Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114F599 + (Forwards Input to SER Open Items Re Seismic & Dynamic Qualification of Seismic Category I Mechanical & Electrical Equipment & II.E.4.2 Concerning Operability of Purge Sys Isolation Valves)
- ML20198G331 + (Forwards Input to SER Re Geological Seismological & Foundation Engineering Aspects of Site.Rept Prepared by L Heller,S Coplan & R Mcmullen of Site Analysis Branch)
- ML18139A593 + (Forwards Input to SER Re Implementation of Recommendations for Auxiliary Feedwater Sys.Lists Four Items Needed to Complete SER)
- ML20136F326 + (Forwards Input to SER Re RCPB Fracture Toughness.Addl Info to Determine Compliance w/10CFR50,App,G & H Requested)
- ML20213E052 + (Forwards Input to SER Re Resolutions of Issues from 810928-30 & 1001 Meetings W/Burns & Roe in State of Ny. Final Response Will Indicate Results of Analysis on Support Base Flexability & Remainder of Work)
- ML20198F284 + (Forwards Input to SER Section 4.2.1 Re Fuel Mechanical Design)
- ML19290F424 + (Forwards Input to SER Section 7.2.4 & Generic Issue A-9 Re Atws.Generic Issues Branch Has Reviewed SER Input & Concurs W/Conclusions)
- ML19199A530 + (Forwards Input to SER Suppl 2 Which Completes Reactor Safety Branch Review of TMI-2.Topics Addressed:Overpressure Protection During Startup & Shutdown,Net Positive Head Assessment,Makeup Tank Isolation & Steamline Break Analysis)
- ML19206B127 + (Forwards Input to SER Suppl Prepared by Core Performance Branch Re Revised Main Steam Line Break Analysis.Mechanistic Fuel Failure Investigation Unnecessary)
- ML19319D242 + (Forwards Input to SER Suppl Prepared by Electrical Instrumentation & Control Sys Branch.Review of SER Outstanding Items Completed.Items Satisfactorily Resolved by Util)
- ML19317F467 + (Forwards Input to SER Suppl Re Active Valve Operability)
- ML19317F411 + (Forwards Input to SER Suppl Re Dose Calculations)
- ML19329C596 + (Forwards Input to SER Supporting Proposed Mods to Liquid, Gaseous & Solid Radwaste Sys in FSAR)
- ML17317B088 + (Forwards Input to SER for Proposed Mod to Spent Fuel Storage Pools.Concludes Mod Acceptable Provided U-235 Loading Is Limited to Amount Acceptable in Rept)
- ML17249A587 + (Forwards Input to SER for Proposed Storage of Four Pu-U Mixed Oxide Fuel Assemblies in Spent Fuel Pool)
- ML19329C605 + (Forwards Input to SER from Containment Sys Branch.Requests Addl Info Re Containment Vessel & Interior Compartment Design Pressures)
- ML19208D036 + (Forwards Input to SER on Util Proposed Change to Tech Specs Re Spent Fuel Cooling.Present Tech Spec 3.10E Unnecessary & Should Be Deleted)
- ML20064K969 + (Forwards Input to Safety Evaluation & Eia of Proposed Spent Fuel Pool Storage Capacity Expansion.Evaluation & Appraisal Based on Info Provided in .Proposed Mod Acceptable)
- ML17053A961 + (Forwards Input to Safety Evaluation Re Proposed Mods Per Technical Assistance Contract 7442 to Spent Fuel Storage Racks for Facility)
- ML19210C539 + (Forwards Input to Safety Evaluation Re Util Amend Application to Increase Spent Fuel Pool Capacity)
- ML20247B727 + (Forwards Input to Safety Evaluation Rept Being Prepared to Review BWROG Licensing TR NEDO-32291, Sys Analyses for Elimination of Selected Response Time Testing Requirements)
- ML20039H210 + (Forwards Input to Safety Evaluation on BSAR-205 Covering Sections 4.2.1 & 4.3 & Portions of Chapter 15 of Psar.Also Forwards Info for App C of Safety Evaluation)
- ML20214G601 + (Forwards Input to Second Series of Questions on PSAR)
- ML19263D573 + (Forwards Input to Sections 5.5 & 6.2.4 of Des Re Radiological Impacts from Routine Operation & Radiological Environ Measurements & Monitoring Program)
- ML20247G288 + (Forwards Input to Sections C,D,E,I & J of Initial Rept,Per IE Module 94300)
- ML20082Q912 + (Forwards Input to Ser,Consisting of Emergency Plan Evaluation Rept & Responses to NUREG-0737,Items III.A.1.1,III.A.1.2 & III.A.2 Re Emergency Preparedness)
