Forwards Rept of Const/Startup Progress for Dec 1981
ML17212B390
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/11/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-82-50, NUDOCS 8202190184
Download: ML17212B390 (5)


Text

~E' tl REGULA)

INFORMA'TION DISTR I BUT I 0 TEM (R IDS)

ACCESSION NBR:8202190180 DOC ~ DATE: 82/02/11 NOTARIZED:

NO FACIL,50-389 St, Lucie Plant~, Uni~t 2, Florida Power 8 Light Co ~

AUTH ~ NAME AUTHOR AFFILIATION UHRIG~RREB Florida Power 8 Light Co ~

RECI'P,llAME RECIPIENT AFFIL'IATION EISENHUTEDBG ~

Di,vision of Licensing DOCKET 05000389

~

~

w<<

SUBJECT:

Forwards nept of const/startup progress for Dec DISTRIBUTION,CODE:

B0010 iCOPIES lRECEIYED:LTR ENCL,J.

TITLE: PSAR/FSAR AMDTS and 'Rel.ated -Conrespondence NOTES:

1981

'I E ~

I

~

RECIPIENT ID CODE/NAME ACTION:

A/D LICENSNG LIC -=BR 03 LA INTERNALS ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB

>30 NRR/DE/MTEB 17 NRR/DE/SAB "24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR/D RSB

'2$

FILE 04 EXTERNAL: ACRS 4f FEMA REP DIV 39 NRC,PDR 02 NTI' ICOP I ES

.L'TTR ENCL f

<<0 1

'0 1

'0 1

1 1

'0

'3 2

"2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 16 16 1

1 1

1 1

REC IP IENT ID CODE/NAME LIC BR 4$

BC NERSEStV ~

01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DSI/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 BNL (AM<<DTS ONLY)

LPDR 03 NSIC 05 COPIES

'LT'TR ENCL 1

0 1

1 3

3 3

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 TOTAL NUMBER,OF COPIES REQUIRED:

LTTTR 63 ENCL,58

w

~>>,,o g

efffffs f10 1

1 4 "fffJ

~

fuff e

e'ff If

'll &4 I

'~ff l I

ief I'l lI'VN>J>>

e w ~

~ e e

a t,~

ff'$~) "3 5

j IIeff )I f$ fg f~'f/'f)Q+

'f eP Qf'yrgQ Pl'gl'ice 3e)

~

f fl

<ll' ff~lhgffll ~ ) +if'

$ lffA )

1fjlly(

)

f "ffflfff e

~ lf II g

fS, ff f

Jt P,'f

)

I 1k

~ g q n

P i

$ T fjI I

'f W fthm ffT ) ~>f "c~

k...,3,.)

11',f l ),fflf J

)

ff'.

kf K

f C'l Pa, f rfg fh

'xT, 1f7 i

~l f 'f f1

$ -f!.,l ilgffPI

-1) ~

ff ff f

,f t flf f f, f

':'f f

1',f

<<Wg 'W "shan

,5>

I h'~II e'

pf

'1ff(~

)"

f f I t fl g f ff f

~ P.O. BOX 529100MIAMI,FL 33152 gil4~

SIA>N FLORIDAPOWER & LIGHTCOMPANY February 11, 1982 L-82-50 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U.S.

Nuclear.; Regulatory Commission Washington, D.C.

20555 Very truly yours, e

~CQIIQg

Dear Mr. Eisenhut:

t'Eel 8 lg g~~ 82~

e~~~~

Re:

St. Lucie Unit 2 Docket No. 50-389 Construction Start-u Pro ress U date I

Attached is a report of the construction/start-up progress for St.

Lucie Unit 2 for December, 1981. If you have any questions regar-ding the attached information, or would like additional information from Florida Power 8 Light Company (FPL), please feel free to call me or Mr. W.B. Derrickson, the St. Lucie Unit 2 Pro'ject General

.Manager (305) 552-4659.

rt E. Uhrig Vice President Advanced Systems and Technology REU/RAK/mm cc:

William H. Lovelace, Office Management 8 Program Analysis U.S. Nuclear Regulatory Commission J.P. O'Reilly, Director, Region II Harold F. Reis, Esquire

'"8202i90184 8202ii PDR ADOCN 050003S'8 R

PDR~

PEOPLE... SERVING PEOPLE

FLORIDA POWER (M LIGHT COMPANY ST.

LUCIE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT

>CURRENT PERIOD:

December 1981

)SCHEDULE STATUS:

Overall Project 83.8 Construction/Start-up 80,9 Critical Path Variance

-4. 0 Target Fuel Load Date 10/28/82

)MAJOR WORK HIGHLIGHTS:

CHEDULED ACTUAL

)1.

2.

3.

4.

5.

6.

7 ~

Start Turbine on Turning Gear RCB began installation of Fuel Transfer Tube Rails RAB completed weld down of HVAC Equipment HVS-SB Began Cask Storage Mat'ormwork",

Erection of Cask Storage Crane Structural Steel Complete final alignment of the Reactor Internals Began installation of Refueling Cavity Seal Ring 12/15/81 11/03/81 11/30/81 12/11/81 01/12/82 11/30/81 12/01/81 12/16/81 12/03/81 12/01/81 12/02/81 12/03/81 12/06/81 12/07/81 BULK QUANTITY STATUS:

CURRENT TOTAL MONTH TO DATE QUANTITY QUANTITY QUANTITY 3?ERCENT 12/31/81 AVERAGE MONTHLY INSTAL. RATE (QTY/MO) 10%

90%

12/81

'TO DATE FORECASTED Concrete (cy)

Large Bore Piping (lf)

Small Bore Piping (lf)

Instrument Tubing (lf)

Large Bore Hangers (ea)

Whipping Restraints (tn)

Cable Tray (lf)

Conduit (Exp.,

Emb.<

U/D (lf)

Lighting Conduit Power Cable Pull (lf)

Control Cable Pull (Inc.

Comm. ) (lf)

Signal Cable Pull (lf)

Terms - Pwr Hi (ea)

Terms Pwr Lo (ea)

Terms - Control (ea)

Terms - Signal (ea) 136( 109 73(809 75,.733 74,397 3,125 476 38(73K 315(888 95(066 40gq 183

~

l'1'(445(636 525/343 461 7, 192 34,375 10,149 98,3 94,2 80,0 73.3 71.5 80.7 97.7 88.8

-82,2 H.,4

'66. 5 39,7 82.8 85,6 46.1 19.3 ESSENTIALLY ESSENTIALLY 2,806 6,540 154 8

ESSENTIALLY 8(078

3. (,374 6( 33.4 52 (,9.78 44(699 21 529 1,634 1,635 COMPLETE COMPLETE 3(900 4,280 100 25 COMPLETE 7 (,38Q.

2 (,260.

23(46Q 94(490 39(290 30 530 2,450 1,220 4,400 4,155 135 25 7 (7QCL 2(Q6Q 25(215 90(790 44(455 25 315 3,480 3,535 START-UP PROGRAM STATUS:

Preoperational Test Proced.

System Turnovers (PTO)

System Turnovers (CTO)

Preoperational Tests Performed SCHEDULED TO DATE 203 201 84 23 COMPLETED TO DATE 198 164*

44*

8 SCHEDULE FOR MONTH 6

42 38 7/27**

CURRENT MONTH 1

26*

30*

4/30**

TOTAL

~RE UIRED 203 272 159 203

  • NOTE:

Includes Packages in signoff circuit

    • NOTE:

Included preops in progress

~5