Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Preliminary Control Room Human Engineering Design Rept.". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20055C861  + (Forwards Preliminary Case Study Rept:Solenoid Valve Problems at Us Lwrs, for Review & Comments.Response Requested within 30 Days from Receipt of Rept)
  • ML20043H181  + (Forwards Preliminary Case Study Rept:Solenoid Valve Problems at Us Lwrs. Study Focuses Upon Vulnerability of safety-related Equipment to Common Mode Failures or Degradations of Solenoid Operated Valves.Comments Welcome)
  • ML20210R450  + (Forwards Preliminary Case Study on Review of motor-operated Valve Performance in Lwrs.Rept Concluded That Current Methods & Procedures at Many Operating Plants Inadequate to Assure Valves Will Operate When Needed.W/O Encl)
  • ML20210R544  + (Forwards Preliminary Case Study on Review of motor-operated Valve Performance in LWRs for Peer Review.Current Valve Testing Program Inadequate to Assure Valve Reliability. Request Comments within 30 Days.W/O Encl)
  • ML20197G954  + (Forwards Preliminary Case Study on Review of motor-operated Valve Performance in LWRs for Peer Review.Current Valve Testing Program Inadequate to Assure Valve Reliability. Requests Comments within 30 Days.W/O Encl)
  • ML20197G951  + (Forwards Preliminary Case Study on Review of motor-operated Valve Performance in LWRs for Peer Review.Current Valve Testing Program Inadequate to Assure Valve Reliability. Requests Comments within 30 Days.W/O Encl)
  • ML20148B080  + (Forwards Preliminary Chart on Results of Land Use Survey Completed Last Year Re Bldg & Housing Trends in Midland County 1969-1977)
  • ML16341C120  + (Forwards Preliminary Comments & Questions Derived from Review of Draft Insp Rept 83-37.Comments Welcomed)
  • ML19210A924  + (Forwards Preliminary Comments & Questions Re Review of App 5A Summary of Aircraft Impact Design, Vol 2,FSAR)
  • ML20214K715  + (Forwards Preliminary Comments Re Grand Junction Draft Remedial Action Plan)
  • ML20151S065  + (Forwards Preliminary Comments on Chem-Nuclear Sys,Inc Three Topical Repts on Solidification of Low Level Radwaste. Advantages of NDT of Waste Forms Over Current Compressive Strength Testing Addressed)
  • ML20210D403  + (Forwards Preliminary Comments on Comanche Peak Response Team Program Plan & Recommends Series of Working Meetings Arranged W/Various Technical Groups Prior to Meeting W/Mgt to Clarify Plan Approach to Resolution of Issues)
  • ML19338F046  + (Forwards Preliminary Comments on Draft NUREG/CR-1580, Human Engineering Guide to Control Room Evaluation)
  • ML19338F043  + (Forwards Preliminary Comments on Draft NUREG/CR-1580)
  • ML19225C871  + (Forwards Preliminary Comments on Jcp & L Application for CP)
  • ML20210R211  + (Forwards Preliminary Comments on May 1986 Draft Sser 13, Sections 1 & 3.Sentence on Pages 1-4,1-7,3-1 & 3-5 Most Appropriately Worded on Page 1-7.Last Word in Paragraph on Page 1-6 Re Generic Implications Should Be Deficiencies)
  • ML20039C732  + (Forwards Preliminary Comments on NUREG-0801,re Evaluation Criteria for Detailed Control Room Design Review.Addl Time Requested for Further Study & Formulation of Comments)
  • ML20058J238  + (Forwards Preliminary Comments on SEP Topics VI-2.D, Mass & Energy Release for Possible Pipe Break Inside Containment & VI-3, Containment Pressure & Heat Removal Capability, Per NRC 820610 Draft Evaluation)
  • ML20056D943  + (Forwards Preliminary Comments on TS Sys 80+ (Chapter 16 CESSAR-DC) Submitted in App K.Status Sheet Also Encl)
  • ML20127D988  + (Forwards Preliminary Comments on Topical Rept for High Integrity Container for Disposal of Low Level Radwastes, Submitted by Chichibu Cement Co,Ltd.Revised Nonproprietary Version of Topical Rept Encl.W/O Rept)
  • ML20207A951  + (Forwards Preliminary Comments on Util 851209 Offsite Dose Calculation Manual.Comments Should Be Reviewed Prior to Planned 861107 Telcon)
  • ML18068A442  + (Forwards Preliminary Comments to Palisades Section 3.7 as Provided to Licensee.Staff Review of Comments Not Completed. Comments Provided to Licensee for Purpose of Opening Discussions Which May Result in Comments Being Revised)
  • ML20206E342  + (Forwards Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept Re Review of Util 850401 Response to Generic Ltr 82-33.Response Requested within 60 Days of Ltr Receipt)
  • W3P81-1102, Forwards Preliminary Control Room Assessment  + (Forwards Preliminary Control Room Assessment)
  • ML17276B010  + (Forwards Preliminary Control Room Human Engineering Design Rept)
  • ML17276B012  + (Forwards Preliminary Control Room Human Engineering Design Rept.)
