Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19291B178 + (Forwards Progress Rept,Prepared by Thorne Ecological Inst, for Ecological Monitoring Program for Period 790101-0630)
- ML17347A260 + (Forwards Progress Summary of Phase II Select Sys Assessment for Dec 1986,for Info.Mods to Auxiliary Feedwater Control Panel Wiring & Steam Trap Drains Completed)
- ML17347A956 + (Forwards Progress Summary of Select Sys Assessment for Jan 1989,per NRC 860812 Order)
- L-90-179, Forwards Progress Summary of Select Sys Assessment for Apr 1990,per NRC 860812 order.Outage-related Mods Include Replacement of RHR Valve 887 & Completion of Installation of Redundant Air Start Motors on Emergency Diesel Generators + (Forwards Progress Summary of Select Sys Assessment for Apr 1990,per NRC 860812 order.Outage-related Mods Include Replacement of RHR Valve 887 & Completion of Installation of Redundant Air Start Motors on Emergency Diesel Generators)
- L-86-335, Forwards Progress Summary of Select Sys Assessment for Jul 1986 + (Forwards Progress Summary of Select Sys Assessment for Jul 1986)
- ML20148R712 + (Forwards Progress Toward Restart Readiness at Millstone Station. Rept Provides More Detailed Info Re Status of Restart Issues & Measures Used to Monitor Performance)
- B17622, Forwards Progress Toward Restart Readiness at Millstone Unit 2 - Nu Briefing for Nrc. Rept Reflects Util Assessment of Readiness to Resume Safe Power Operations,Performance Measures & Activities Which Support Recovery of Mnps Units + (Forwards Progress Toward Restart Readiness at Millstone Unit 2 - Nu Briefing for Nrc. Rept Reflects Util Assessment of Readiness to Resume Safe Power Operations,Performance Measures & Activities Which Support Recovery of Mnps Units)
- ML20030D426 + (Forwards Progress Update of Actual Dates & Status of Activities at Facility Re Const/Fuel Load Schedule.Project Considered 96% Complete as of 810728)
- ML20236S688 + (Forwards Progress Update on Equipment Installation,Including Clarification of Util Position on Separation Criteria & SPDS for Each Position,Per Rev 2 to Reg Guide 1.97)
- ML13330B195 + (Forwards Progress on Selected Regulatory Projects,San Onofre Unit 1,Edition 18, Monthly Progress Rept.Continuing Need for Monthly Repts Not Apparent,Per Author to NRC)
- ML20148P489 + (Forwards Progress rept(780401-780731)on Proj Validation of Nuc Fuel Cycle Facil Dose Assessment Models.)
- ML20028F717 + (Forwards Project & Budget Proposal for NRC Work: Equipment Qualification Research Program)
- ML20199F674 + (Forwards Project & Budget Proposal for NRC Work: Fuel Operating Experience Evaluation Program V, in Response to Rj Mattson)
- ML20153F104 + (Forwards Project & Budget Proposal for NRC Work: Team Insp for Operational Readiness - Palo Verde,Unit 3. Approval by Lll Mgt Will Be Requested If Proposal Meets NRC Approval)
- ML20153F022 + (Forwards Project & Budget Proposal for NRC Work: Team Insp for Operational Readiness - Palo Verde,Unit 3, for Approval or Disapproval.Reason for Disapproval Requested)
- ML20199F624 + (Forwards Project & Budget Proposal for NRC Work for FIN B-2533, Review of High Burnup Licensing Topical Repts in Response to Rj Mattson)
- ML20153E964 + (Forwards Project & Budget Proposal for NRC Work (FIN A-0754), Insp of Operating Reactors During Major Outages - San Onofre Unit 1)
- ML20138C182 + (Forwards Project & Budget Proposals for NRC Work for Rev 1 to, Evaluation of Selected NRC Open Items Before Plant Fuel Load & Evaluation of Selected Open NRC Activities at Near-Term OL Sites Needing Action..)
- ML20129E491 + (Forwards Project Completion Addendum to 831107 Rept Re Replacement of Main Recirculation & Attached Sys Piping During 1984 Maint/Refueling Outage)
- ML20054G545 + (Forwards Project Completion Rept for Remedial Action at Salt Lake County Fire Station 1 & Harmony Park)
- ML19329B789 + (Forwards Project Critique,Phase 3)
- ML19312C732 + (Forwards Project Deadlines for Receiving Consultant Repts)
- ML19312C546 + (Forwards Project Deadlines for Receiving Repts Re Review of CP Applications)
- PLA-1039, Forwards Project Description for Independent Design Review of safety-related Piping Sys.Limits & Scope of Review & Means of Disseminating Basic Design Info Defined + (Forwards Project Description for Independent Design Review of safety-related Piping Sys.Limits & Scope of Review & Means of Disseminating Basic Design Info Defined)
- ML20138C059 + (Forwards Project Descriptive Summary for FIN A-6819, Evaluation of Selected NRC Open Items Before Fuel Load (Program 1), Statement of Work & NRC Form 173,for Review & Approval)
- ML20054H475 + (Forwards Project Descriptive Summary, Stenographic Reporting Svcs)
- ML20127E418 + (Forwards Project Descriptive Summary,Draft Statement of Work & Interofc Concurrences for, Safety Evaluation of Core Melt Accidents:Casework Reviews for Limerick,Gessar & Fnp)
- ML20127E379 + (Forwards Project Descriptive Summary,Draft Statement of Work & Interofc Concurrences from Res,Nmss,Ie,Aeod & Region IV for Safety Evaluation of Core Melt Accidents:Casework Reviews for Limerick,Gessar & Fnp)
- ML20238A232 + (Forwards Project Directorate II-1 Comments on Insp Manual Chapters 0030,0040 & 0045)
- ML20148J553 + (Forwards Project Directorate III Slides for Briefing of Executive Team Tentatively Scheduled for 880317.Primary Slides to Be Shown Marked P.Other Slides Backup for Possible Ref.W/O Encl)
- ML20148A757 + (Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref)
- ML19242D749 + (Forwards Project Examination of Concrete Samples from Reactor Containment Bldg Base Mat Ks, Performed by Army Corps of Engineers)
- ML20126D718 + (Forwards Project Identification Summary Sheets for FIN A-6819, Resolution of Waterford 3 QC Allegations, to Transfer Funds to FIN A-6821, Evaluation of Selected Open NRC Activities at Waterford 3 Site Needing Action.)
