O O

s n

  • FAC IDA POWER & LIGHT COMPANY 40

'32

.AUG 1 9 E L-86-335 f

Dr. 3. Nelson Grace Regional Administrator, Region II U. S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, N. W.

Atlanta, Georgia 30323

Dear Dr. Grace:

RE: TURKEY POINT UNIT 3 & 4 DOCKET NOS. 50-250,50-251 SELECT SYSTEM ASSESSMENT PROGRESS

SUMMARY

Attached, please find the July 1986 progress summary of the Select System l

Assessment.

If you have any questions regarding this information, please contact us.

Very,truly yours, f* S l

C. G. Woody

/

Gro*.p Vice President Nuce. ear Energy CC[#/SAV/aa

~

e l

atOchment i

cci Harold F. Reis, Esquire PNS-LI-86-208 l

l I

1

.. B

[

.y sy,. - - -

,,,....c l

[

[

Ef,MEiE.GICH 8 omCIALCOW Ll:1 j

8611105400 860819 f

8 PDR ADOCK 05000250 P

PDR PEOPLE.. SERVING PEOPLE

F r SELECT SYSTEM ASSESSMENT JULY 1986 PROGRESS Reconstitution of Design Basis Development, review and concurrence of draf t reconstituted design basis continues on schedule. A total of 24,599 man-hours have been expended on the reconstitution of design basis effort.

Walkdowns Compilation, evaluation and correction to walkdown discrepancies continues. A total of 17,983 man-hours have been expended on the walkdown effort.

Configuration Management Evaluation of procedures and other organizational responsibilities continues. A total of 276 man-hours have been expended on the configuration management effort.

Punch List A total of 33,923 man-hours have been expended on punch list items. Significant items completed during this period by system, are listed below:

o Auxiliary Feedwater System

-Enhanced access to system Instrument Air Valves implemented.

-Installed local flow indication for Standby Steam Generator Feedwater Pump (SSGF WP).

-Revised procedure to minimize potential for steam binding of system pumps.

-Initiated construction on U-3 AFW valve access platform.

-Emergency lighting added.

-Additional system communications implemented.

-AFW stop check valve modifications complete on U-4.

-Steam vent modifications complete.

-Replaced U-4 flow transmitters.

I o Emergency Filters

-Initiated engineering efforts on open items where appropriate.

-Evaluated missing specimen canisters for 10 CFR Part 21 reportability.

t o Emergency Containment Coolers j

-Initiated engineering efforts on open items where appropriate.

I o Emergency Power

-Initiated engineering efforts on open items where appropriate.

i

-Performed EDG load study.

-Implemented system modifications in accordance with load study.

o Containment Isolation

-Initiated engineering efforts on open items where appropriate.

l o Containment Spray

-Initiated engineering efforts on open items where appropriate.

L4:1

F o Residual Heat Removal

-Initiated engineering efforts on open items where appropriate.

-Responded to concerns / discrepancies / corrective actions on RHR room cleanliness.

-Implemented RHR procedure revisions.

-Implemented App. R valve operator modifications on U-4.

-Implemented RHR drawing revisions.

-Evaluated and implemented corrective action to monitor pump seal water sufficiency.

-Implemented revision to alternate hot leg injection EOP.

-Closed out various maintenance items.

o Main Steam Isolation

-Initiated engineering efforts on open items where appropriate.

-Closed out various maintenance items.

o Intake Cooling Water

-Initiated engineering efforts on open items where appropriate.

-Evaluated check valve dampener subsystem for 10 CFR Part 21 reportability.

-Implemented procedure revisions.

-Closed out various maintenance and walkdown NCR items.

o Component Cooling Water

-Initiated engineering efforts on open items where appropriate.

-Closed out various maintenance items.

-Implemented corrective action to reduce leakage.

o Reactor Protection System

-Initiated engineering efforts on open items where appropriate.

-Closed out various maintenance items.

o Safety Injection System

-Initiated engineering efforts on open items where appropriate.

-Implemented procedure revisions.

-Closed out various maintenance items.

o Vital Power

-Initiated engineering efforts on open items where appropriate.

-Closed out various maintenance items.

o Chemical and Volume Control

-Initiated engineering efforts on open items where appropriate.

-C.losed out various maintenance items.

o Instrument Air

-Initiated engineering efforts on open items where appropriate.

-Closed out various maintenance items.

L4:1

-