ML19347B762

From kanterella
Jump to navigation Jump to search
Forwards Increment of Analysis of Effects of Natural Phenomena Entitled Environ Consequences of Postulated Pu Releases from Exxon Nuclear Mixed Oxide Fabrication Plant, Richland,Wa,As Result of Severe Natural Phenomena
ML19347B762
Person / Time
Site: Framatome ANP Richland
Issue date: 09/12/1980
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Nilson R
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML19347B763 List:
References
REF-PROJ-M-3 NUDOCS 8010150620
Download: ML19347B762 (1)


Text

_

ff o,,,

UNITED STATES

(

)n g

NUCLEAR REGULATORY COMMISSION E

WASHING TON, D. C. 20555

\\;%Af SEP 12 ISB0 Docket No. 70-1257 Project M-3 Exxon Nuclear Company, Inc.

ATTN:

Dr. Roy Nilson, Manager Licensing Research and Technology Center 2955 George Washington Way Richland, Washington 99352 Gentlemen:

The purpose of this letter is to transmit for your information an increment -

of the analysis of the effects of natural phenomena relative to your plutonium fabrication operations at Richland, Washington. The subject increment of analysis is the environmental consequences of postulated plutonium releases from your Richland, Washington plant as a result of severe natural phenomena.

A draft of the enclosure has been reviewed, and commented upon, by those analysts who required the results to carry out succeeding analyses and by NRC staff.

The nkt staff has endorsed this final version of the review for application in succeeding analyses.

However, we will consider challenge of our endorsement when supported by credible technical bases.

Any questions you may have on the enclosed analysis should be addressed to James E. Ayer of this Branch.

Sincerely,

/

~(

Q Leland C. Rouse, Chief Advanced Fuel and Spent Fuel Licensing Branch Division of Fuel Cycle and Material Safety

Enclosure: