~E' tl REGULA)
INFORMA'TION DISTR I BUT I 0 TEM (R IDS)
ACCESSION NBR:8202190180 DOC ~ DATE: 82/02/11 NOTARIZED:
NO FACIL,50-389 St, Lucie Plant~, Uni~t 2, Florida Power 8 Light Co ~
AUTH ~ NAME AUTHOR AFFILIATION UHRIG~RREB Florida Power 8 Light Co ~
RECI'P,llAME RECIPIENT AFFIL'IATION EISENHUTEDBG ~
Di,vision of Licensing DOCKET 05000389
~
~
w<<
SUBJECT:
Forwards nept of const/startup progress for Dec DISTRIBUTION,CODE:
B0010 iCOPIES lRECEIYED:LTR ENCL,J.
TITLE: PSAR/FSAR AMDTS and 'Rel.ated -Conrespondence NOTES:
1981
'I E ~
I
~
RECIPIENT ID CODE/NAME ACTION:
A/D LICENSNG LIC -=BR 03 LA INTERNALS ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB
>30 NRR/DE/MTEB 17 NRR/DE/SAB "24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR/D RSB
'2$
FILE 04 EXTERNAL: ACRS 4f FEMA REP DIV 39 NRC,PDR 02 NTI' ICOP I ES
.L'TTR ENCL f
<<0 1
'0 1
'0 1
1 1
'0
'3 2
"2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 16 16 1
1 1
1 1
REC IP IENT ID CODE/NAME LIC BR 4$
BC NERSEStV ~
01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DSI/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 BNL (AM<<DTS ONLY)
LPDR 03 NSIC 05 COPIES
'LT'TR ENCL 1
0 1
1 3
3 3
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER,OF COPIES REQUIRED:
LTTTR 63 ENCL,58
w
~>>,,o g
efffffs f10 1
1 4 "fffJ
~
fuff e
e'ff If
'll &4 I
'~ff l I
ief I'l lI'VN>J>>
e w ~
~ e e
a t,~
ff'$~) "3 5
j IIeff )I f$ fg f~'f/'f)Q+
'f eP Qf'yrgQ Pl'gl'ice 3e)
~
f fl
<ll' ff~lhgffll ~ ) +if'
$ lffA )
1fjlly(
)
f "ffflfff e
~ lf II g
fS, ff f
Jt P,'f
)
I 1k
~ g q n
P i
$ T fjI I
'f W fthm ffT ) ~>f "c~
k...,3,.)
11',f l ),fflf J
)
ff'.
kf K
f C'l Pa, f rfg fh
- 'xT, 1f7 i
~l f 'f f1
$ -f!.,l ilgffPI
-1) ~
ff ff f
,f t flf f f, f
':'f f
1',f
<<Wg 'W "shan
,5>
I h'~II e'
pf
'1ff(~
)"
f f I t fl g f ff f
~ P.O. BOX 529100MIAMI,FL 33152 gil4~
SIA>N FLORIDAPOWER & LIGHTCOMPANY February 11, 1982 L-82-50 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U.S.
Nuclear.; Regulatory Commission Washington, D.C.
20555 Very truly yours, e
~CQIIQg
Dear Mr. Eisenhut:
t'Eel 8 lg g~~ 82~
e~~~~
Re:
St. Lucie Unit 2 Docket No. 50-389 Construction Start-u Pro ress U date I
Attached is a report of the construction/start-up progress for St.
Lucie Unit 2 for December, 1981. If you have any questions regar-ding the attached information, or would like additional information from Florida Power 8 Light Company (FPL), please feel free to call me or Mr. W.B. Derrickson, the St. Lucie Unit 2 Pro'ject General
.Manager (305) 552-4659.
rt E. Uhrig Vice President Advanced Systems and Technology REU/RAK/mm cc:
William H. Lovelace, Office Management 8 Program Analysis U.S. Nuclear Regulatory Commission J.P. O'Reilly, Director, Region II Harold F. Reis, Esquire
'"8202i90184 8202ii PDR ADOCN 050003S'8 R
PDR~
PEOPLE... SERVING PEOPLE
FLORIDA POWER (M LIGHT COMPANY ST.
LUCIE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT
>CURRENT PERIOD:
December 1981
)SCHEDULE STATUS:
Overall Project 83.8 Construction/Start-up 80,9 Critical Path Variance
-4. 0 Target Fuel Load Date 10/28/82
)MAJOR WORK HIGHLIGHTS:
CHEDULED ACTUAL
)1.
2.
3.
4.
5.
6.
7 ~
Start Turbine on Turning Gear RCB began installation of Fuel Transfer Tube Rails RAB completed weld down of HVAC Equipment HVS-SB Began Cask Storage Mat'ormwork",
Erection of Cask Storage Crane Structural Steel Complete final alignment of the Reactor Internals Began installation of Refueling Cavity Seal Ring 12/15/81 11/03/81 11/30/81 12/11/81 01/12/82 11/30/81 12/01/81 12/16/81 12/03/81 12/01/81 12/02/81 12/03/81 12/06/81 12/07/81 BULK QUANTITY STATUS:
CURRENT TOTAL MONTH TO DATE QUANTITY QUANTITY QUANTITY 3?ERCENT 12/31/81 AVERAGE MONTHLY INSTAL. RATE (QTY/MO) 10%
90%
12/81
'TO DATE FORECASTED Concrete (cy)
Large Bore Piping (lf)
Small Bore Piping (lf)
Instrument Tubing (lf)
Large Bore Hangers (ea)
Whipping Restraints (tn)
Cable Tray (lf)
Conduit (Exp.,
Emb.<
U/D (lf)
Lighting Conduit Power Cable Pull (lf)
Control Cable Pull (Inc.
Comm. ) (lf)
Signal Cable Pull (lf)
Terms - Pwr Hi (ea)
Terms Pwr Lo (ea)
Terms - Control (ea)
Terms - Signal (ea) 136( 109 73(809 75,.733 74,397 3,125 476 38(73K 315(888 95(066 40gq 183
~
l'1'(445(636 525/343 461 7, 192 34,375 10,149 98,3 94,2 80,0 73.3 71.5 80.7 97.7 88.8
-82,2 H.,4
'66. 5 39,7 82.8 85,6 46.1 19.3 ESSENTIALLY ESSENTIALLY 2,806 6,540 154 8
ESSENTIALLY 8(078
- 3. (,374 6( 33.4 52 (,9.78 44(699 21 529 1,634 1,635 COMPLETE COMPLETE 3(900 4,280 100 25 COMPLETE 7 (,38Q.
2 (,260.
23(46Q 94(490 39(290 30 530 2,450 1,220 4,400 4,155 135 25 7 (7QCL 2(Q6Q 25(215 90(790 44(455 25 315 3,480 3,535 START-UP PROGRAM STATUS:
Preoperational Test Proced.
System Turnovers (PTO)
System Turnovers (CTO)
Preoperational Tests Performed SCHEDULED TO DATE 203 201 84 23 COMPLETED TO DATE 198 164*
44*
8 SCHEDULE FOR MONTH 6
42 38 7/27**
CURRENT MONTH 1
26*
30*
4/30**
TOTAL
~RE UIRED 203 272 159 203
- NOTE:
Includes Packages in signoff circuit
- NOTE:
Included preops in progress