Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010H229 + (Forwards Info Re Equipment Environ Qualification/Radiation Profiles in Response to 810915 Request)
- ML19343B805 + (Forwards Info Re Equipment Survivability for Facility,Per Commitment Made at 801218 Meeting W/Nrc on Hydrogen Issue)
- 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 + (Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603)
- ML19290A322 + (Forwards Info Re Estimated Release of Radioactivity from TMI & Calvert Cliffs Plants)
- ML20067B890 + (Forwards Info Re Evaluation of Raw Water Pump,Charging Pump & Containment Ventilation Fan Motors)
- ML13317B071 + (Forwards Info Re Evaluation of Valve Seat Faces MOV-850A, MOV-850B & MOV-850C Contact Stress.Results of Evaluation Prior to Power Operation from Current Outage & Any Corrective Actions Will Be Submitted)
- ML19241A840 + (Forwards Info Re Examinations Administered to Licensed Operators & Senior Operators.Includes Examination & Grading Key Summary of Test Results.Individual Answer Sheets Encl)
- ML19275A160 + (Forwards Info Re Examinations Performed During 1979 Refueling Outage & Unit 1 Pump & Valve Testing Program to Comply W/Subarticle IWA-6220 of ASME Section Xi.Rept Is Late Due to TMI Incident)
- ML19289E519 + (Forwards Info Re Executive Branch Response on Edlow Intl Co Application for License to Export Low Enriched U to India)
- ML19254F981 + (Forwards Info Re Existing Auxiliary Feedwater Sys at Facility,Per 791107 Request.Proposed Tech Specs to Be Submitted to NRC by 800123)
- ML20087J272 + (Forwards Info Re Experience Level of Individuals Assigned to Shift Operating Positions,In Response to Request. Tabulation Showing Experience of Shift Engineer,Shift Foreman,Station Control Room Engineer & Operator Encl)
- ML19276E579 + (Forwards Info Re Experience of EPA & FTC W/Hybrid Rulemaking Hearings.Concludes Procedure Has Not Worked Effectively. Emphasizes Active & Impartial Hearing Panel Is Essential to Make Process Work)
- ML18032A728 + (Forwards Info Re FSAR Chapter 2 Update Process & Plans to Modify Process as Part of Development of New Program for FSAR Updates,Per IE Insp Repts 50-259/87-30,50-260/87-30 & 50-296/87-30.List of Commitments Also Encl)
- ML20039G964 + (Forwards Info Re FSAR as Requested by Effluent Treatment Sys Branch & Procedures & Test Review Branch)
- ML20214G429 + (Forwards Info Re Fabrication Difficulties Experienced in Attachment of Main Steam Relief Valve Platform Support Ring to Containment Vessel.Lamellar Tearing Detected During Insp. Review of Design & Fabrication Underway)
- L-79-205, Forwards Info Re Fabrication,Insp & Operating History of Feedwater Lines in Further Response to 790525 Request + (Forwards Info Re Fabrication,Insp & Operating History of Feedwater Lines in Further Response to 790525 Request)
- ML20147F106 + (Forwards Info Re Facil Fuel Element Decay Heat as of 771130)
- ML20004D087 + (Forwards Info Re Facilities Fire Protection Safe Shutdown Analysis Scheduled for Completion 810930,per)
- ML18082A017 + (Forwards Info Re Facility 800226 Reactor Trip in Response to NRC 800306 Request & IE Bulletin 79-29.Rept Addresses Each Item Discussed)
- ML19281A877 + (Forwards Info Re Facility Attachments of Various Reactors & Intermediate Consignees Covered by Pending Export License Applications)
- ML20062A746 + (Forwards Info Re Facility Compliance w/NUREG-0737,Item II.F.2 Re Inadequate Core Cooling,Per Condition 2.C.(30).(i) of License NPF-11.No Addl Instrumentation Needed to Detect Inadequate Core Cooling)
- ML20031F139 + (Forwards Info Re Facility Environ Qualification Program)
- ML20126F960 + (Forwards Info Re Facility FSAR Relative to CEDMs)
- ML20236B254 + (Forwards Info Re Facility Hydrogen Recombiner Sys,Per 870715 Telcon W/R Anand)
