Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17324B001 + (Forwards Incomplete EGG-NTA-7282, Conformance to Reg Guide 1.97,DC Cook Nuclear Plant Units 1 & 2. Preliminary Evaluation Based on Util 850228 & 1015 Submittals Re Rev 2 to Reg Guide)
- IR 05000293/1982021 + (Forwards Incomplete IE Mgt Meeting Rept 50-293/82-21 on 820707 Re Violation of Limiting Condition for Plant Operation)
- ML19253C285 + (Forwards Incomplete Info Re Auxiliary Feedwater Sys,In Response to NRC .Complete Info Provided by 800101, Upon Completion of Reliability Assessment.Westinghouse Is Providing Analysis Details for Sys Requirements)
- IR 05000346/1989022 + (Forwards Incomplete Insp Rept 50-346/89-22 on 890914-1106 & Notice of Violation.Violation Re Domestic Water Sys Lines Outside Design Basis,Identified in Insp Rept 50-346/86-12, Remains as Is)
- ML20082E289 + (Forwards Incomplete List of Citizen Questions Re Rev 1 to Emergency Plan.Timely Response Urged)
- ML17334A830 + (Forwards Incomplete Procedures Entitled, Writers Guide for DC Cook Nuclear Plant Emergency Operating Procedures & Specific Tech Spec Guidelines for DC Cook Nuclear Plant Emergency Operating Procedures, Per 840612 Order)
- ML20203E727 + (Forwards Incomplete Rev 4 to McGuire Nuclear Station Fire Protection Review,Mar 1986, Updating Info Re Cold Shutdown Equipment.Min Set of Electrical Components for Cold Shutdown Identified.W/Three Oversize Drawings)
- ML20206T364 + (Forwards Incomplete SER Accepting Oconee TSs for ICC Instrumentation.However NRC Believes That Their Technical Justification Section on RVLIS Misleading & Have Reiterated NRC Strong Belief for Need for RVLIS)
- ML20134D496 + (Forwards Incomplete Supplemental Rept Q4-84-018(S) Re QC Inspector Intimidation)
- ML17258A930 + (Forwards Incore Data Comparing Differences in Measured & Predicted Power Between Mixed Oxide & U Assemblies,In Response to Amend 32 to Provisional License DPR-18)
- ML19259C005 + (Forwards Incore Insp Region 35 & Region 13 Core Support Block)
- ML20071B448 + (Forwards Incorporation of Westinghouse Model for Upper Plenum Injection in 1981 Evaluation Model Wreflood Code)
- ML20003A094 + (Forwards Increment of Analysis of Effects of Natural Phenomena Re Facility.Two Repts & Lll Draft Seismic Evaluation of Bldg 102 of GE Vallecitos Nuclear Ctr Encl)
- ML19322E325 + (Forwards Increment of Analysis of Effects of Natural Phenomena on Pu Fabrication Operations.Increment of Analysis Considers Environ Character Around Plant.Nrc Has Adopted Analysis for Application in Future Analyses)
- ML19347B762 + (Forwards Increment of Analysis of Effects of Natural Phenomena Entitled Environ Consequences of Postulated Pu Releases from Exxon Nuclear Mixed Oxide Fabrication Plant, Richland,Wa,As Result of Severe Natural Phenomena)
- ML20003G539 + (Forwards Increment of Analysis, Environ Consequences of Postulated Pu Releases from GE Vallecitos Nuclear,Ca,As Result of Severe Natural Phenomena)
- ML19294C136 + (Forwards Increment of NRC Analysis of Effects of Natural Phenomena Re Pu Operations.Analysis Is Review of Features within Facility That May Have Significant Effect Upon Releases from Plant During Natural Phenomena Events)
- ML20151A114 + (Forwards Increment to Analysis Entitled Effect of Natural Phenomena on Existing Pu Fabrication Facilities,Response of Structures to Wind Hazard at Atomics Intl Nuclear Matls Development Facility,Santa Susana,Ca, Vol I)
- ML19312D659 + (Forwards Increment to Analysis of Effects of Natural Phenomena Re Pu Fabrication Operations.Rept Entitled Calculation of Particulate Dispersion in Design-Basis Tornadic Storm)
