Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20006B209 + (Forwards Fire Operability Requirements 3 & 14,Issues 3 & 4, Respectively,To Fire Protection Program Plan,Section FP.6.1. Changes Cover Halon Sys & Basis & Records Ctr Halon Sys)
- ML19256E601 + (Forwards Fire Protection Analyses of Alternate Methods of Spent Fuel Pool Cooling,In Response to Requirements of NRC 790906 Fire Protection Safety Evaluation)
- ML20054K562 + (Forwards Fire Protection Analysis 10CFR50 App R, Vols 1-3)
- AECM-85-0194, Forwards Fire Protection Analysis for Grand Gulf 1, Supporting Proposed Exception from Section III.L.1 of App R to 10CFR50 Re Safe Shutdown Sys.Info Re Suppression Pool Level Monitoring Capability Also Encl.Fee Paid + (Forwards Fire Protection Analysis for Grand Gulf 1, Supporting Proposed Exception from Section III.L.1 of App R to 10CFR50 Re Safe Shutdown Sys.Info Re Suppression Pool Level Monitoring Capability Also Encl.Fee Paid)
- B10430, Forwards Fire Protection App R Review for Facility & App E Fire Zone/Cable Routing Identification Drawings + (Forwards Fire Protection App R Review for Facility & App E Fire Zone/Cable Routing Identification Drawings)
- ML20041D928 + (Forwards Fire Protection App R Review for Facility)
- ML20062C078 + (Forwards Fire Protection App R Review,Haddam Neck Plant, Supplemental Info)
- ML20062C881 + (Forwards Fire Protection App R Review,Millstone Unit 1, Supplemental Info,Supporting 810319 Request for Exemption from App R Requirements)
- ML20054K130 + (Forwards Fire Protection App R Review,Per 10CFR50.48(c)(5) Requirements & Generic Ltr 81-12.App R Objective of Assuring Safe Shutdown Capability in Event of Fire Can Be Met W/O Full Compliance W/Each Provision of App R)
- ML20053E748 + (Forwards Fire Protection Associated Cable Rept, in Response to NRC 820208 & 0406 Requests for Info.Rept Based on Development of Alternate Safe Shutdown Cable Charts)
- ML20006E675 + (Forwards Fire Protection Changes from Previous Submittals in Fire Protection Compliance Approaches,Per 891004-05 Meetings.Approaches for Analyzing Effects of Multiple High Impendance Faults & Analyzing Room Heatup Also Encl)
- L-82-394, Forwards Fire Protection Commitments Made During May 1982 Site Visit,Including Commitment to Add Automatic Smoke Detection Capability to Both safety-related Battery Rooms. Drawing Encl + (Forwards Fire Protection Commitments Made During May 1982 Site Visit,Including Commitment to Add Automatic Smoke Detection Capability to Both safety-related Battery Rooms. Drawing Encl)
- ML19290E908 + (Forwards Fire Protection Design Review for Item 3.1.4(5) Re Hose Stations)
- ML19290F001 + (Forwards Fire Protection Design Review.Discusses Fire Detectors,Automatic Sprinkler Sys,Fire Barrier Penetrations, Thermal Insulation of Valves,Emergency Feedwater Pump Penetration,Cable Separation & Relay Room Protection)
- ML20209C678 + (Forwards Fire Protection Draft Ser.Fire Protection Review Site Visit Not Made Yet.Open Items Listed)
- ML19253B508 + (Forwards Fire Protection Evaluation - Fire Hazards Analysis Rept, Revision 3)
- B12321, Forwards Fire Protection Evaluation Discussing Shutdown Sys Availability in Event of Fire.Exemption Requests for Containment Liner & Reactor Bldg Instrument Racks Planned. W/O Encl + (Forwards Fire Protection Evaluation Discussing Shutdown Sys Availability in Event of Fire.Exemption Requests for Containment Liner & Reactor Bldg Instrument Racks Planned. W/O Encl)
- U-600218, Forwards Fire Protection Evaluation Rept & Fire Protection Safe Shutdown Analysis + (Forwards Fire Protection Evaluation Rept & Fire Protection Safe Shutdown Analysis)
- ML19329E585 + (Forwards Fire Protection Evaluation Rept Per NRC 760930 & Util s.Rept Addresses App a to Branch Technical Position Apcsb 9.5-1 Guidelines for Fire Protection for Plants Docketed Prior to 760701. W/O Encl)
- B12112, Forwards Fire Protection Evaluation Shutdown Sys Availability, Per 860605 Meeting W/Nrc at Region I. W/O Encl + (Forwards Fire Protection Evaluation Shutdown Sys Availability, Per 860605 Meeting W/Nrc at Region I. W/O Encl)
- ML19257D396 + (Forwards Fire Protection Evaluation, Revision 5,prepared by Gilbert/Commonwealth)
- ML19257D397 + (Forwards Fire Protection Evaluation, Revision 5,prepared by Gilbert/Commonwealth)
- ML20138N683 + (Forwards Fire Protection Evaluations 4, Domestic Water Supply to Nuclear Svc & Decay Heat Seawater Pump Bearings & 5, Crystal River Unit 3 Hose Station Length Discrepancies. Fee Paid)
- 3F1285-03, Forwards Fire Protection Evaluations 4, Domestic Water Supply to Nuclear Svc & Decay Heat Seawater Pump Bearings & 5, Crystal River Unit 3 Hose Station Length Discrepancies. Fee Paid + (Forwards Fire Protection Evaluations 4, Domestic Water Supply to Nuclear Svc & Decay Heat Seawater Pump Bearings & 5, Crystal River Unit 3 Hose Station Length Discrepancies. Fee Paid)
