Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards RXE-93-003, CPSES Unit 2 Cycle 1 Core Operating Limits Rept". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20128L704  + (Forwards RW Krimm 850510 Memo Forwarding FEMA Third Interim Finding on Offsite Radiological Emergency Response Plans for Facility.Finding Re Inadequacies Will Be Provided by 850630. Continuation of Planning Efforts Requested)
  • ML20128G400  + (Forwards RW Krimm 850521 Memo Re FEMA Finding on Offsite Emergency Planning & Preparedness.Staff Will Provide Two FEMA Remedial Evaluation Repts,Referenced in Memo,To ASLB & Parties.Related Correspondence)
  • ML20129H209  + (Forwards RW Krimm 850530 Memo Re Access Control Points at King of Prussia,Pa Involving Offsite Planning & Preparedness,Rp Giordano & Jl Patten for Info.Related Correspondence)
  • ML20140B970  + (Forwards RW Krimm 860114 & 15 Memoranda Forwarding FEMA Interim Findings on Adequacy of Offsite Planning Around Artificial Island.Reasonable Assurance Provided That Plans Adequate to Protect Public Health & Safety)
  • ML20207J454  + (Forwards RW Krimm 870929 Memo Clarifying FEMA Position on Util Corrective Actions Re Emergency Preparedness for Transmittal to Licensee.Draft Transmittal Ltr Also Encl)
  • ML20154D629  + (Forwards RW Krimm 880902 Memo to NRC & RW Donovan to Rh Strome of State of Nh,Served on Svc List for Hearing. Certificate of Svc Encl)
  • ML20132C370  + (Forwards RW Krimm Forwarding Rept on 840208 Exercise of Offsite Radiological Emergency Preparedness Plans for Facility.Category B Deficiencies Identified)
  • ML20132C792  + (Forwards RW Krimm Forwarding Supplemental Info Re Offsite Arrangements for Medical Svcs for Facility.Status & Recommendations Re Offsite Emergency Medical Svcs Provided)
  • ML16341A224  + (Forwards RW Krimm Transmitting FEMA Interim Finding in State of CA Emergency Response Plan.Plan Adequate.Areas for Improvement Identified,Including Protective Action Guideline Doses)
  • ML13333A683  + (Forwards RW Krimm Transmitting FEMA Region IX Rept of 870812 Full Participation Exercise & DB Matthews 880212 Memo to RA Scarano.Concludes Reasonable Assurance Exists That Appropriate Protective Measures Implemented)
  • ML20214N460  + (Forwards RW Krimm Transmitting State of La Dept of Environ Quality Ltr Confirming Correction of Emergency Hotline Deficiency Identified During 851203 Exercise.Fema Concludes That June 1983 Approval Remains Current.W/O Encl)
  • ML20132E222  + (Forwards RW Krimm to Wj Cahill Providing FEMA Findings on Offsite Radiological Emergency Response Plans. Inadequacies in Offsite Plans Previously Identified in 850510 Third Interim Finding Corrected)
  • ML20087P133  + (Forwards RW Myers of Nj Dept of Environ Protection Addressing Effects of Plant on Cultural Resources Listed in Natl Register of Historic Places.Project Will Have No Effect on Resources in Plant Area)
  • ML19256D750  + (Forwards RW Reid 770103 Memo Re Div of Operating Reactor Review & Resolution of Discrepancy Between Reactor Coolant Pump Monitor Delay Time & Value Assumed in Util FSAR)
  • ML20052B635  + (Forwards RW Sinderman Revised Testimony on Oneill Contention IIE-4,superseding 811207 Testimony.Revised Testimony Reflects Latest Data Available Re Postulated Source Term for Accident Evaluations)
  • ML20028B198  + (Forwards RW Starostecki 821124 Memo Re Plant QA Insp)
  • ML19275A610  + (Forwards RW Starostecki W/Encl & LC Rouse W/Encl Re Amend to License SNM-1773 Concerning Spent Fuel Transportaion & Storage)
  • ML20205D641  + (Forwards RW Yourczek to Mj Leugers Transmitting Payment for Certain Costs Incurrred by Util for Production of 1988 Exercise & Other Discovery Documents to Suffolk County.Certificate of Svc Encl.Related Correspondence)
  • ML20073H568  + (Forwards RWCU Differential Flow Leak Detection Analytic Limit Improvement. Temporary Waiver of Compliance for Reactor Water Cleanup Sys Differential Flow Isolation Instrumentation Requested.Encl Withheld)
  • B13157, Forwards RWCU Valve Break Scenarios & Answers to Concerns Raised in Insp Rept 50-245/89-02.Licensee Has Reviewed Operability of High Temp Detectors to Provide Timely Detection of Small Breaks Outside Drywell  + (Forwards RWCU Valve Break Scenarios & Answers to Concerns Raised in Insp Rept 50-245/89-02.Licensee Has Reviewed Operability of High Temp Detectors to Provide Timely Detection of Small Breaks Outside Drywell)
  • ML13309A330  + (Forwards RWST Calculations Including, Evaluation of RWST for Buckling & Rev 0 to DC-3679, RWST Evaluation, in Response to NRC 920917 Telcon Request Re Util 920426 & 0626 Requests for Relief for RWST)
  • ML13309A257  + (Forwards RWST Evaluation Update Re Results of Detailed Stress Evaluation Utilizing Tank Corrosion Data)
  • ML20246B112  + (Forwards RXE-89-002, VIPRE-01 Core Thermal-Hydraulic Analysis Methods for Comanche Peak Steam Electric Station Licensing Applications, to Satisfy Model Documentation & User Qualification Requirements)
  • TXX-9105, Forwards RXE-91-001, Transient Analysis Methods for Comanche Peak Steam Electric Station Licensing Applications. Util Will Employ Methods to Analyze non-LOCA Described in Chapter 15 of FSAR  + (Forwards RXE-91-001, Transient Analysis Methods for Comanche Peak Steam Electric Station Licensing Applications. Util Will Employ Methods to Analyze non-LOCA Described in Chapter 15 of FSAR)
  • ML20073Q826  + (Forwards RXE-91-004, Small Break LOCA Analysis Methodology. Rept Presents Methodology to Be Utilized in Support of Reload Design,Licensing & Operation of Facilities)
  • ML20148E654  + (Forwards RXE-96-001,Rev 2 to CPSES Unit 2 Cycle 3 Colr)
  • ML20148E657  + (Forwards RXE-96-001,Rev 2 to CPSES Unit 2 Cycle 3 Colr.)
