ML20117N992
| ML20117N992 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/18/1996 |
| From: | Kitlan M DUKE POWER CO. |
| To: | Tam P NRC |
| Shared Package | |
| ML20117N988 | List: |
| References | |
| NUDOCS 9606250118 | |
| Download: ML20117N992 (2) | |
Text
]
~
t 1
Duke Power Company 4800 Concord Road York, South CaroHna 29745 Catawba Wclear Station Fax Cover Sheet DATE:
June 18,1008 TIME:
1,42 PM To:
Peter Tam PrtONE:
301-415-1451 FAX:
301-415-21C2 FROM:
M:ke Kitlan PHONE:
803-831-3205 Regulatory Compliance PAX:
603-831-3191 i
RC:
Facitty Operating License / Technical Specification Change TS 144/136 Number of pages including cover sheet: 2 Message 1
i l
l l
9606250118 960620 PDR ADOCK 05000413 p
PM l
T002 3XVIldK03 1801Y'I.133H 16TCIC9C09 IY3 Og:gi 311 98/91/90
)
1 Compliance Functional Area Manual 3.3 POLrrs Rev.1 Page 1 of 2 FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATION CHANGE IMPLEMENTATION SHEET
%CNS O MNS O ONS UNIT NO. 5-1 Y 2 Q3 TS NO.
S /,.R 3 A L4+3.L/. 7 DATE RECEIVED _
f-G O- %
AMENDMENT. NO.194 [M l*4R[o/a) SITE PLAN NO(S).
1.
IMPLEMENTATION DATES A.
NRC EFFECTIVE DATE (From NRC letter): _
/o-/3-9(o B.
STATION IMPLEMENTATION (Grace Period - 2 WEEKS):
2.
PLANT NOTIFICATION ialtiolt daw A.
/fg5Via E-Mail Distribution; Include Site Technical Contacts R
.W(. /mPre-implementation Items
)
3.
RGC TECIINICAL CONTENT REVIEW CRITERIA B
A.
All Discrepancies Have Been Resolved Via NRC Interface.
E B.
No inadvertent Changes were Made To TS Sheets Involved.
E C.
TS Change W ssued As uested By DPC.
TECHNICAL REVIEWER:
IC I' 8 -'74 G.tstDi cies on p Page) - Q Date cucuo av: %uMA( /mM s-/ze/%
(List Disc'rs'pencies On Attacheil Page)
Date 4.
N ALL CORRECTIVE A NS FROM ASSIGNED PIP COMPLETED d-#-9d VERIFIED BY:
s A a y
atoff 6 amp Date 5.
FINALhEMENTATION APPROVAL co/A h
Manager, RTguistory Cor.pliance i udie 7)1dd d
& /n/%
Managed Safety Assurance Deie V00 @
3XVI' Idle 03 1H0.1Y1.193H T6iCIC6C09 IY3 IS:EI 3.U.
98/9I/00