Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Rept of Const Startup Progress for Mar 1981". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • L-82-297, Forwards Rept of Const/Startup Progress for June 1982. Fuel Load Target Date of 821028 Anticipated  + (Forwards Rept of Const/Startup Progress for June 1982. Fuel Load Target Date of 821028 Anticipated)
  • L-81-210, Forwards Rept of Const/Startup Progress for Apr 1981  + (Forwards Rept of Const/Startup Progress for Apr 1981)
  • ML17212B390  + (Forwards Rept of Const/Startup Progress for Dec 1981)
  • ML17209A627  + (Forwards Rept of Const/Startup Progress for Jan 1981)
  • ML20050E202  + (Forwards Rept of Contamination Involving Visitors & Personnel on Upper Research Level of Containment Bldg Adjacent to Pool)
  • ML20029C532  + (Forwards Rept of Contamination Survey at Clevite Corp Facility,Per 620827 Memo)
  • ML20028F273  + (Forwards Rept of Control of Heavy Loads Response to Franklin Research Ctr Review.)
  • ML20028F272  + (Forwards Rept of Control of Heavy Loads Response to Franklin Research Ctr Review)
  • ML20077F094  + (Forwards Rept of Corrections to Westinghouse ECCS Evaluation Models Which Documents Absolute Cumulative Effect Upon SBLOCA Analysis of Greater than 50 F,In Accordance W/ 10CFR50.46)
  • ML20212B234  + (Forwards Rept of Discharge Monitoring at Diablo Canyon Power Plant During Month of Nov 1986)
  • ML20205F150  + (Forwards Rept of Div Review of Document Entitled, Living W/O Landfills by M Resnikoff)
  • ML20211J052  + (Forwards Rept of Doe/Nrc Licensing Support Sys (LSS) Interagency Coordinating Committee 861002 Meeting in Washington,Dc Re DOE Progress in Developing LSS & NRC Progress W/Lss Pilot Project.Agenda & Viewgraphs Also Encl)
  • ML18153A603  + (Forwards Rept of ECCS Evaluation Changes & 30-day Rept of ECCS Evaluation Model Changes Per 10CFR50.46)
  • ML18153D110  + (Forwards Rept of ECCS Evaluation Model Changes,Per 10CFR50.46.Calculated Peak Clad Temp for Small & Large Break LOCA Analyses Listed.No Generic Changes to ECCS Evaluation Models Implemented During June 1991 Through May 1992)
  • ML18153B370  + (Forwards Rept of ECCS Evaluation Model Changes & 30-day Rept Per Requirements of 10CFR50.46)
  • ML20046A552  + (Forwards Rept of ECCS Evaluation Model Changes & 30-day Rept Per Requirements of 10CFR50.46)
  • ML20071K917  + (Forwards Rept of ECCS Evaluation Model Changes & 30 Day Rept Per 10CFR50.46 Requirements)
  • ML18152A505  + (Forwards Rept of ECCS Evaluation Model Changes & Application in Existing Licensing Analyses,Including Excerpted Portions of Westinghouse Rept Describing Changes to Westinghouse ECCS Evaluation Models Implemented During CY92)
  • ML20002D280  + (Forwards Rept of ECCS outages,1976-80,per NUREG-0737,Item II.K.3.17.ECCS Outage Frequency Does Not Constitute Excessive Unavailability.No Tech Spec Changes Are Warranted)
  • ML20153G892  + (Forwards Rept of EEI on Nuclear Power, Per 851220 Request for Comments Re Proposed Rev to 1978 Policy Statement on Standardization.Administrative & Legislative Actions Needed for Effective Standardization)
  • ML18046A978  + (Forwards Rept of Eddy Curent Testing,Data Evaluation & Tube Plugging,Oct 1981. Rept Describes Steam Generators Insp of Sept-Oct 1981 & Is Complete Except for Results of Dent Magnitude & Profilometry Measurements)
  • ML18046A979  + (Forwards Rept of Eddy Curent Testing,Data Evaluation & Tube Plugging,Oct 1981. Rept Describes Steam Generators Insp of Sept-Oct 1981 & Is Complete Except for Results of Dent Magnitude & Profilometry Measurements)
  • ML18044A286  + (Forwards Rept of Eddy Current Testing Data Evaluation & Tube Repair, Oct 1979)
  • ML18044A287  + (Forwards Rept of Eddy Current Testing Data Evaluation & Tube Repair, Oct 1979)
  • ML20211G530  + (Forwards Rept of Emergency Evacuation Review Team on Emergency Response Plans for Perry & Davis-Besse Nuclear Power Plants. Rept Concluded That Current Emergency Response Plan Inadequate.Served on 870128)