.fN,,I ATOMIC ENERGY COMMISSION d* [ X, e h I
- V DIVis!ON OF COMPLIAMcE 201 645 3940 REGION I
, \\
W 970 DROAD STREET NEWARK. NEW JERSEY 07102 DEC 9 1971 s
Metropolitan Edison Company DocketNos.50-289/
ATTN:
Mr. J. G. Miller, Vice President 50-320 P. O. Box 542 Reading, Pennsylvania 19603 t
Gentlemen:
We recently received information from two licensees operating pressurized water reactors which may relate to the future perfor=ance of reactor scram circuit breakers in your facility.
This letter provides you with a copy of the body of the letter that was forwarded to the licensees of operating prescurized water reactors by cognizant Regional offices of the Division of Conpliance.
No action on your part is required; however, we will review this matter during our continuing inspection program.
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Very truly yours, James P. O'Reilly Director
Enclosure:
Body of Letter to Licensees of Operating Pressurized Water Reactors bec:
A. Giambusso, CO L. Kornblith, CO R. Engelken, C0 J. G. Keppler, CO (5)
C0 J. B. Henderson, W DR Central Files 1583 008 791111oOff f
t.!
ENCLOSURE EODY OF LETTER TO LICENSEES OF OPERATING PRESSURIZED UATER REACTORS We recently received information relating to the performance of reactor scram circuit breakers from two licensees operating pressurized water reactors.
The reactor scrca circuit breakers arc Westinghouse, type DB-50.
The information is as follows:
Plant A Three failures to operate occurred at this facility.
Each failure involved.the undervoltage trip attachment.
No common mode of failure could be identified.
One failure was attributed to a broken latch pin, the second to mechanical binding of the trip lever, and the cause of the third was not specifically identified.
Plant B Two of the two reactor scram circuit breakers failed to trip on undervoltage during surveillance testing.
The failure to trip was attributed to dirt accumulation on exposed linkages. This failure occurred after completion of inspection of the scram breakers to determine the applicability of the problems observed at Plant A.
It is requested thdh you inform this office within 10 days, in writing, whether reactor scram circuit breakers of the described make and model are installed in your facility.
If the answer to this question is in the affirmative, provide the date when each of your reactor scram circuit breakers will be inspected and tested.
In addition, it is requested that you inform this office within 10 days, in writing, following com-pletion of your inspection and tests, of your specific findings, including a description of corrective actions taken or planned and the scheduled completion date of planned actions, Should you have any questions concerning this matter, we will be pleased to discuss them with you.