L-81-135, Forwards Rept of Const Startup Progress for Mar 1981

From kanterella
Jump to navigation Jump to search
Forwards Rept of Const Startup Progress for Mar 1981
ML17209A907
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/31/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-81-135, NUDOCS 8104060783
Download: ML17209A907 (5)


Text

~A REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:8104060783, DOC ~ DATEs 81/03/31 NOTARIZED!

NO FACIL::50-389 St. Luc)e Plantr Un)t 2~ Florida Power 8 Light Co.

AUTH,NAME AUTHOR AFFILIATION UHRIGr R ~ E ~

Florida Power 8 Light Co.

RECIP ~ NAME RKCIPIENT AFFILIATION E'ISENHUT'i'.

Division of L)censing

SUBJECT:

Forwards rept" of const startup progress for Mar

1981, DISTRIBUTION CODE! 8001S COPIES RECEIVED:LTR ENCL 'IZE TITLEi: PSAR/FSAR AMDTS and Related Cot'respondence NOTES

DOCKET ¹ 05000389 RECIPIENT IO CODE/NAMEi ACTION:

A/D LICENSNG RUSHBROOKrMo INTERNALS ACCID EVAL'R26 CHEM ENG BR 08 CORE PERF BR 10.

EMERG PREP 22".

GEOSC IENCES 14 HYD/GEO BR 15 III,K ob LIC QUAL BR MECH ENG BR 18 NRC POR 02' OP LIC BR PROC/7ST REV 20.

'BQS BR22'EG LF 01 UCT ENG BR25 COPIES I."TTR ENCL 1

0 0

1 1

1 1

0 1

2 2

3 1

1 1

1 1

1 1

1 1

1 1

1-1 1

1 RECIPIENT ID CODE/NAME YOUNGBLOODgB NERSESrV ~ '4 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12'QUIP QUAI. BR13 HUM FACT ENG BR I8C" SYS BR 16 LIC GUID BR MATL ENG SR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS 'BR

?3 SIT'NAL BR 24 SYS INTERAC BR COPIES LTTR ENCL' 0

1 1

1 1

1 1

3 1

1 1

1 1

1 1

0

,1 0

1 1

1 1

1 1

.1 1

1 1

EXTERNAL! ACRS NSXC 27 05(

16 16 1

1 LPDR 03 1

1 TOTAL NUMBER OF COPIES REQUIRED'>>'LTTR 57 ENCL 51 "k+ o$ i pl)e

~ ~ $ +iii+I Ill+'i"

'I 1 tf

))

I t" ~I,r I)

II 0,

)

)I

!)

)

H

))

)I

P.o. BOX 529100 MIAMI,F L 33152 FLORIDAPOWER & LIGHTCOMPANY March 31, 1981 L-81-135 Office of Nucl ear Reactor Regul ation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Eisenhut:

RE:

St. Lucie Unit 2 Docket No. 50-389 Construction/Start-u Pro ress U date Attached is a report of the construction/start-up progress for St. Lucie Unit 2 for March, 1981.

If you have any questions regarding the attached information, or would like additional information from FPL, please feel free to call me.

Very truly yours, Ro ert E. Uhrig

- Vice President Advanced Systems

& Technology REU/TCG/gw Attachment cc:

William H. Lovelace, Office of Management 8 Program Analysis U. S. Nuclear Regulatory Commission J.

P. O'Reilly, Director, Region II Harold F. Reis, Esquire P0O) i/i 8X0:405 0 7U PEOPLE... SERVING PEOPLE

FLORI DA POWER 0 LI GHT COMPANY ST.

LUCIE UNIT g2 CONSTRUCTION/START UP MONTHLY STATUS REPORT CURRENT PERIOD:

March, 1981 SCHEDULE STATUS:

Overa1 I Project Cons truct ion/S ta rt-up Critical Path Variance Target Fuel Load Date 73.0 65,5 0.0 10/29/82 MAJOR WORK HIGHLIGHTS:

1.

Start installation of CEDM lower motor housings 2.

Complete CCB monorail 3.

Complete concrete placement of struts across RCB safety injection trenches 4.

Set safety injection tank 2B1 in RCB 5.

Start installation of dewatering system for discharge canal excavation 6.

Complete installation of DGB missile barrier 7.

Complete fire protection line 113 connection to Unit 1

8.

Turnover installation of air supply system to Start-up SCHEDULED 3/02/81 3/12/81 6/08/81 3/02/81 5/18/81 3/29/81 3/08/81 2/11/81 ACTUAL 3/13/81 3/20/81 3/12/81 3/03/81 3/02/81 3/03/81 3/05/81 3/13/81 BULK QUANTITY STATUS:

TOTAL TO DATE QUANTITY PERCENT CURRENT MONTH QUANTITY TO DATE FORECASTED AVERAGE MONTHLY

INSTAL, RATE (QTY,/MO.)

10/, - 900 Concrete (cy)

Large Bore Pipe (tt)

Small Bore Pipe (ft)

Large Bore Hangers (ea)

Whippirig Restraints (tn)

Cable Tray (ft)

Exposed and Embedded Conduit (ft)

Power Cable (ft)

Control Cable (ft)

Terminations (ea) 122,598 62,098 75,844 2,352 252 32,401 316,276 282,348 1,008,027 17,865 87.9 74,2 39 7

47. 4 52,1 84.2 50.7 42.9 28.0 17,7 705 2,311 7,271 63 90 753 6,422 28,147 160,349 3,888 2,875 2,170 7,040 110 25 1,795 9,290 34,975 170,730 2,160 2,720 1,920 7)250 130 25 1,210 8,470 26,740 125,920 4,875 START UP PROGRAM STATUS; Preoperational Test Procedures System Turnovers (Prel iminary)

Preoperational Tests SCHEDULED TO DATE 150 17 13 COMPLETED TO DATE 146 47 2

CURRENT MONTH ll 6

0 TOTAL REQUIRED 193 238 193

1