- ML20028F942 + (Forwards Info Re Facility Incidents Concerning Misalignment of High Head Safety Injection Isolation Valve,Per P Bobe 820324 Request.Incident Possibly Caused by Sabotage)
- ML13333B128 + (Forwards Info Re Facility Intake Structure Degradation)
- ML19343A172 + (Forwards Info Re Facility Location,Restricted Areas,Emission Monitoring,Sampling Sys & Seismic Test,In Response to NRC 800731 Ltr. Atmospheric Dispersion of Ar-41 from Ucla Nuclear Reactor Encl)
- ML19343A171 + (Forwards Info Re Facility Location,Restricted Areas,Emission Monitoring,Sampling Sys & Seismic Test,In Response to NRC . Atmospheric Dispersion of Ar-41 from UCLA Nuclear Reactor Encl)
- ML20117N992 + (Forwards Info Re Facility Operating License TS Change)
- ML20041B125 + (Forwards Info Re Facility Overpressure Mitigation Sys,Per NRC 820108 Request)
- ML20214W006 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Util Estimates Fuel Load Date of 860331)
- ML20214V996 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Fuel Load Date in Mar 1986 Estimated)
- ML20214V957 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Fuel Loading Completed on 861103)
- ML20214V940 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Fuel Loading Completed on 861103)
- ML20214W014 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Util Anticipates Fuel Load Date of June-Jul 1986)
- ML20214W027 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Util Estimates Fuel Load Date of mid-Sept 1985)
- ML20206R370 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encl Lists Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Projected Fuel Load Date Is 860930)
- ML20209F155 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encl Lists Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Projected Fuel Load Date Is 860930)
- ML20214W048 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Make Recommendation for Licensing.Util Estimates Fuel Load Date in Dec 1985)
- ML20214V965 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Fuel Loading Date of 861115 Projected)
- ML20214V923 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Fuel Load Date of 860930 Projected)
- ML20214V985 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Endorse Finding of Readiness.Util Estimates Fuel Load Date of Feb to Mar 1986)
- ML20214W055 + (Forwards Info Re Facility Preparedness for Licensing,Per IE Manual Chapter 94300.Encls Include Items Requiring Insp & Resolution Before Region III Can Make Recommendation for Licensing.Util Estimates Fuel Load Date of 860123)
- ML19303A910 + (Forwards Info Re Facility Quality Confirmation Program,In Response to 820614 & 0712 Requests.Info Current as of 820530)
- BECO-LTR-95-126, Forwards Info Re Facility Requested by German Federal Ofc for Radiation Protection.W/11 Oversized Drawings + (Forwards Info Re Facility Requested by German Federal Ofc for Radiation Protection.W/11 Oversized Drawings)
- ML19329D975 + (Forwards Info Re Facility Shutdown Effect on Northern CA Electric Capacity Margins in Response to NRC Request. Provides Estimated Electric Capacity Margins W/& W/O Addl Purchases from Neighboring Utils)
- ML19329B776 + (Forwards Info Re Facility Status Since 770414 Memo)
- ML18022A471 + (Forwards Info Re Facility Tdi Diesel Generator Maint & Surveillance Insp Frequencies,Per Issuance of License NPF-53)
- ML19210B612 + (Forwards Info Re Failure of Westinghouse Circuit Breakers Involving Undervoltage Trip Attachment.Info to Be Used in Future Performance of Reactor Scram Circuit Breakers.No Action by Met Ed Required)
- ML20211C673 + (Forwards Info Re False Grade 8 Engineering Performance Marks on Bolting & Improper Marking of Grade 8 Nuts for Safety Engineers & Insp Personnel for Review & Comment)
- ML19341C286 + (Forwards Info Re Faults 26 & 27 in Foundation Piers 34 & 19 of Unit 1 Cooling Tower,Initially Reported on 810113 & 22. Neither Fault Is Capable within Meaning of App a to 10CFR100)