ML17347A956
| ML17347A956 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/03/1989 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-89-42, NUDOCS 8902140008 | |
| Download: ML17347A956 (4) | |
Text
gCCE~RATED DIP.BUTJOY DEMO4 STRIDOR SYSTEM I
i7 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8902140008 DOC.DATE: 89/02/03 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards progress summary of select sys assessment for Jan 1989.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:
DOCKET g 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB NU CT G FILE 0
EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DE ST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 2
2 1
1 1
1 1
1 1
1 1
0 1
1 D
8 NOTE 'IO ALL "RIDS" RECIPIENIS'LEASE HELP Us 'rO REDUCE VASTE!
CONrACr mE DOCUMEVr CONSOL DESK, ROOM Pl-37 (EXT. 20079)
TO ELIKENLTE YOUR NAME F5'ISTRIKTZZGN LISTS FOR DOCUK2US YOU DOIN'T NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 16
et E4
P.O. Box14000, Juno Beach, FL 33408-0420 FEBRUARY.
3 1989 L-89-42 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the January 1989 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, W.
Con y
Senior Vice President Nuclear WFC/TCG/gp Attachment cc:
Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant q9O+gg()OOS
'PDP ADQCK
.R S902O3 OSOOO25O PDC p@Dl an FPL Group company
SELECT SYSTEM REVIBM JANUARY 1989 PROCRBSS Desi Basis Reconstitution Design Basis Verification activities for the original fifteen select systems continues in accordance with the Integrated Schedule.
Completion of this activity is scheduled for May 8, 1989.
Design Basis Verification activities for Area Radiation Monitoring System (ARMS), Process Radiation Monitoring System (PRMS) and normal containment cooling systems will proceed in accordance with the Integrated Schedule.
Completion of this activity is scheduled for June 1, 1989.
Walkdowns Small Bore Piping and Tubing (ARMS, PRMS and normal containment cooling systems)
Unit 3,
4 and Common area outside Containment in progress in accordance 'ith the Integrated Schedule for completion by February 28, 1989.
P a ID (ARMS, PRMS and normal containment cooling systems)
Unit 3
inside Containment wi.ll be performed during the next Unit 3
refueling outage in accordance with the Integrat'ed Schedule.