- ML20137D736 + (Forwards Indemnity Agreement & Amends for Univ of New Mexico Reactor.W/O Encls)
- ML20210Q483 + (Forwards Indemnity Agreement B-103,per 851028 Request)
- ML19345A326 + (Forwards Indemnity Agreement B-17.EP Price Encl)
- ML19308A771 + (Forwards Indemnity Agreement B-44)
- ML19308D942 + (Forwards Indemnity Agreement B-54 to License SNM-1275 & Submits Address Change)
- AECM-81-359, Forwards Indemnity Agreement B-72 for License SNM-1882 in Response to 810715 Request + (Forwards Indemnity Agreement B-72 for License SNM-1882 in Response to 810715 Request)
- ML20062A890 + (Forwards Indemnity Agreement B-84)
- ML20031G833 + (Forwards Indemnity Agreement B-90 & Nuclear Energy Liability Insurance Policy for Susquehanna)
- ML20003H583 + (Forwards Indemnity Agreement Granting Rockwell Intl Access to West Valley,Ny Facility for 1981-82.Requests NFS Signature)
- ML17326A721 + (Forwards Indemnity Fee for 800817-810817)
- SNRC-1335, Forwards Indemnity Fee for 870519-880518 for License NPF-36. Rev of Mailing List to Reflect Jd Leonard as Addressee in Lieu of Ms Pollock Requested + (Forwards Indemnity Fee for 870519-880518 for License NPF-36. Rev of Mailing List to Reflect Jd Leonard as Addressee in Lieu of Ms Pollock Requested)
- ML17317B414 + (Forwards Indemnity Fee for Period 780818 Through 800817,per 790713 Request)
- ML17317B235 + (Forwards Indemnity Fee for Unit 1 for 790526-800525 & Fee for Unit 2 for 770818-790817)
- ML20138R977 + (Forwards Independent Assessment Program Phase 3 Pipe Stress Followup Questions on Hydrotest Loads & Pipe Stress Review of Welded Attachments)
- ML20024C443 + (Forwards Independent Assessment Program, Per Agreement Reached at 830518 Meeting)
- ML20024C444 + (Forwards Independent Assessment Program, Per Agreement Reached at 830518 Meeting)
- ML20107G480 + (Forwards Independent Assessment Program:Design Change Tracking Group Data Base Review. Rept Provides Results of 840613-15 Review)
- ML20134P884 + (Forwards Independent Assessment Team Rept for LaSalle Station)
- ML20134P886 + (Forwards Independent Assessment Team Rept for LaSalle Station.)
- ML20212M105 + (Forwards Independent Assessment of Advanced LWR Util Requirements Document Chapter 1:Overall Requirements, in Response to NRC-03-86-057.Rept Complete & Sufficient Enough for Generation of Design Specs)
- ML20073Q492 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 22, for Wk of 830213-19.Meeting Minutes Encl)
- ML20073Q496 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 24, for Wk of 830227-0305)
- ML20083Q495 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 14 for 821219-25.Minutes of Daily Meetings W/Assessment Team & Site Engineering Personnel Encl)
- ML20091N283 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 6 for 821024-30)
- ML20070S298 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 11 for 821128-1204)
- ML20073Q499 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 25, for Wk of 830306-12)
- ML20091M917 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 18 for 830116-22 & Minutes of Daily Meetings)
- ML20091M948 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 19 for 830123-29 & Minutes of Daily Meetings)
- ML20083Q532 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 16 for 830102-08.Minutes of Daily Meetings W/Assessment Team & Site Engineering Personnel Encl)
- ML20083Q541 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 17 for 830109-15.Minutes of Daily Meetings W/Assessment Team & Site Engineering Personnel Encl)
- ML20091N264 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 8 for 821107-13)
- ML20070S312 + (Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 10 for 821121-27)