- ML19220C003 + (Forwards Input to Ser.W/O Encl)
- ML19220C005 + (Forwards Input to Ser.W/O Encl)
- ML20244E344 + (Forwards Input to Sser Section 9.5.1.4,updating NRC Concerns in Sser 5 Re Potential Fire Hazards of HVAC Charcoal Filter Units.Revised Page 11-1,responding to Licensee Comments on Sser 5,also Encl)
- ML20093N848 + (Forwards Input to Staff Testimony in Preparation for ASLB 821115-23 Hearings,In Response to W Paton Verbal Request & M Wilcove Request.Structural Engineering Branch Input Applicable Only to Svc Water Pump Structure)
- ML19319C506 + (Forwards Input to Suppl to Draft SER from Containment Sys Branch.Containment Pressure Calculated for Facility ECCS Analysis According to App K)
- ML19250C341 + (Forwards Input to TMI-1 Design Review & Supplemental Items)
- ML19317F456 + (Forwards Input to Wer Suppl Re Instrumentation,Control & Power Sys)
- ML19319C652 + (Forwards Input, Environ Impact of Postulated Plant Accidents, for Facility SER from Accident Analysis Branch)
- ML20148L552 + (Forwards Input,Model Description & Transient Time Steps for Prediction of Loft Small Break Test L3-6 Using Notrump Computer Code)
- ML19323C625 + (Forwards Inputs on Facility Fire Protection Review,Items 3.2.1 & 3.1.1B Re Fire Detection Sys for Drywell Detectors & Upgrading Existing Sys)
- ML19323F191 + (Forwards Inputs to 800111 Status Rept Re Ucs Interrogatory 211.Intervenors Are Not Provided W/Copies Due to Voluminous Matl.Copies Available in PDR & Lpdr)
- IA-84-741, Forwards Inputs to Sser 24,including Staff Evaluation of 840202 Petition Filed by Govt Accountability Project Inst for Policy Studies & Updated Info on Allegations 39 & 45. SALP Input Encl + (Forwards Inputs to Sser 24,including Staff Evaluation of 840202 Petition Filed by Govt Accountability Project Inst for Policy Studies & Updated Info on Allegations 39 & 45. SALP Input Encl)
- ML20244D033 + (Forwards Inputs to Sser 24,including Staff Evaluation of 840202 Petition Filed by Govt Accountability Project Inst for Policy Studies & Updated Info on Allegations 39 & 45. SALP Input Encl)
- ML19317E048 + (Forwards Inquiry & Insp Repts Conducted on 680201-720607. Inquiry Rept 50-269/72-09 Encl)
- ML20141D352 + (Forwards Inquiry 99990001/86-01 on 860114 & Notice of Violation)
- ML20141D355 + (Forwards Inquiry 99990001/86-01 on 860114 & Notice of Violation)
- ML20126C879 + (Forwards Inquiry Evaluation of Licensee Performance Re 800211 Local Emergency & 800212-13 Minor Gaseous Leak.Addl Review Will Be Done During Subsequent Monitoring Activities. Certain Areas Examined Are Subj to Enforcement Actions)
- ML19326A606 + (Forwards Inquiry Re Complaint Filed W/Nrc on CP&L Rates to Municipal Power Sys & Re Competition & Retail Rates in Light of Antitrust Case.W/O Encl)
- ML20198K653 + (Forwards Inquiry Re High Level of Tritium Release for Haddam Neck Npp.Info Partially Withheld)
- ML20058N347 + (Forwards Inquiry Received from R Pettite.Requests Review & Prompt Response)
- ML20128B292 + (Forwards Inquiry Rept & Transmittal Memo Relating to Detection of Exposure Levels of High Readings on Environ Thermolumluminescent Dosimeters)
- ML20128B298 + (Forwards Inquiry Rept & Transmittal Memo Relating to Detection of Exposure Levels of High Readings on Environ Thermolumluminescent Dosimeters)
- IR 05000219/1972025 + (Forwards Inquiry Rept 50-219/72-25 Re Relief Valve Discharge Piping)
- ML20024G532 + (Forwards Inquiry Rept 50-263/72-02 .Licensee Failed to Detect Increase in Tank Level Coupled W/Decrease in Boric Acid Concentration)
- ML20128B052 + (Forwards Inquiry Rept 50-263/72-17Q Re Failure of Motor Which Drives One of Four RHR Pumps & Cracking of Air Diffusers in Motors)
- ML20128B054 + (Forwards Inquiry Rept 50-263/72-17Q Re Failure of Motor Which Drives One of Four RHR Pumps & Cracking of Air Diffusers in Motors)