L-81-210, Forwards Rept of Const/Startup Progress for Apr 1981

From kanterella
Jump to navigation Jump to search
Forwards Rept of Const/Startup Progress for Apr 1981
ML17209B105
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/19/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-81-210, NUDOCS 8105270086
Download: ML17209B105 (5)


Text

REGULATORY NFORMATION DISTRIBUTION S

'EM (RIDS)

ACCESSION NBR:810527(086 DOC.DATE: 81/05/19 NOTARIZED:

NO FACIL'.:50"389 St. Lucie Pl anti Uni t 2E Florida Power L Light Co.

AUTH;NAME" AUTHOR AFFILIATION UHRIGRR,ED Florida-Power L Light Co.

REC IP ~ NAMEl RFCIPIENTAFFILIATION EISENHUTEDOG.

Division of Licensing DOCKEiT' 05000389 s'

~

SUBJECT:

Forwards rept of const/startup progress for Apr DISTRIBUTION CODE:

BOO IS COPIES RECEIYED:LTR 9" ENCL Q TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES':'981, SIZE':

RECIPIENT ID CODE/NAME ACTION:-

A/D LICENSNG LIC BR P3 LA INTERNAL:

ACC ID EVAL BR26" CHEM ENG BR, 08 CORE PERF BR 10 EMERG. PREP 22'EOSCIENCES10 HYD/GEO BR 15 IE,E'>>

06 LIC" QUAL BR MECH ENG BR 18 NRC, PDR 02 OP LIC BR PROC/TST REV 20 RAo SS BR22 F IL 01 NG BR25 COPIES LTTR ENCL 1

0 1

0 1

1 1

1 1

1 1

0 1

1 2'

3 3

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME L>>I C BR 5P BC NERSESEV ~ '0 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR I8C SYS BR 16 LIC GUID BR MATL. ENG BR 17 MPA OELD PONER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT'NAL BR 24 COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

1 3

3 1

1 1

1 1

1 1

1 1

0 1

0 1

1 1

1 1

1 1

1-EXTERNAL':

ACRS NSIC 27 05 16 16 1

1 LPDR 1

1 MAY 2 8 Iggf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 56 ENCL 50

~

~ 'l e

FLORIDAPOWER & LIGHTCOMPANY May 19, 1981 L-81-210 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Eisenhut:

IIl~(ygAi@

'b Re:

St. Lucie Unit 2 Docket No. 50-389 Construct'ion/Start-u Pro ress U date Attached is a report of the construction/start-up progress for St. Lucie Unit 2 for April, 1981. If you have any questions regarding the attached information, or would like additional information from FPL, please feel free to call me.

Very truly yours, Robe t E. Uhrig Vice President Advanced Systems 5 Technology REU/TCG/ah Attachment cc:

William H. Lovelace, Office of Management

& Program Analysis U. S. Nuclear Regulatory Commission J.

P. O'Rei lly, Director, Region II Harold F. Reis, Esquire

>>65avosg PEOPLE... SERVING PEOPLE

FLORIDA POMER

~ LIGHT COMPANY'T, LUCIE UNIT 2 CONSTRUCTION(STARTUP MONTHLY'TATUS REPORT CURRENT PERIOD:

April, 1981 SCHEDULE STATUS; Overall Project Construction/Start up Critical Path VqrIqrice Target Fuel Load Date 75 0

68,1 0,0 10/29/82 MAJOR WORK HIGHLIGHTS:

SCHEDULED ACTUAL l.

2.

3 ~

4.

5.

6.

7 ~

8.

Refueling Water Storage Tank Complete Primary Mater Storage Tank Complete Diesel Oil Storage Tank Complete Compl.

Weld Out of CEDM Lower Pres.

Housings RC Loop Stress Relieving Completed Start Inst. of Reactor Internals in RCB Start Inst. of Pressurizer Surge Line Compl.

15 of 16 Turnovers During Month

!t/30/Sl 5/'20/SI 5/O3/81 4/24/81 3/24/81 4/13/81 3/24/81 4/28/Si 4/29/81 4/30/81 5/Ol/81 4/14/81 4/14/Sl 4/O2/81 BULK QUANTITY STATUS:

TOTAL TO DATE PHYSICAL QUANTITY'ERCENT CURRFNT AVERAGE MONTHLY MONTH INSTAL. RATE (QTY,/Mo.)

QUANTITY'o%%uo 90%%uo To DATE FORECASTED Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (ea)

Large Bore Hangers (tn)

Whipping Restraints (lf)

Cable Tray (1 f)

Condui t (Exp.

Emb.,

U/D)

(1 f)

Lighting Conduit (1 f)

Power Cable Pull (lf)

Control Cable Pull(lnc,Com)(lf)

Signal Cable Pull (lf)

Terms - Pwr.

Hi (ea)

Terms - Pwr Lo (ea)

Terms - Control (ea)

Terms - Signal (ea) 125,944 91 0

64,229 75.8 50)026 50.0 427 762 28

~ 7 2,439 50.7 335 59.8 33)351 87,7 242,773 51.6 82,646 SO,O 307,68O 47,O 933,899 41,0 211,748 22.3 246 48.9 2,861 36.9 16)996 23,2 2,011 3.8 3,346 2,131 6,O64 10,88O 87 83 950 8,O41 1,102 25,332 90)600 47,020 (11}

543 2,702 1,009

2) 715 2,165 4,455 4,695 105 30 1,745 6,885 2,500 337600 140,655 58,64o 30 520 3,200 2,78O 1,955 4,4Oo 4,155 135 25 l)300 7,700 2,060 25,215 90,790 44,455 25 315 3,48O 3,535 START-UP PROGRAM STATUS:

SCHEDULED COMPLETED SCHEDULED TO DATE TO DATE FOR MONTH CURRENT MONTH TOTAL REOUIRED Preoperational Test Procedures System Turnovers Preoperational Tests 169 64 14 159 63 2

15 16 0

8 15 0

193 242 193

t t