ML20101T380

From kanterella
Jump to navigation Jump to search
Forwards Rept of Changes to Rev 6 to Safeguards Plan.Rept Withheld (Ref 10CFR73.21)
ML20101T380
Person / Time
Site: Cooper 
Issue date: 12/20/1984
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CNSS844374, NUDOCS 8502060129
Download: ML20101T380 (2)


Text

,

s COOPER NUCLEAR STATION

[

Nebraska Public Power District

  • "
  • 1"E" =;'=; L""^,5"^ "

6 CNSS844347

" ~ ' " " "' ""'

ATTACHMENT CONTA NS

~

d ~

Mr. Robert D. Martin Regional Administrator U.S. Nuclear Regulatory Commission 6

Rya Plaza Drive EI E DIdfd Suite 1000 Arlington, Texas 76011 Gentlemen:

Subject:

Cooper Nuclear Station Safeguards Plan; Report of Change-Revision Number Seven The Physical Security Plan (Volume I of the CNS Safeguards Plan) is being revised to incorporate numerous security upgrades and other modifications at i

the Cooper Nuclear Station.

These changes include, but are not limited to, site building additions and modifications, fenceline relocation, new station access badges, CNS organizational changes, security force re-organization, and a security computer upgrade.

Clerical (i.e.,

capitalization, numerical listing and sequencing, format layout, page numbering, identity and date, etc.) and numerous terminology corrections and substitutions have also been made where necessary. Additionally, Attachment I (temporary Security Measure During Construction of the Fire Protection System) should be deleted.

Accordingly, Nebraska Public Power District is submitting, in accordance with the provisions of 10CFR Part 50.54(p), a Rdbort of Change to the Cooper Nuclear Station Safeguards Plan, Revision Six.

Upon incorporation of this change, the current Safeguards Plan becomes Revision Seven. We believe, the enclosed changes, annotated by sidebars, do not decrease the safeguards effectiveness of the plan.

The material-enclosed herewith contains Safeguards Information as defined by 10CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited.

Therefore, we request the material, with the exception of the cover letter, to be withheld from public disclosure.

j@@hh h

l p

J. M. Pilant i

E Technical Staff Manager ggl Nuclear Power Group

^

.JMP:LLR:su l

8502060129 fDRADOCK0ochg I.1 l (

PDR h

  • 3001 t

m s.

.:::::::rn.:::t1n ATTACHMENT CONTAINS 1

SAFEGUARDS INFORMATION Enclosures (6 copies of Plan and Volume I Title Pages, Volume I Table of Contents (Page I - VII), Pages 3, 7, 8, 11, 13-15, 18, 21, 23-25, 28-30, 37, 39, 40, 44-46, 51, 55, 56, and Attachment B) cc: Director w/o encl.

Office of Nuclear Reactor Regulation Attention: Document Control Desk U.S. Nuclear' Regulatory Commission b W If8El Egg lggrg, Washington, D.C. 20555 llagdle this W g M0lled.

a

-4