  • ML20033A296  + (Forwards Ra-222 Monthly Rept for Oct 1981)
  • ML20058A876  + (Forwards Ra-222 Rept for May 1982)
  • ML20011B050  + (Forwards Ra-222 Rept for Sept 1981)
  • ML20009C838  + (Forwards Ra-222 Results for Apr 1981)
  • ML20234E472  + (Forwards Rac Responses to NRC Comments on Green River Preliminary Design Documents.Tac Will Provide Parts or All of Responses for Comments GW/1,GW/3 & GW/4.TAC Infiltration Study Results for Cover Matl Needed for Comment GW/4)
  • ML20234D954  + (Forwards Rac Responses to NRC Comments on Phase II Preliminary Design Documents Re Umtrap in Grand Junction.Nrc Comments Encl)
  • ML20154C027  + (Forwards Race Code Methodology & Verification, Per NRC 880512 Request for Addl Info.Consideration of Uncertainties for Input Variables to Code Correlation Described in Encl Necessitates Change in Tech Spec Change Request 166)
  • ML20235E594  + (Forwards Radial Peak Factor Limit for Cycle 3,per Tech Spec 6.9.1.9.End-of Cycle 2 Refueling Outage Scheduled for 871002 W/Cycle 3 Initial Criticality Scheduled for 871201)
  • ML20100Q324  + (Forwards Radial Peaking Factor Limit Rept & K(Z) Curve for Cycle 5,per Tech Specs 6.9.1.14)
  • ML20235V845  + (Forwards Radial Peaking Factor Limit Rept for Cycle 2 Per Tech Spec 6.9.1.9.Functions to Be Used for RAOC & Base Load Operation Included.Refueling Outage Scheduled for 871218 & Criticality Scheduled for 870227)
  • ML20073T155  + (Forwards Radial Peaking Factor Limit Rept,In Response to RO 369/83-11 Re Removal of Burnable Poison Rod Assemblies. Requirement to Submit Rept 60 Days Prior to Effective Date of Limits Does Not Apply)
  • ML20239A384  + (Forwards Radial Peaking Factor Limit Rept for Cycle 6,in Accordance W/Tech Spec Paragraph 6.9.1.11.Elevation Dependent Peaking Factor Vs Core Height Graph for Cycle 6 Also Encl in Support of Rept)
  • ML20114C164  + (Forwards Radial Peaking Factor Limit Rept for Cycle 12. Graph Illustrating Elevation Dependent Peaking Factor Vs Core Height for Cycle 12 Also Encl)
  • ML20093J638  + (Forwards Radial Peaking Factor Limit Rept for Cycle 1,per Tech Spec 6.9.1.9)
  • ML20150B073  + (Forwards Radial Peaking Factor Limit Rept for Cycle 9,per Tech Spec 6.9.1.11.Elevation Dependent Peaking Factor Vs Core Height Graph for Cycle 9 Also Encl)
  • ML20059M160  + (Forwards Radial Peaking Factor Limit Rept for Cycle 8 of Facility.Current Issue Re Power Distribution Assumed in ECCS Evaluation Model Analyses Performed to Demonstrate Compliance W/Requirements of 10CFR50.46)
  • ML20006D880  + (Forwards Radial Peaking Factor Limit Rept for Cycle 4, Per Tech Spec 6.9.1.14)
  • ML20236C964  + (Forwards Radial Peaking Factor Limit Rept for Facility Cycle 4.Cycle 4 Initial Criticality Took Place on 890203)
  • ML20092M954  + (Forwards Radial Peaking Factor Limit Rept for Cycle 9 & Elevation Dependent Peaking Factor Versus Core Height Graph)
  • ML20069D219  + (Forwards Radial Peaking Factor Limit Rept for Cycle 13 of Jm Farley Unit 1.Copy of Elevation Dependent Peaking Factor Vs Core Height Graph for Cycle 13 of Unit 1 Also Encl,In Support of Subj Rept)
  • ML20041F943  + (Forwards Radial Peaking Factor Limit Rept for Cycle 3, Per Section 6.9.1.10 of Proposed Tech Spec Change Request 66)
  • ML18101A420  + (Forwards Radial Peaking Factor Limit Rept,Salem Unit 2, Cycle 9. Rept Includes Radial Peaking Factor Limits for Rated Thermal Power for Core Planes Containing Bank D Control Rods & Unrodded Core Planes)
  • ML18101A421  + (Forwards Radial Peaking Factor Limit Rept,Salem Unit 2, Cycle 9. Rept Includes Radial Peaking Factor Limits for Rated Thermal Power for Core Planes Containing Bank D Control Rods & Unrodded Core Planes)