- 3F0785-31, Forwards Fire Protection Evaluations Re Fire Barrier Deviations,Emergency Lights & Protection Against Spurious Actuation of Automatic Fire Suppression Sys,For Review & Concurrence + (Forwards Fire Protection Evaluations Re Fire Barrier Deviations,Emergency Lights & Protection Against Spurious Actuation of Automatic Fire Suppression Sys,For Review & Concurrence)
- ML20024C958 + (Forwards Fire Protection Exemption Request Re Reactor Coolant Pump Oil Collection Sys & Addl Technical Justification for App R Audit Findings)
- ML19347D572 + (Forwards Fire Protection Exemption Request)
- ML19347D573 + (Forwards Fire Protection Exemption Request)
- ML20217D538 + (Forwards Fire Protection Function Insp Rept 50-458/97-201 on 970615-20,0629-0703,0819,980120 & 0305.No Violations Noted. Insp Evaluated Fire Protection Programs Adherence to Design & Licensing Bases as Established by License Condition)
- ML20116P000 + (Forwards Fire Protection Improvement Plan Periodic Status Rept.Rept Identifies Progress Achieved & Areas Needing Further Action.Changes to Improvement Plan Also Encl)
- ML20069L073 + (Forwards Fire Protection Improvement Plan Status Rept for Period Ending 940501,per Agreement Made During 910819 Working Meeting)
- ML20079H548 + (Forwards Fire Protection Improvement Plan Designed to Effect Complete Program Recovery,Per 910819 Working Meeting W/Nrc)
- ML20076M429 + (Forwards Fire Protection Improvement Plan Periodic Status Rept,As Result of Agreement Made at 910819 Meeting W/Nrc. Commitment Date to Complete Four Phases of Fire Protection Improvement Plan Is 951201)
- L-79-280, Forwards Fire Protection Info Re Preliminary Schedule Mod, Fire Pump Controller Evaluation & Cable Area Evaluation in Response to NRC + (Forwards Fire Protection Info Re Preliminary Schedule Mod, Fire Pump Controller Evaluation & Cable Area Evaluation in Response to NRC)
- ML19340B800 + (Forwards Fire Protection Info for Fire Area 13,per NRC Request)
- ML20212G987 + (Forwards Fire Protection Insp Repts 50-254/97-16 & 50-265/97-16 on 970825-29 & Notice of Violation.Violation Demonstrated Plant Personnel Involved in Hot Work Activities Unaware of Requirements Delineated in Procedures)
- ML13323B233 + (Forwards Fire Protection Insp Repts 50-206/87-09, 50-361/87-08 & 50-362/87-09 on 870330-0403.No Violations Noted)
- ML20148Q745 + (Forwards Fire Protection Insp Repts 50-327/88-24 & 50-328/88-24 on 880314-18.Violation Noted Under Consideration for Escalated Enforcement Action.No Notice of Violation Being Issued)
- ML17334A637 + (Forwards Fire Protection Insp Repts 50-315/98-02 & 50-316/98-02 on 980105-09.No Violations Noted)
- ML20113C222 + (Forwards Fire Protection Mod Progress Rept & Fire Endurance & Hose Stream Tests on Wall Penetration Fire Stops ..., Per 830225 Proposal to Submit Progress Rept Every 4 Months)
- ML20084R282 + (Forwards Fire Protection Mod Progress Rept, Fire Endurance & Hose Stream Tests on Wall Penetration Fire Stops,Design WP694 & Wp 713 & Fire Endurance Hose Stream Tests on Floor Penetration Fire Stops Design Fc 350)
- ML20132D281 + (Forwards Fire Protection Mod Progress Rept, Per .Requests Exemption from Requirement That Fixed Suppression Sys Be Installed in Fire Areas 8 & 50.Progress Rept Addressing Safe Shutdown Mods Also Encl)
- ML19321A480 + (Forwards Fire Protection Mod Schedule,Per NRC 800702 Request.Requests Approval.Seven Mods Have Completion Dates After 801101)
- ML20097G694 + (Forwards Fire Protection Mods Progress Rept,Update of Penetration Sealing Program & Fire Damper Program & Schedule,Fire Barrier Exemption Request & Section Addressing Miscellaneous Fire Barrier Concerns)
- ML20128D860 + (Forwards Fire Protection Mods Progress Rept for May 1985, Update of Penetration Sealing Program,Update of Fire Damper Program Including Exemption Request & Progress Rept Addressing Structural Fire Protection)
- ML19256E821 + (Forwards Fire Protection Mods for Fire Detection Water Suppression & Foam Suppression Sys,In Response to NRC Requests)
- ML20079L273 + (Forwards Fire Protection Operability Requirement 14,Issue 7 & Revised Table of Contents,Issue 16)
- ML20247C572 + (Forwards Fire Protection Operability Requirements 13 & 14 for Section FP.6.1 of Fire Protection Program Plan)
- ML20147B745 + (Forwards Fire Protection Plan Describing Fire Protection Administration Controls & Fire Barrier Tests)
- GO2-87-034, Forwards Fire Protection Program Description in Response to 870113-15 Fire Protection Insp to Facilitate Implementation of License Condition 2.C(14) + (Forwards Fire Protection Program Description in Response to 870113-15 Fire Protection Insp to Facilitate Implementation of License Condition 2.C(14))
- ML19331A764 + (Forwards Fire Protection Program Evaluation.Will Schedule Site Visit in Future Between First & Second Round Questions. Requests That First Round Questions on Fire Protection Be Submitted by 780115 to Meet Present Schedule.W/O Encl)
- ML19345E649 + (Forwards Fire Protection Program Evaluation, & Proposed Tech Specs for Fire Protection Sys.Final Mod Lists & Scheduled Completion Dates Will Be Submitted Early June 1977.Full Implementation of Guidelines Expected.W/O Encls)