  • ML20236E186  + (Forwards Preliminary Copies of Element Repts,Corresponding Corrective Action Plans,Corrective Action Verification Closeout Checklists & Bechtel Trip Rept Re Facility Element Rept 224.5)
  • ML18092A227  + (Forwards Preliminary Copy of Auxiliary Bldg Charging Pump Area Sprinkler Sys Layout Drawing.Sys Will Be Installed Per NFPA 13 for Ordinary Hazard Occupancy.Ea Liden 840405 Ltr Re Fire Protection Features Encl)
  • ML18092A226  + (Forwards Preliminary Copy of Auxiliary Bldg Charging Pump Area Sprinkler Sys Layout Drawing.Sys Will Be Installed Per NFPA 13 for Ordinary Hazard Occupancy.Ea Liden Re Fire Protection Features Encl)
  • ML19345H575  + (Forwards Preliminary Copy of Egg 1183-4181,Revision 1 by Jh Cooper,Apr 1981 & Egg 1183-4202 by B Kountanis,Apr 1981)
  • ML20129K393  + (Forwards Preliminary Copy of GL Label Until Engineering Drawing Detailing Dimensions & Other Info About Label Has Been Received,Per 960715 Telcon)
  • ML20055H957  + (Forwards Preliminary Cost Estimate for Decommissioning Reactor.Cost Estimate Based on Methods Described in May 1989 NRC Draft Reg Guide on Assuring Availability of Funds for Decommissioning Nuclear Reactors)
  • ML19211C934  + (Forwards Preliminary Criteria for Emergency Planning Re Nuclear Facilities W/Potential for Groundwater contamination.NUREG-0440 & Lg Hulman 790703 Memo Encl.W/O Encl)
  • ML20197H363  + (Forwards Preliminary DC motor-actuator Test Data,Per Request.Attachment Also Includes Descriptive Info Two motor-actuators That Were Tested at Ineel & Identifies Issues Being Addressed by Tests)
  • ML19208B239  + (Forwards Preliminary Data Re Mgt & Technical Resources Available to Handle TMI-type Event,In Response to NRC 790730 Request)
  • ML19208B240  + (Forwards Preliminary Data Re Mgt & Technical Resources Available to Handle TMI-type Event,In Response to NRC 790730 Request)
  • ML19220C522  + (Forwards Preliminary Data Re Primary Coolant Sample at TMI Taken on 790410)
  • ML20198T506  + (Forwards Preliminary Data from Friction Tests of Aged Stellite 6 Specimens)
  • ML19309E949  + (Forwards Preliminary Data from Offsite Emergency Radiological Environ Monitoring Program Consisting of Program Summary & Status for Wk of 800328-0403)
  • ML17310A442  + (Forwards Preliminary Data from SG Tube Rupture Investigation Consisting of Computer Graphic Re Tubes Examined Outside Arc & Table Listing Info Re SG 22)
  • ML17310A367  + (Forwards Preliminary Data from SG Tube Rupture Investigation.Bend Areas Outside Arc Due to Bobbin Indication or Random Mrpc Sampling)
  • AECM-85-0212, Forwards Preliminary Data in Support of NRC Review of Safety Relief Valve in-plant Test Plan,Per 850626 Telcon.Addl Tests Unnecessary  + (Forwards Preliminary Data in Support of NRC Review of Safety Relief Valve in-plant Test Plan,Per 850626 Telcon.Addl Tests Unnecessary)
  • ML20246F222  + (Forwards Preliminary Decommissioning Plan for Fort St Vrain Nuclear Generating Station. Application for License Amend Submitted to Include License Condition on Early Shutdown So Reactor Will Not Operate Above 2% Power After 900630)
  • ML13319B042  + (Forwards Preliminary Decommissioning Plan for San Onofre Nuclear Generating Station Unit 1)
  • ML17333A040  + (Forwards Preliminary Deficiency Rept Re Partially Installed, Factory Repaired Class IE,600 Volt,Power Cable)
  • ML20197E273  + (Forwards Preliminary Des for Power Plant.Requires Comments by 790831.W/o Encl)
  • ML19319A992  + (Forwards Preliminary Des.Requests Review & Comments by 711122.W/o Encl)
  • ML17318A590  + (Forwards Preliminary Description of Conceptual Plant Mods Required for post-accident Sampling,Per NUREG-0578,Item 2.1.8.a)
  • NPL-97-0252, Forwards Preliminary Description of Corrective Actions Re Plant App R Safe Shutdown Analysis.Corrective Actions Proposed on Attachment Strictly Preliminary & Have Not Had Benefit of Manager Supervisory Staff Review  + (Forwards Preliminary Description of Corrective Actions Re Plant App R Safe Shutdown Analysis.Corrective Actions Proposed on Attachment Strictly Preliminary & Have Not Had Benefit of Manager Supervisory Staff Review)
  • ML19224A788  + (Forwards Preliminary Description of Events at TMI-2 Facility Accident & Generic Considerations of TMI-2 Incident as Background Info for 790410 Senate Hearing)
  • ML20154A391  + (Forwards Preliminary Description on Sequence of Events, Troubleshooting & Conclusions Re MSIV Slow Closure Problem. Rept Required by 871109 Confirmatory Action Ltr Will Be Provided by 871204)