ML20055H957

From kanterella
Jump to navigation Jump to search
Forwards Preliminary Cost Estimate for Decommissioning Reactor.Cost Estimate Based on Methods Described in May 1989 NRC Draft Reg Guide on Assuring Availability of Funds for Decommissioning Nuclear Reactors
ML20055H957
Person / Time
Site: Kansas State University
Issue date: 07/17/1990
From: Coffman J
KANSAS STATE UNIV., MANHATTAN, KS
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9007310200
Download: ML20055H957 (2)


Text

.. . - - .-. -. . - , _ _ - _ _ --

1

. . i KSU Office of the Provost T$@30W35 -

i

,1 m Anderson Hall n 2 S ic m N g '3$$$d*""

uwayamstry M ,

July 17, 1990 -

United States :4uclear l Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 RE: License R-88 Docket 50-188 -

Dear Sirs:

This concerns the ultimate decommissioning of the Kansas State University TRIGA Nuclear Reactor Facility, currently licensed for operation by the University until August 15, 2001. Pursuant to Federal Regulations, Title 10, Part 50, this is to assure that the University, an entity of the State of Kansas, will obtain the funds for decommissioning-when necessary.

It is our intention, at the appropriate time, to request an I

extension of the Reactor Facility operating license beyond the August 2001 termination of the current license. Never-theless, whenever a decision is reached to decommission the facility, the University will request legislative appropri-ation of funds, or otherwise provide funds sufficiently in advance of decommissioning to prevent delay of required activities.

Enclosed is a preliminary cost estimate for decommissioning of the Reactor Facility. The cost estimate was prepared on the basis of the methods described in the May 1989 Nuclear Regulatory Commission Draft Regulatory Guide on " Assuring the Availability of Funds for Decommissioning Nuclear Reac-tors." Cost escalation f actors other than thoss prescribed in publications cited by the Guide cla beaed on U.S.

Department of Labor statistics.

With assurance that I have the authority to sign this statement of intent, I am Yours truly, A r, a es R. Coffm ovost Encl.

,p\'\

9007310200 000717 fDR ADOCK0500g6., /

90- H5o - . . . . --

. . e

. .. s j

1 l

Preliminary Cost Estimate for the DECON Option of Decommissioning the KSU TRIGA Mk !! I Nuclear Reactor Facility.

Estimated Cost (1o90 $) .

Met from Requiring Budgeted Supplementa' Cost Category Operations Appropriation _

Disposal of Radioactive Materials Neutron Activated Materials $ 28,143  :

Contatninated Materials 136,369  ;

Decommissioning Wastes ,_24f)) '

Subtotal $189,335 ,

Other Costs Labor $155,174 $120,3(ks Energy . 20,409 Tools 28,130 1 Supplies 8.250 Subtotal $1'5.583 $156.775 =

Subtotal, Raw Estimated Costs $175,583 S346,110

. Conting.. icy (25%) $ 43.806 S 86.528 Total Estimated Costs $219,479 S432/08 I

l i