STONE 6 WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET, BOSTON. M ASS A CH USETTS ADDRESS ALL COR'RESPONDENCE TO P.O. BOK 2325. BOSTON. M ASS. 02107 W U TELEX 94-0001 w op C NsTRuCTIOP CMtmmy N4LL NJ REPORTE C CAGb C N LT G "OT1"c o..
oN us-we. c e United States Nuclear Regulatory Commission December 7,1982 Midland Site Resident Inspection Office Route 7 J.0. No. 14358 Midland, MI 48640 Ref. MFP 11 Attention Mr. R. Cook RE:
DOCKET NO. 50-329/330 MIDLAND PLANT - UNITS 1 A!;D 2 INDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING REPORT NO. 11 A copy of the Independent Assessment of the Auxiliary Building Under-pinning Weekly Report No. 11 for the period November 28 through December 4, 1982, is enclosed with this letter. Included, as an attacheent, are the minutes of the dai]y meetings held between members of the Assessment Team and Site Engineering, Construction and Quality Assurance personnel during the week.
If you have any questions with respect to this report please contact me at (617) 589-2067.
h PRINCIPAL STAFF l9:
l A. Stanley Lucks RA Project Manager D/RA
( up g A/RA sg g j3 Enclosures D.P.M' P pao l/
PFFCOsl sto j
ASL/nb DECTP p j
HL j
OL FILE
/[/g/ ]
0302040345 830120 DEC 10 PDR ADOCK 05000329 g
.,,y,
. Midland Plant Units 1 and 2 l
Independent Assessment l
Auxiliary Building Underpinning Weekly Report'No. 11 November 28 through December'4, 1982 l
Personnel on Site Stone & Webster Engineering-Corporation (SWEC) 1 i
A. B. Scott 12/1 - 12/3 i
l Par sons, Erinckerhoff, Quade & Douglas (PBQD)
J. Ratner 11/29 - 12/3 l-Activities l
Observed the results of a bell mock-up concrete. pour done on November 23, 1982, at the Poseyville Storage Yard.
Reviewed the latest revision of the Auxiliary Building and FIVP Underpinning specification.
Meetings Attended 1
Date Represented Purpose 11/30 Stone & Webster (12/1-12/2)
Daily Meeting through Bechtel 12/02 Parsons, Brinckerhoff, Quade & Douglas (11/30-12/1)
Consumers Power 12/2 Stone & Webster Update on items Bechtel requiring resolutions Parsons, Brinckerhoff to start construction--
Quade & Douglas Specification, l Procedureg Consumers Power PQCI's, and QC Training Mergentime 12/3 Stone & Webster Weekly Soils Review Bechtel Parsons, Brinckerhoff Quade & Douglas Mergentime Consumers Power 4
Observati,pgs The concreted -mock-up of a belled pier showed no significant voids or evidence of separation between fine and course aggregates.
J.O. No 14358 Midland Plant Units 1 and 2 Independent Assessment Auxiliary Building Underpinning Non-Conformance Identification Report No new issues.
Status of previous issues:
NIR No.
Date Status 1
10/21/82 Open 2
10/29/82 Open Ik) $. l$ 'n k 3 Y cyx a
Project Engineer Project Manager i
(
.1RDEFEMDENT ASSESSMENI TEAM MI2TIhJ WITH BECHTEL Date:
November 29, 1982 No Neeting held this date. No representatives from Stone & Webster or Parsons Brinckerhoff present on site at meeting time.
5 f"
w
s INDEPEKDEh'T ASSESSMENT TEAF MEEUNG WITH BECHTEL Date:
Kovember 30, 1982 Attendees:
PB@
Beehtel CPCo MPQAD J. Ratner J. Fisher R. Weiland L. Kettren E. Cviki 1.
Fisher stated that the letter to the NRC from CPCo notifing the agency that CPCo is ready to start work may be transmitted to RRC early part of next week, at the earliest.
2.
Upon approval to start work, contractor will start both East and West number 12 Piers on a single shift basis.
3.
Contractor will start bringing material to work areas after letter to ERC requisting permission to start is sent.
l 1
(.-
L
INDEFENDENT ASSESSMENT TEAM MEETING kTfB BECHTEL Date: December 1, 1982
~
Attendees:
FBQD CPC0 Bechtel MP4AD J. Ratner R. L'eiland J. Fisher L. Kettren E. Cviki D. Levelle 1.
J. Fisher stated that they are proceeding on schedule to complete their review in order that CPCo can advise the hTtC on Monday, December 6,1982, that the underpinninE work is ready to be started.
t C
INDEFEMDIFT ASSESSMErf TEAM MEETING WITH BECHTEL Date: December 2, 1982 Attendees:
SWEC PBQD CPCO Bechtel A. Scott J. Ratner R. Weilar.d J. Fisher E. Oviki D. Levelle 1.
J. Fisher stated that CPCo is continuing on schedule to send letter to NRC requesting permission to start underpinning. Teative cchedule:
Send Letter to ERC Monday, December 6,1982.
a.
b.
MRC to come to site Wednesday, December 8,1982, to review CPCo.
c.
Start work pier 12 Monday, December 13, 1982.
2.
Bechtel will test zud mat mix with a higher temperature water (but no accelerstor) in order to attempt to reduce time to obtain 300 psi.
3 J. Fisher will find out the Holiday, schedule for working during the Christmas and New Year holidays.
(
1 4-
.i 1
i 1
2 t
i
. INDEPENDENT AF9ESSISNT TEAM MEETING WITE BECETEL
. 7
~Date:. Deeember 3, 1982 s
Eo meeting was held this dete. Meeting cancelled by Bechtel Corporation.
a i
i 4
Y i
l.
+
u i5 3
I i
j i
I t
l
-t I
i l
l I,
t k
4 I
I a
l i
j i
I k
- ervc,---..---..
-e-
..-_--,_-__------er.--
e e.
- -...=
,e-.-
.- s
-. ~.,. -.., -..-_.,
.