- ML20209D342 + (Forwards Project Identification Summary Sheets Outlining Two Addl Tasks for Review of Seismic Design Licensing Condition. Response Re Adequacy of Funding Requested.Meeting W/Usgs in Early Oct Suggested.Tasks Should Be in Place by 850101)
- ML20126E041 + (Forwards Project Identification Summary Sheets for FIN A-6819 Re Resolution of QC Allegations by Inel.Funding Requested.Urgency of Work Cited,Per EDO 840312 Memo)
- ML20237A285 + (Forwards Project Interface Document (PID) 14-S-20,revising Subcontract Drawing MAY-PS-10-0230,to Show All Temporary & Permanent Fencing & Adding Temporary Fence on East Side of Disposal Cell,For Maybell,Co Umtra Site)
- ML20197C185 + (Forwards Project Interface Document (PID) 14-S-21 for Maybell,Co Umtra Site for NRC Info)
- ML20217R348 + (Forwards Project Interface Document (PID) 14-S-12 for Maybell,Co,Umtra Site.Pid 14-S-12 Has Been Designated Class II Change,As It Does Not Significantly Alter Any Critical Cell Design or Affect Long Term Stability)
- ML20203C887 + (Forwards Project Interface Document (PID) 14-S-13 for Maybell,Colorado,Umtra Site.Pid Revises Specification Section 02228,to Clarify Requirements for Gradation Tests for Radon Barrier Matl)
- ML20127D133 + (Forwards Project Interface Document (PID) 08-S-06 for Gunnison,Co,U Mill Tailings Remedial Action Site,Revising Several Specifications in Order to Ensure Adequate Subcontractor Performance)
- ML20148D141 + (Forwards Project Interface Document (PID) 14-S-11,revising Subcontract Documents as Listed)
- ML20059B355 + (Forwards Project Interface Document (PID) 20-S-16 for Falls City,Tx U Mill Tailings Site.Pid Addresses Track Walking Requirements for Tailings Embankment & Apron Areas & Unnecessary Constructability Difficulties Incurred)
- ML20058M561 + (Forwards Project Interface Document (PID) 09-S-18 for Mexican Hat,Ut,Umtra Disposal Site.Project Interface Document Necessary Due to Uncertainties Re Amount of Larger Size Matl in Bluff Gravel Borrow Source)
- ML20154N145 + (Forwards Project Interface Document (PID) 14-S-22 for Maybell,Co,Umtra Site.Listed Drawings Have Been Revised. Notes Should Be Added to Appropriate Drawings to Allow Acceptance of Minor Changes.Calculations Encl)
- ML20057D878 + (Forwards Project Interface Document (PID) PID 06-S-030.PID Class II Change Revising Spec Section 02200,Article 2.1.E.2.a in Vol III of Remedial Action Plan for Stabilization of Inactive U Mill Tailings Site at Rifle,Co)
- ML20197D920 + (Forwards Project Interface Document (PID) 18-S-14 Re Tuba City,Az Site,For Into.Pid Resulted from long-term Surveillance & Maint Requirements)
- ML20196E304 + (Forwards Project Interface Document (PID) 14-S-14 for Maybell,Co,U Mill Tailings Remedial Action Site for NRC Review & Approval)
- ML20059B377 + (Forwards Project Interface Document (PID) 06-S-022,revising Paragraph SC-12,subcontractor Labor & Equipment Rates,Of Section 00800, Special Conditions in Vol III of Remedial Action Plan For...Inactive U Mill...Site at Rifle,Co)
- ML20134N876 + (Forwards Project Interface Document (PID) 16-S-36 & Specification Section 02850 for Ambrosia Lake,Nm,U Mill Tailings Remedial Action Disposal Site)
- ML20056E156 + (Forwards Project Interface Document (PID) 20-S-15 for Umtra Project Ofc Falls City,Tx,Site.Pid Classfied as Class I Change & as Such Umtra Project Ofc Hereby Requests NRC Evaluation & Formal Concurrence)
- ML20245L382 + (Forwards Project Interface Document (PID) 8-S-08 Re Tuba City Phase II Const.Pid Considered to Be Class III Change Per Section 8.11 of Remedial Action Plan)