REGULATORY I'NATION DISTRIBUTION SYS (R IDS)
ACCESSION NBR: $702090211 DOC. DATE'7/02/03 NOTARIZED:
NO DOCKET FACIL:50-250 Tuv keg Point Plant>
Unit 3i Florida Poeer and Light C
05000250 50-251 Tuv keg Point Planti Unit 4i Flov ida Power and Light C 05000251 AUTH. NAl!JE AUTHOR AFFILIATION WOODY> C. O.
Fl ov ida Pover Sc Lig ht Co.
RECIP. NANE RECIPIENT AFFILIATION Document Contv'ol Branch (Document" Control Desk)
SUBJECT:
Forwards pv ogress summary of Phase II select sMs assessment fov Dec 198hi for info. Nods to auxiliary feed@tater control panel miring Sc steam tv ap drains completed.
DISTRIBUTlON CODE:
A001D COPIES RECEIVED: LTR ENCL SI ZE:
TITLE:
OR Submittal:
Qenev al Distv ibution NOTES:
RECIPIENT ID CODE/NAl'IE PWR-A EB PWR-A FOB PWR-A PD2 PD 01 PWR-A PSB INTERNAL: ADN/LFt1B NR SCB R
FL 04 COPIES LTTR ENCL 1
1 1
5 5
1 1
0 1
1 REC IP IENT ID CODE/NANE, PWR-A EICSB PWR-A PD2 LA NcDONALDi D PWR-A RSB ELD/HDS4 NRR/GRAS COP 1ES LTTR ENCL 2
2.
0 1
1 1
1 1
0 1
0 EXTERNAL:
EQ8(Q BRUSNEi S NRC PDR 02 1
1 1
LPDR NSIC 03 05 1
1 1
C TOTAL NUBBER OF COPIES REQUIRED:
LTTR 22 ENCL 18
Wo (Q,tf ill g,'
Q f... l*
fff ) '
I"f> t1 i )II/
E]
k,Jl
. "f f
~
f
~
,E fj ff, pl 4
I"( $ 3 f ff f ). ff f
f, I
4iki4 f1
'llI j
l k
c';)<! <
k' i
If l
~a.~,
~ ~,'J'l) gl ff I
~ l~ "~"'fry a
1 f /f43 "0
J i, if 1
<,ll",,i 5fff l.f
\\
f"f'~A-' '.0 s 5 f
I+,
r l ff 8'0 I
)
Pm ff. 3
""g)'C
~
III l
,~.i l 1'
8f 4, "~f ~
~l g )',1 3
ff I
'<<.2 i"
~l.f ff "I ff>st
~l i"'
Cj
'<<)lf l) q' ff f
P. O. BOX 0, JUNO BEACH, FL 33408-0420
>yOIAz~
FEBRUARY 3 1987 L-87-44 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Select S stem Assessment Pro ress Summar The December l 986 progress summary of the Phase II Select System Assessment is attached for the information of the Region II Staff.
Should there be any questions on this information, please contact us.
Very truly yours,
.O. Wo
~
~
Group e President Nuclear Energy COW/PLP/gp Attachment cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident, USNRC, Turkey Point Plant 8702090211 870203 PDR ADOCK 05000250,
- P PDRQ PLP I /025/I an FPL Group company
~
~
Ih W
W W
W
~
SELECT SYSTEM ASSESSMENT DECEMBER 1986 PROGRESS Reconstitution of Desi n Basis juno Plant Engineering task force comments on the draft versions of the reconstituted design bases were received and incorporated where appropriate.
Reissuance of the reconstituted design bases for formal JPE review occurred December 14th.
Preparation and issuance of the Chemical and 'Volume Control System (Emergency Boration) draft reconstituted design basis continues on schedule for a 2/2/87 issue.
Note the change from 2/I/87 which is a Sunday.
Walkdowns One hundred of three hundred and six small bore piping and tubing walkdowns are complete.
Eighty-nine of one hundred and eighty breaker list walkdowns are complete.
Ninety-nine of one hundred and fifty-one P8 ID walkdowns are complete.
SEG Com rehensive Review The SEG Phase II report was issued for review and comment on December I,
1986.
Coments were received and incorporated as appropriate.
The final report was issued on December 22, 1986.
Each open item identified will be pursued to resolution as appropriate.
Other Si nificant Pro ress Completed modifications to AFW steam trap drains.
Completed AFW control panel wiring modifications.
Completed modifications to AFW trip and throttle valve position indication.
Revised procedure on Emergency Filters.