MARCH 9, 1987 Docket Nos.: 50-313 and.50-368 Mr. T. Cene Campbell Vice President Nuclear Operations Arkansas Power & Light Company Post Office Box 551
- Little Rock, Arkansas 72203
Dear Mr. Campbell:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING ITEMS 2.1 and 2.2.1 of' Generic Letter 83-28 In conducting our review of your responses to our Generic Letter 83-28, we _have determined that we will need the additional information identified in the enclosure to continue our review.
In addition, we will need a description of-the vendor interface program. As discussed with and agreed to by Mr. T. Enos of your staff, your response is requested within 60 days of your receipt of this-letter.
The reporting.and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Please contact us if you have any questions concerning the request.
Sincerely, psi Guy S. Vissirg, Project Manager Robert S. Lee, Project Manager PWR Project' Directorate No. 6 PWR Project Directorate No. 7 Division of Licensing-B Division of Licensing-B-
Enclosure:
Request for Additional Information cc: See next page Distribution:
.iDecket" File 7 B. Grimes F. Miraglia NRC'PDR ~
J. Partlow.
0GC-Bethesda LPDR N. Thompson E. Jordan PRC System R. Lee J. Lee i.
.F. Miraglia ACRS(10)
Ihp PBD [ [ h D: 7 l.
/es GWknighton GSVissing fo JStol 3/7 /87 3/lS/87 3// /87 3/g/87 (1703190140 870309
~
PDR ADOCK 05000313 P
PDR t
=
t Mr. T. Gene Campbell Arkansas Nuclear One Arkanses Pcwer & Light Ccmpany l' nit No. 2 cc:
Mr. J. Ted Enos, Manager Mr. Charlie B. Brinkman, Panager Nuclear Engineering and Licensing Washington Nuclear Operations Arkansas Power and Light Company C-E Power Systems P. O. Eox 551 7910 Woodmont Averue Little Fock,_ Arkansas 72203 Suite 1310 Fethesda, Maryland 20814
- Mr. James M. Levine, Directcr Site Nuclear Operations Arkansas Nuclear 0ne P. O. Box 608 Russellville, Arkansas 72801 Nicholas S. Reynolds, Esq.
Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N.W.
Suite 700 Washington, D.C.
20036 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Senior Resident Inspector U.S. Nuclear Regulatory Ccnmission P. O. Box 2090 Russellville, Arkansas 72801 Mr. Frank Wilson, Director Division of Envircomental Health Protection Arkansas Department of Health 4815 W'st Parkam Street e
Little Rock, Arkansas 72201 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220 7910 Woodmont Avenue Bethesda, Maryland 2081a
F" aA Enclosure
-riansas hoclear One. Unit her. t ar.c.
1.
l t r.t 2.
.1
- Prcoras A.
The licensee's rcsocr.tc docs nct con tra that the 0-Jitt contains all satr+.-rclated cettenenti.
E.
The licenste s ret unst dces r4ct c o n t t r a. inat Ail s a i c *. - r e l e t s. r c ont en cn t s art cesignited as isi tv-relatsc cn plant cocuments socn a=
or:ccoures. sestcm descrictions. t e s t e n d a n a r t e n e n c e i n s t r u c t i c t. +. c o e r p t : r. n procedures, and in inicreatten handlano systems so that ccrsonnel cer+tre.in-activities that affect sucri safetv-related tcmpenents are aware that tr.c. 3rc working cn safet t-relatEd CCEDOnents and are guided b) Sattt'.-relatc0 procedures and constraints.
2.
Item 2.2.1.1 - Ident: 4tcattcn Criteria n.
The licensee 's resocnse dces nct cor. firm that the criteria scetsf2cc in the procurement crocedure is accettacle for use in tne elessification prcores.
6.
The licensee ~ s response does not confirm that the criteria to ce used in the new component lewel equipment classification listing is ccnsistant with those spe:itied in section 2.I.1 of the generic letter.
3.
Item 2.2.1.2 - Intersation bancisng Systes The licensee s response has not cor. firmed that the infsracticr.
handling system 2ncludes a list of safety-related equipncnt and that procedures exist which gosern its de.elcoment and calidation.
4.
Item 2.2.1.3 - Use of the Equipment Classification Listing The licensee s response has not confirmed tnat criteria end crecedurcs exist which govern the use of the information handling system tc determine that an actasaty is safet'.-related and what proteaures for maintenance. surveillance parts reclacement and other artisities deisnec in the intrcdu: tion to 10 CFF 50 Appendit B. anply to safete-related con onents.
5.
Item 2.2.1.4 - Management Controle The licenset s resocrise nas not confirmed how management d e t er a.: n e s that the management centrols utilized to verifs that the procedures fcr prep ration. validatten and routine utili:ation of the i n f o r.Tia t i c n systen ha.e been icllcwed.
[
's 4
\\e 3.
l ' e Ca.
- 2. i. 5 - I eil ch '/Or i t' I C s t i O r i f; 3 frQCur?FEGt Ihr 11C605CE 5 TE500056 00eF %Ct CGrnt1rm thAt thE1r p r C O U ' E c. e n *.
E D G r 6
- 1 C F t 1 L r, E re0Ulfs t r, c t t. h e a g g.r o p r i f ' t de519D.eratitet10r. ar.d la a i t1 C st1 0l. C E F t i fl 0 Ce pf0.'idEd D/ tht s u te ; lier.trocEduref.5-item r
O f 4 T P 3 p t. i c t. 5. { & l t a r, d s: 9 ) n t i r, + n t s i t,4 t r b C l i C I,5 h
- - - - ' '