ML19312D659

From kanterella
Jump to navigation Jump to search
Forwards Increment to Analysis of Effects of Natural Phenomena Re Pu Fabrication Operations.Rept Entitled Calculation of Particulate Dispersion in Design-Basis Tornadic Storm
ML19312D659
Person / Time
Site: 07000754
Issue date: 02/21/1980
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Cunningham G
GENERAL ELECTRIC CO.
Shared Package
ML19312D660 List:
References
NUDOCS 8003250152
Download: ML19312D659 (1)


Text

.

Ogu WWu4 UNITED STATES l

p g

k, NUCLEAR REGULATORY COMMISslON

[

.S WASHINGTON. D. C. 20555

'D l.

FEB 211980 T y*,.. /

I I

Docket No.70-754 Project:M-3 General Electric Company ATTN: Mr. G. E. Cunningham

)

Senior Licensing Engineer l

P..O. Box 460 Pleasanton, California 94566 Gentlemen:

The purpose of this letter is to transmit for your information an increment of the analysis of the effects of natural phenomena relative

. to your plutonium fabrication operations at Pleasanton, California.

The subject increment is the analysis is the particulate dispersion in a tornadic storm around your Pleasanton, California plant. A draft of a similar enclosure has been reviewed, and comn..ced upon, by those analysts who require the results to carry out succeeding analyses and by the NRC staff. The NRC staff has endorsed this final version of the review for application in succeeding analyses.

However, we will consider challenge of our endorsement when supported by credible technical bases.

Any questions you may have on the enclosed analysis should be addressed to James E. Ayer of this Branch. He will direct resolution of comments and any justifiable revision of the analysis.

Sincerely, C. m Leland C. Rouse, Chief Advanced Fuel and Spent Fuel Licensing Branch Division of Fuel Cycle and Material Safety

Enclosure:

DP-1543 8 0 0 3 2 5 0 e s a-t

-