Info Re Licensee Revised Emergency Action Level Guidelines for Limerick Generating Station, Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3. Response Requested within 30 Days of Receipt of Ltr)
- ML18066A206 + (Forwards Request for Addl Info Re Licensee 970127 & 980129 Responses to GL 96-06 .GL Included Request to Evaluate CWS That Serve Containment Air Coolers to Assure Not Vulnerable to Waterhammer & two-phase Flow Conditions)